Download Print this page
Reynolds Building Systems Virginia Assembly Book

Reynolds Building Systems Virginia Assembly Book

16'x28' building
Hide thumbs Also See for Virginia:

Advertisement

Quick Links

Sentry Buildings
Assembly Book
:2G#$23%H'/+"%I7%@A@@
the Virginia
BCDE@FD%;)#*3#(0
Manufactured by Reynolds Building Systems, Inc.
205 Arlington Drive
Greenville, PA 16125
!"#$%&'()'*%#$%+,-./#0"1234%5(32/%1"2%+,-./#0"1%*'6$7%1"#$%&'()'*
&'. (,1 82 +,-#237 #( 6",*2 ,/ #( -'/17 6#1",)1 +,($2(1 9/,& :2.(,*3$
;)#*3#(0%<.$12&$7%=(+4
>%%?,-./#0"1%@A@A

Advertisement

loading
Need help?

Need help?

Do you have a question about the Virginia and is the answer not in the manual?

Questions and answers

Summary of Contents for Reynolds Building Systems Virginia

  • Page 1 Sentry Buildings Assembly Book :2G#$23%H'/+"%I7%@A@@ the Virginia BCDE@FD%;)#*3#(0 Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 !"#$%&'()'*%#$%+,-./#0"1234%5(32/%1"2%+,-./#0"1%*'6$7%1"#$%&'()'* &'. (,1 82 +,-#237 #( 6",*2 ,/ #( -'/17 6#1",)1 +,($2(1 9/,& :2.(,*3$ ;)#*3#(0%<.$12&$7%=(+4 >%%?,-./#0"1%@A@A...
  • Page 2 MPORTANT NFORMATION BOUT ?"2+M 6#1" .,)/ *,+'* PZX ,/ 8)#*3#(0 +,32 ,99#+2 9,/ '(. /2N)#/2&2(1$7 Building Permits: /2$1/#+1#,($%,/%-2/&#1$%(2+2$$'/.%9,/%+,($1/)+1#,(4 ;.%,6(2/4%:292/%1,%(2E1%-'02%9,/%9,)(3'1#,(%$)002$1#,($%'(3%$#[24 Foundation: Z)/ -'+M'02 #(+*)32$ -/2\+)1 &'12/#'*$ 9,/ 1"2 @(3 9*,,/ /,,9 0'8*2$7 /,,9 What's Included: 1/)$$2$7 $1'#/ M#17 -/2\8)#*1 8'/( 3,,/$ '(3 0'8*2 1/#&4 !6, $#(0*2 ")(0 #($)*'123 6#(3,6$ 6#1" 1/#&...
  • Page 3 Foundation Types & Measurements ImportantW J,) 6#** (223 1, "'G2 ' -/,-2/ 9,)(3'1#,( #($1'**23 1, $)--,/1 1"2 8)#*3#(04 S2-2(3#(0%,(%1"2%#(12(323%)$2%3212/&#(2$%6"'1%1.-2%,9%9,)(3'1#,(%#$%82$14 Do Not &'M2 1"2 9,)(3'1#,( *'/02/ 1"'( 1"2 8)#*3#(0 $#[24 a"2( #($1'**#(0 1"2 8)#*3#(0 ,( ' +,(+/212 $*'87 #($1'** 1"2 $#3#(0 9*)$" 6#1" 1"2 8,11,& -*'124 a"2( #($1'**#(0 ,( ' 6,,3 9*,,/7 2E12(3 1"2 $#3#(0 Id]e 82*,6 1"2 8,11,&...
