Page 10
Step 6 Set Wall Frames Front and back wall frames are positioned between long side walls. B4 =($1'**%,(2%,9%1"2%f@\B_@e%/2'/%6'**%9/'&2$%'0'#($1%#($#32%,9%'%ID%$#32%6'**%9/'&24%;/'+2%6'**$ 6#1"%-/2\+)1%$1)3$4%IMPORTANT:%Z/#2(1%2(3%&'/M23%6#1"%'%D?D%1,%+,/(2/4%<2+)/2%9/'&2$ 1,021"2/%'1%1"2%+,/(2/%)$#(0%K]L%9,)/%BA3%$#(M2/$ @4 =($1'** 1"2 ,1"2/ f@\B_@e /2'/ 6'** 9/'&2 1, 1"2 /2'/ 6'** 9/'&24 d'#* 1"2 /2'/ 6'** 9/'&2$ 1,021"2/ 6"2/2%1"2.%8)11%6#1"%KIL%2#0"1%BA3%$#(M2/%K$1'002/%('#*$%,(%2'+"%$#32%,9%1"2%$1)3$L%4 F4 =($1'** ' B@D 9/'&27 (2E1 1, 1"2 9#/$1 ID $#32 6'** 9/'&24 d'#* 9/'&2$ 1,021"2/ 6"2/2 1"2.
Page 11
Step 7 Install 2x4 Tie Plates B4 =($1'**%'%BCD%*,(0%@E]%,(%1"2%8'+M%6'**4%5$2%BA3%$#(M2/$%$-'+2%BCe%'-'/1%1,%$2+)/2%1#2%-*'12$4 @4 :2-2'1%1,%#($1'**%'%BCD%*,(0%@E]%1#2%-*'12%,(%1"2%,--,$#12%9/,(1%6'**4 16' Long 2x4 Tie Plate 12' Long 2x4 Tie Plate Back Wall Frames F4 =($1'**%'%@E]\B@D%,(%1"2%$#32%6'**4%!"2%@E]%6#**%8)11%'0'#($1%1"2%BCD%*,(0%1#2%-*'12%,(%1"2%8'+M 6'**4%5$2%BA3%$#(M2/$4 ]4 =($1'**%'(,1"2/%%@E]\B@D%8,'/3$%,(%1"2%$'&2%$#32%6'**%9/'&24 `4 ?)1%1,%9#1%'(3%#($1'**%'%@E]\ID%8,'/3%1,%9#(#$"4 C4 :2-2'1%1,%#($1'**%@E]%1#2%-*'12$%,(%1"2%,--,$#12%$#326'**%9/'&2$4 Step 8A Install Siding on Wall Frames If a siding panel has a damaged edge, install this edge at a corner where it will be covered with corner trim.
Page 13
Step 13A Assemble Rear Gable Assemble the roof gables and trusses on the center of the loft floor. This will make it easier to stand the gable upright over the lower wall. B4 ?)1 K@L 16, @E]\BAD 8,'/3$ 1, ' *2(01" ,9 f^\B_@e4 R,$#1#,( 1"2$2 @E]$7 on edge '(3 8)11 1,021"2/4 @4 R,$#1#,(%K@L%16,%IB\F_]e%*,(0%@EC$%'(3%K@L%16,%^B\F_Ie%*,(0%@EC%8,'/3$%,(%1"2%@E]%-*'12$%'$ $",6(%82*,64%!"2%1,-%@EC%8,'/3$%"'G2%8*)2%&'/M$%,(%1"2%2(3$4%R,$#1#,(%1"2$2%2(3$%1,021"2/ '1%1"2%1,-4...
Page 14
Step 13B Assemble Rear Gable continued Two Ridge Gussets have equal angles cuts. Four Knee Gussets have offset angles cuts. B4 <2+)/2%1"2%@EC%8,'/3$%1,021"2/%'1%1"2%M(22%'(3%/#302%6#1"%B_@e%Z<;%0)$$21$4 5$2%C3%+,&&,(%('#*$4%d'#*%`\B_]e%E%B@e%Z<;%9#**2/$%6"2/2%$",6(%82*,64 5/1/4" x 12" OSB Gusset 1/2" Gusset at Ridge 5-1/4" x 12" 1/2" Gusset OSB Filler at Knee @4 R*'+2 K@L 16, IB\F_]e '(3 K@L 16, ^B\F_Ie @EC$ ,G2/ 1"2 9#**2/$4 <2+)/2 )$#(0 KCL $#E BA3 $#(M2/$ 6"2/2%9#**2/$%'(3%0)$$21$%'/2%*,+'1234 F4 =($1'** ' @B\F_]e "#0"...
Page 27
Step 30 Install Roofing — Not Supplied in Kit Optional Roof Covering B4 =($1'**%&21'*%/,,9%D3/#-D%230#(0%'*,(0%1"2 -2/#&212/%,9%1"2%/,,94 83*4 :,,9%<"#(0*2$ @4 =($1'**%$"#(0*2$%'++,/3#(0%1,%1"2%#($1/)+1#,($ -+$4 :,,9%D3/#-D%a302\BAD ,(%1"2%6/'--2/4 fFA $N4%914 T2*1%R'-2/ l1.4 Material Shipped in Extersion Kit Qty. Material Shipped by Local Supplier @EC%%E%IB\F_]e% !/)$$%!,-%?,/3 R/2\+)1%b'**%<1)3$ ] 2'4 @EC%%E%^B\F_Ie% !/)$$%Q20 b'**%R*'12$%K1/2'123L...
Page 28
R'+M#(0 Q#$1 k2992/$,(%BCD%b#32%E%F@D%;)#*3#(0%i#1 Qty. Material Shipped on 'B' Pallet Qty. Material Shipped on 'A' Pallet !/)$$%\%!,-%?,/3 E IB\F_]e R/2\8)#*1%U'8*2%T/'&2$ @B\F_]e E% U'8*2%ZG2/"'(0 E IB\F_]e R/2\8)#*1%U'8*2%T/'&2$ Bf\B_]e E U'8*2%b'**%<1)3$ E C]\B_@e R/2\8)#*1%@E]%S,,/%P2'32/ @E] F^\B_@e U'8*2%!/#& R/2\8)#*1%@E]%b34%P2'32/ %%% ] U'8*2%!/#& E I@\B_]e !/)$$%\%Q20$ E ^B\F_Ie QR%<#3#(0%R'(2*$...
Need help?
Do you have a question about the Jefferson and is the answer not in the manual?
Questions and answers