  • Page 4 Step 1 Assemble (2) Two 92-1/2" Rear Wall Frames B4 ?)1 K@L 16, @E]\FD K,(2 6#** 82 1/2'123L 1, ' *2(01" ,9 f@\Bd@e4 R,$#1#,( 1"2 8,'/3$ 1,021"2/ '(3%#(3#+'12%6#1"%DgD%%&'/M$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'1234 @4 H'/M%'%D?D%'(.6"2/2%821622(%9#/$1%16,%$1)3%&'/M$4%!"#$%#$%/292/2(+23%#(%'%*'12/%$12-4 92-1/2 Top Wall Plate 92-1/2" Treated Bottom Plate 11-3/4" 16" 16"...
  • Page 5 Step 2 Assemble (4) Four 8' Long Side Wall Frames B4 <2*2+1%K@L%16,%@E]\FD%K,(2%6#**%82%1/2'123L%#9%(2+2$$'/.%1/#&%1,%'%*2(01"%,9%fCe4%R,$#1#,(%1"2 8,'/3$%1,021"2/%'(3%#(3#+'12%6#1"%DgD%%&'/M$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'1234 96" Top Wall Plate 96" Treated Bottom Plate 15-1/4" 16" 16" Stud Spacing @4 =($1'** K^L $2G2( -/2\+)1 6'** $1)3$ 821622( 1"2 1,- '(3 8,11,& -*'12$4 c'#* 1"2 1/2'123 8,11,&...
  • Page 6 Step 3B Assemble (2) Two 12' Side Wall Frames continued @4 =($1'** KBAL 12( -/2\+)1 6'** $1)3$ 821622( 1"2 1,- '(3 8,11,& -*'12$4 c'#* 1"2 1/2'123 8,11,&%-*'12%1,%2'+"%6'**%$1)3%6#1"%K@L%16,%BC3%0'*G'(#[23%32+M%('#*$4%5$2%K@L%16, BA3%+,'123%$#(M2/%('#*$%-2/%$1)3%1,%$2+)/2%1"2%1,-%-*'124 I4 :2-2'1%1,%8)#*3%'(,1"2/%B@D%*,(0%6'**%9/'&24 ]4 H'/M%8,1"%9/'&2$%DSide Wall Frames'%'(3%$21%9/'&2$%'$#324 Pre-cut 2x4 Wall Studs Treated Bottom Plate Step 4 Assemble Door Header B4 ?)1%K@L%16,%BAD%*,(0%@EF%8,'/3$%1,%'%*2(01"%,9%ffe4...
  • Page 7 Step 5 Assemble 15'-5" Front wall Door Frame B4 ?)1%K@L%16,%@E]\BCD%K,(2%6#**%82%1/2'123L%1,%'%*2(01"%,9%BF_e4%R,$#1#,(%1"2%8,'/3$%1,021"2/%'(3 #(3#+'12%6#1"%DgD%%&'/M$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'123%'(3%'(%D<D%6"2/2%1"2%3,,/%"2'32/ $)--,/1%$1)3$%6#**%82%*,+'12344 15' - 5" Wall Plates 99" Door Header Regular Treated 96" Door Opening 17-1/2" 28-1/2" 19-1/2" 17-1/2" When setting the wall panels the door opening can be positioned on the right, as shown below, or reverse framing to position on the left end of the wall.
  • Page 8 Step 6 Set Wall Frames Front and back wall frames are positioned between long side walls. B4 =($1'** ,(2 ,9 1"2 f@\Bd@e /2'/ 6'** 9/'&2$ '0'#($1 #($#32 ,9 ' FD $#32 6'** 9/'&24 IMPORTANT: Z/#2(1 2(3 &'/M23 6#1" ' D?D 1, +,/(2/4 <2+)/2 9/'&2$ 1,021"2/ '1 1"2 +,/(2/ )$#(0 K]L 9,)/ BA3 $#(M2/$4%;/'+2%6'**$%6#1"%-/2\+)1%$1)3$4 @4 =($1'** 1"2 ,1"2/ f@\Bd@e /2'/ 6'** 9/'&2 1, 1"2 /2'/ 6'** 9/'&24 c'#* 1"2 /2'/ 6'** 9/'&2$ 1,021"2/ 6"2/2%1"2.%8)11%6#1"%KFL%2#0"1%BA3%$#(M2/%K$1'002/%('#*$%,(%2'+"%$#32%,9%1"2%$1)3$L%4...
  • Page 9 Step 7 Install 2x4 Tie Plates B4 =($1'**%'%BCD%*,(0%@E]%,(%1"2%8'+M%6'**4%5$2%BA3%$#(M2/$%$-'+2%BCe%'-'/1%1,%$2+)/2%1#2%-*'12$4 @4 :2-2'1%1,%#($1'**%'%BCD%*,(0%@E]%1#2%-*'12%,(%1"2%,--,$#12%9/,(1%6'**4 12' Long 2x4 Tie Plate 16' Long 2x4 Tie Plate Back Wall Frames I4 ?)1%'%@E]\FD%#(%"'*9%'(3%#($1'**%'%]D%*,(0%@E]%,(%1"2%$#32%6'**4%!"2%@E]%6#**%8)11%'0'#($1%1"2 BCD%*,(0%1#2%-*'12%,(%1"2%8'+M%6'**4%5$2%BA3%$#(M2/$%$-'+23%B@e%'-'/14 ]4 =($1'**%K@L%16,%%@E]\B@D%8,'/3$%,(%1"2%$'&2%$#32%6'**%9/'&24%?)1%1"2%*'$1%8,'/3%1,%9#14 _4 <1'/1#(0%6#1"%*291%,G2/%]D%*,(0%@E]%#($1'**%@E]%1#2%-*'12$%,(%1"2%,--,$#12%$#32%6'**%9/'&2$4 Step 8A Install Siding on Wall Frames If a siding panel has a damaged edge, install this edge at a corner where it will be covered with corner trim.
  • Page 10 Step 8B Install Siding on Wall Frames continued B4 =($1'** ' 9)** 6#31" $#3#(0 -'(2* ,( 1"2 $#32 6'** 6#1" 1"2 DQXRD 2302 9*)$" 6#1" 1"2 @E]$ ,( 1"2 8'+M 6'**4 =($1'** KCL $#E &,/2 $#3#(0 -'(2*$4 =9 (2+2$$'/. +)1 *'$1 -'(2* 9*)$" 6#1" @E]$ ,( 9/,(1 6'**4%5$2%F3%0'*G4%8,E%('#*$%$-'+23%Fe%'-'/14 @4 =($1'**%'%$#3#(0%-'(2*%,(%1"2%8'+M%6'**%6#1"%1"2%DQXRD%2302%9*)$"%6#1"%1"2%$#3#(0%,(%1"2%$#32 6'**4%=($1'**%KIL%1"/22%&,/2%-'(2*$4...
  • Page 11 Step 9 thru 11 Steps not needed with this size and model. Step 12 Install Stairs IMPORTANT: Go now to the instructions in the stair kit book to install the stairs, floor joist and flooring.
  • Page 12 Step 13A Assemble Rear Gable Assemble the roof gables and trusses on the center of the loft floor. This will make it easier to stand the gable upright over the lower wall. B4 ?)1 K@L 16, @E]\BAD 8,'/3$ 1, ' *2(01" ,9 f^\Bd@e4 R,$#1#,( 1"2$2 @E]$7 on edge '(3 8)11 1,021"2/4 @4 R,$#1#,(%K@L%16,%FB\Id]e%*,(0%@EC$%'(3%K@L%16,%^B\IdFe%*,(0%@EC%8,'/3$%,(%1"2%@E]%-*'12$%'$ $",6(%82*,64%!"2%1,-%@EC%8,'/3$%"'G2%8*)2%&'/M$%,(%1"2%2(3$4%R,$#1#,(%1"2$2%2(3$%1,021"2/ '1%1"2%1,-4...
  • Page 13 Step 13B Assemble Rear Gable continued Two Ridge Gussets have equal angles cuts. Four Knee Gussets have offset angles cuts. B4 <2+)/2%1"2%@EC%8,'/3$%1,021"2/%'1%1"2%M(22%'(3%/#302%6#1"%Bd@e%Z<;%0)$$21$4 5$2%C3%+,&&,(%('#*$4%c'#*%_\Bd]e%E%B@e%Z<;%9#**2/$%6"2/2%$",6(%82*,64 5/1/4" x 12" OSB Gusset 1/2" Gusset at Ridge 5-1/4" x 12" 1/2" Gusset OSB Filler at Knee @4 R*'+2 K@L 16, FB\Id]e '(3 K@L 16, ^B\IdFe @EC$ ,G2/ 1"2 9#**2/$4 <2+)/2 )$#(0 KCL $#E BA3 $#(M2/$ 6"2/2%9#**2/$%'(3%0)$$21$%'/2%*,+'1234 I4 =($1'** ' @B\Id]e "#0"...
  • Page 14 Step 14 Install Siding on Rear Gable Frame B4 <1'(3%)-%1"2%0'8*2%9/'&2%'(3%$*#32%#1%1,%1"2%/2'/%,9%1"2%8)#*3#(04%R,$#1#,(%1"2%9/'&2%6#1"%1"2 8,11,&%1,6'/3$%1"2%/2'/%6'**%$,%#1%+'(%82%2/2+123%'912/%1"2%$#3#(0%#$%'--*#234 =($1'** ' -/2\+)1 $#3#(0 -'(2* 6#1" 1"2 D+)1 2302D 9*)$" 6#1" 1"2 *291 $#32 ,9 1"2 0'8*2 9/'&24 !"2 $#3#(0 $",)*3 2E12(3 Id]e 82*,6 1"2 8,11,& @E] 0'8*2 -*'124 =($1'** $#3#(0 6#1" F3 0'*G4 ('#*$4 =($1'** K@L 16, ]EF $#3#(0 -'(2*$4 ?)1 '(3 /2&,G2%$#3#(0%1"'1%2E12(3$%'8,G2%1"2%1,- ,9%1"2%0'8*2%9/'&24...
  • Page 15 Step 16 Install Rear Roof Gable 2x4-12' Vertical Boards B4 =($1'**%K@L%16,%@E]\B@D%8,'/3$%,(%1"2%8'+M%6'**%1,%-/2G2(1 1"2%0'8*2%9/,&%9'**#(0%,99%3)/#(0%0'8*2%#($1'**'1#,(4%=($1'** K@L 16, &,/2 @E]\B@ 8,'/3$ 1, 8/'+2 1"2 G2/1#+'* @E] #( -*'+24 ;29,/2 8/'+#(0 1"2 G2/1#+'* @E]$ #( -*'+2 '11'+" K@L%16,%@E]%8*,+M$%1,%1"2%8'+M%,9%1"2%@E]$4 !"#$%6#**%+/2'12%1"2%-/,-2/%$-'+#(0%1,%$21%1"2 0'8*2%,G2/%1"2%*,62/%6'**4 2x4 Block 2x4 Block 2x4-12' 2x4 Stake 2x4-12' Brace @4 `/2+1 1"2 0'8*2 ,( 8'+M 6'**4 ;2 +')1#,)$ '(3 2($)/2 0'8*2 $#3#(0 2E12(3$ ,G2/ 1/#&...
  • Page 16 Step 17 Assemble & Install Front Gable B4 :2-2'1%Step 13 1,%'$$2&8*2%9/,(1%0'8*24%X*12/%$1)3%9/'&#(0%9,/%6#(3,6%,-2(#(04%Q,+'12%KIL 1"/22%]^\Id]e%*,(0%@E]$4%?)1%KBL%,(2%1,%ICe4%R,$#1#,(%1"2$2%8,'/3$%'$%$",6(%82*,64%H2'$)/2 3#$1'(+2 1, 8,11,& 0'8*2 9/'&2 '(3 +)1 KIL 1"/22 @E]$ 1, 1"#$ *2(01" '(3 #($1'** )(32/ ICe 8,'/34 =($1'**%@E]$%6#1"%BA3%$#(M2/$4 @4 <*#32 0'8*2 1, 1"2 9/,(1 ,9 1"2 8)#*3#(04 47-3/4"...
  • Page 17 Step 19 Install 2x6 Soffit Blocks B4 =($1'** K]L 9,)/ BEI\FD $1/#--#(0 ,( 2'+" $#32 6'**4 <1'/1#(0 9/,& 8'+M 6'** 8)11 ' @EC $,99#1 8*,+M '0'#($1 1"2 8,11,& ,9 1"2 @EC 1/)$$ -*'124 R,$#1#,( 1"2 9#/$1 BEI 8,'/3 B\Bd@e 9/,& 8'+M 6'** 1/#& '(3 #(1, (,1+"4 Tip: use a 2x4 block as a gauge to set the 1x3 correctly4 ?,(1#()2 )$#(0 1"2 @EC $,99#1 8*,+M '$ ' 0')02 6"2( #($1'**#(0 (2E1 BEI 8,'/3$4 ?)1 1"2 *'$1 8,'/3 1, 9#1 B\Bd@e 9/,&...
  • Page 18 Step 20 Assemble Roof Trusses B4 Q'. 1/)$$ -'/1$ #($#32 1"2 @E] 8*,+M$ )$23 '/,)(3 0'8*2 9/'&2$4 Z(2 2(3 ,9 1"2 FB\Id]e *,(0 @EC 8,'/3$ "'G2 ' 8*)2 &'/M4 R*'+2 1"2$2 2(3$ 1,021"2/ '1 1"2 /#3024 X33 ' @E] 8*,+M '1 1"2 8,11,&%,9%1"2%1/)$$%*20$%1,%M22-%1"#$%@EC%9/,&%&,G#(04 @4 <2+)/2 1"2 @EC 8,'/3$ 1,021"2/ )$#(0 -/2\+)1 -*.6,,3 0)$$21$4 i(22 0)$$21$ '/2 @]e 6#324 :#302 0)$$21 #$ IB\Id]e 6#324 X--*.
  • Page 19 Step 21 Install Roof Trusses B4 =($1'**%@EC%"'(02/$%,G2/%1"2%DgD%&'/M$%,(%1"2%1/)$$%-*'12%'(3%9*)$"%6#1"%,)1$#32%2302%,9%@EC4 5$2%B\Bd@e%O,#$1%"'(02/%('#*$4%<21%1/)$$%*20$%#(1,%"'(02/4%5$2%BA3%+,'123%$#(M2/%('#*$%1,%$2+)/2 1"2%1/)$$%1,%1"2%&21'*%"'(02/%K)$2%"'(02/%2.2*21$%1,%0)#32%1"2%('#*$%'1%1"2%+,//2+1%'(0*2L4 2x4-12' Board @4 :2&,G2%1"2%@E]\B@D%8,'/3$%)$23%1,%8/'+2 1"2 9/,(1 0'8*24 X$ .,) -/,0/2$$ $211#(0 1/)$$2$ 1'+M%1"2$2%8,'/3$%1,%M22-%1/)$$2$%-*)&84 S,(D1 /2&,G2 1"2 @E]$ )(1#* 1"2 /,,9 $"2'1"#(0 #$%'--*#234 2x6 Metal Hanger Step 22 Install Soffit B4 U'1"2/ KfL (#(2 _\Bd]e E ]F\Id]e -/#&23 $,99#1 -'(2*$4 H2'$)/2 9/,&...
  • Page 20 Step 23 Install Front Gable Soffit B4 =($1'**%FB\Id]e%*,(0%@E]$%,(%1"2%1,-%,9%1"2%9/,(1 0'8*27 9*)$" 6#1" 1"2 1,- ,9 1"2 0'8*2 9/'&24 =($1'** 2x4x81-3/4" 1"2%2(3$%6#1"%1"2%8*)2%&'/M%1,021"2/%'1%1"2%-2'M ,9%1"2%0'8*24%5$2%BA3%$#(M2/$%$-'+23%B@e%'-'/14 @4 =($1'** F@\_dFe *,(0 @E]$ ,( 1"2 $#32 ,9 1"2 9/,(1 0'8*27%9*)$"%6#1"%1"2%$#32%,9%1"2%0'8*2%9/'&24 I4 =($1'** K@L 16, Fe 6#32 E ]F\Id]e $,99#1 -'(2*$ )(32/ 1"2 @E]$ 6#1"...
  • Page 21 Step 24B Install Roof Sheathing continued @4 <1'/1#(0 '1 0'8*2 M(22 #($1'** /,,9 $"2'1"#(0 '1 1"2 9/,(1 ,9 1"2 8)#*3#(07 refer to the sheathing 48"x59" Roof layout below4%5$#(0%'%$1/'#0"1%2302%-,$#1#,(%1"2 Sheathing 9#/$1 $"221$ -*)&8 6#1" 1"2 $,99#1 -'(2*$4 !"2 /,,9 $"2'1"#(0 $",)*3 &221 '1 +2(12/ ,9 1"2 1/)$$2$4 I4 ?)1%Z<;%9*)$"%6#1"%8'+M%0'8*2%$#3#(04 Straight Edge...
  • Page 22 Step 25A Install Front Gable Trim B4 =($2/1 ' FB\Id]e *,(0 @E] 821622( 1"2 $,99#1 -'(2*$ '(3 1"2 /,,9 $"2'1"#(0 ,( 1"2 )--2/ 0'8*24 5$2%B\Bd]e%1/#&%$+/26$%1,%$2+)/2%1"2%$,99#1%-'(2*$%1,%1"2%@E]$4%5$2%^3%$#(M2/$%1,%$2+)/2%1"2 /,,9%$"2'1"#(0%1,%1"2%@E]$4 @4 =($2/1%'(3%$2+)/2%F@\_dFe%*,(0%@E]$%821622(%1"2%$,99#1%-'(2*$%'(3%1"2%/,,9%$"2'1"#(0%,(%1"2 $#32%,9%1"2%0'8*24 2x4x81-3/4" 2x4x81-3/4" 2x4x82-5/8" 2x4x82-5/8" I4 =($1'**%'%I\Bd@e%E%Fe%1/#&%8,'/3 1,%1"2%8,11,&%,9%1"2%@E]$%)$#(0 B\Bd]e%1/#&%$+/26$4...
  • Page 23 Step 25B Install Front Gable Trim continued ]4 =($1'**%F@\Bd]e%*,(0%BEC%1/#&%8,'/3$%'1%1"2%1,-%,9%1"2%0'8*24 Blue Ends Together =($1'** 1"2 2(3 6#1" 1"2 8*)2 &'/M#(0 '1 1"2 /#3024 =($1'** BEC 9*)$" 6#1" 1"2 1,- ,9 1"2 /,,9 $"2'1"#(04 5$2 F3 0'*G4 ('#*$4 82-1/4" long 1x6 Trim _4 =($1'**%F]e%*,(0%BEC%1/#&%8,'/3$%'1 1"2%$#32%,9%1"2%0'8*27%9*)$"%6#1"%1"2 /,,9%$"2'1"#(04...
  • Page 24 Step 30 Install Roofing — Not Supplied in Kit Step 26 Install Door Trim B4 =($1'** I\^dFe E F]e -/#&23 QR 3,,/ O'&8 &'12/#'* 1, 1"2 $#32$ ,9 1"2 3,,/ ,-2(#(04 =($1'** 3,,/ O'&8%9*)$"%6#1"%1"2%$#3#(04%5$2%F3%0'*G4%('#*$4 @4 =($1'** K@L 16, ]fe *,(0 BE] 1/#& 8,'/3$ '(3 ' BEC M2.$1,(2 '+/,$$ 1"2 1,- ,9 1"2 3,,/ ,-2(#(04 =($1'**%1"2%1/#&%8,'/3$%+2(12/23%'+/,$$%1"2%,-2(#(0%'(3%Id]e%'8,G2%1"2%$#3#(04%!"2%2E-,$23 $#3#(0 6#** $2/G2 '$ ' 3,,/ $1,- 6"2( 1"2 3,,/$ '/2 +*,$234 5$2 F3 0'*G4 ('#*$ $-'+23 B@e '-'/14 1x6 Keystone...
  • Page 25: Install Doors

    Step 28 Install Doors If your door opening is out of square, the space around the doors will not be even. You can remove and re-position the side trim to make allowances for this. The side trim does not have to be flush with the frame of the door opening. You can move the trim in or out to make the door spacing equal.
  • Page 26 Step 29 Install Windows B4 X--*.%+')*M#(0%,(%$#3#(0%'/,)(3%1"2%6#(3,6%,-2(#(0%829,/2%#($1'**#(0%1"2%6#(3,6$4 @4 =($2/1%6#(3,6%#(%,-2(#(04%P,*3%1"2%6#(3,6%#(%-*'+2%)$#(0%'%926%F3%0'*G4%('#*$4 I4 ;)11 BEI 1/#& 8,'/3$ '*,(0 2'+" $#32 ,9 1"2 6#(3,67 9*)$" 6#1" 1"2 1,- 9/'&24 !"2 BEI $#32 1/#& 6#**%2E12(3%I\Bd@e%82*,6%1"2%6#(3,6%9/'&2%1,%/2+2#G2%1"2%8,11,&%1/#&4%!"2%1,-%1/#&%6#**%/2$1 ,(%1"2%$#32%1/#&4%:292/%1,%1"2%+"'/1%82*,6%9,/%1"2%1/#&%6#31"%'(3%*2(01"%1,%82%)$234 ]4 <2+)/2%1"2%1/#&%8,'/3$%)$#(0%KCL%$#E%$1'#(*2$$%1/#&%$+/26$4 _4 =($1'**%BE]%1/#&%'+/,$$%1"2%1,-4%X--*.%+')*M#(0%'*,(0%1"2%1,-%,9%1"2%1/#&%8,'/34 C4 ?)1%1,%9#1%'%BE]%1/#&%8,'/3%'(3%#($1'**%)(32/%1"2%6#(3,6%821622(%1"2%BEI%$#32%1/#&4 ^4 =($1'**%$")112/$%6#1"%$+/26$%-/,G#3234 Nailing Flange 1x3 Trim Window Trim Size...
  • Page 27 j#/0#(#'%BCD%a#32%E%@FD%;)#*3#(0%i#1 R'+M#(0 Q#$1 Qty. Material Shipped on 'A' Pallet Qty. Hardware Breakdown 'A' Pallet R/2\8)#*1%U'8*2%T/'&2$ @B\Id]e E% *8$4 U'*G'(#[23%<-#/'*%c'#*$ R/2\8)#*1%U'8*2%T/'&2$ Bf\Bd]e E *8$4 ?,'123%<#(M2/$ R/2\8)#*1%@E]%S,,/%P2'32/ @E] I^\Bd@e *8$4 U'*G'(#[23%c'#*$ R/2\8)#*1%@E]%a34%P2'32/ *8$4 U'*G'(#[23%<-#/'*%c'#*$ !/)$$%\%Q20$ E ^B\IdFe *8$4 ?,'123%<#(M2/$ !/)$$%R*'12$ *8$4 ?,&&,(%c'#*$ U'8*2%ZG2/"'(0 E F@\_dFe B\Bd@e P'(02/%c'#*$...
  • Page 28 l1.4 Material Shipped in 48" Door Ctn. Qty. Stair Material Shipped on 'B' pallet ]Fe%E%F]e R/2\8)#*1%S,,/$ @ B\Id]e%<#E%<12-%<1/#(02/$ BB\^dFe E ^_\_dFe B@e%E%]@e !/'($,&%a#(3,6$ @ B\Id]e%T#G2%%<12-%<1/#(02/$ BB\^dF E CI\Bd@e BE]e%E%F]e S,,/%!/#& BB <1'#/%!/2'3$ BA\Bd@e E BE]e%E%]F\Id]e S,,/%!/#& f :#$2/$ ^\Bd]e BECe%E%BAe i2.$1,(2 @ :#$2/$% C\Bd@e...