Download Print this page

Reynolds Building Systems Sentry Buildings West Virginia Assembly Book

16'x18' building

Advertisement

Quick Links

Sentry Buildings
Assembly Book
:2G#$23%H'.%BI7%@A@B
West Virginia
BCDE@FD%;)#*3#(0
Manufactured by Reynolds Building Systems, Inc.
205 Arlington Drive
Greenville, PA 16125
!"#$%&'()'*%#$%+,-./#0"1234%5(32/%1"2%+,-./#0"1%*'6$7%1"#$%&'()'*
&'.%(,1%82%+,-#237%#(%6",*2%,/%#(%-'/17%6#1",)1%+,($2(1%9/,&%:2.(,*3$
;)#*3#(0%<.$12&$7%=(+4
>%%?,-./#0"1%@A@A

Advertisement

loading
Need help?

Need help?

Do you have a question about the Sentry Buildings West Virginia and is the answer not in the manual?

Questions and answers

Summary of Contents for Reynolds Building Systems Sentry Buildings West Virginia

  • Page 1 Sentry Buildings Assembly Book :2G#$23%H'.%BI7%@A@B West Virginia BCDE@FD%;)#*3#(0 Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 !"#$%&'()'*%#$%+,-./#0"1234%5(32/%1"2%+,-./#0"1%*'6$7%1"#$%&'()'* &'.%(,1%82%+,-#237%#(%6",*2%,/%#(%-'/17%6#1",)1%+,($2(1%9/,&%:2.(,*3$ ;)#*3#(0%<.$12&$7%=(+4 >%%?,-./#0"1%@A@A...
  • Page 2 MPORTANT NFORMATION BOUT ?"2+M%6#1"%.,)/%*,+'*%PZX%,/%8)#*3#(0%+,32%,99#+2%9,/%'(.%/2N)#/2&2(1$7 Building Permits: /2$1/#+1#,($%,/%-2/&#1$%(2+2$$'/.%9,/%+,($1/)+1#,(4 ;.%,6(2/4%:292/%1,%(2E1%-'02%9,/%9,)(3'1#,(%$)002$1#,($%'(3%$#[24 Foundation: Z)/%-'+M'02%#(+*)32$%-/2\+)1%&'12/#'*$%9,/%1"2%@(3%9*,,/%/,,9%0'8*2$7%/,,9 What's Included: 1/)$$2$%'(3%0'8*2%1/#&4%!6,%$#(0*2%")(0%#($)*'123%6#(3,6$%6#1"%1/#&%'(3%G#(.*%$")112/$4%!"#$ &'12/#'*%#$%32*#G2/237%curb side in covered van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tep 30 Owner Supplied: 9,/%N)'(1#1.%(223234%R'#(1%9,/%$#3#(0%'(3%1/#&4%ZG2/"2'3%FD%E%C_C%0'/'02%3,,/%6#1"%*,6%"2'3/,,& "'/36'/27%*)&82/%1,%9/'&2%/,)0"%,-2(#(0$%9,/%6#(3,6$%'(3%,/%3,,/$%(,1%#(+*)323%#(%,)/%M#14 H,(3'.%1"/)%T/#3'. FAA\@]`\B`^^ FWAA%1,%`WAA%a! Assembly Help: b22M2(3%\%'912/%",)/$ ^@]\FCC\]c`^ 2&'#*%1,W%%questionsdbarnkits.com K(,/&'*% 8)$#(2$$% ",)/$L S,%(,%2E-,$2%*)&82/%'(3%$"221%0,,3$%1,%#(+*2&2(1%62'1"2/4 Care of product prior to assembly: X$$2&8*.%$",)*3%820#(%-/,&-1*.%1,%-/2G2(1%1"2%16#$1#(0%,9%*)&82/4%e,1#9.%,)/%+,&-'(.%6#1"#(...
  • Page 3 Foundation Types & Measurements ImportantW%J,)%6#**%(223%1,%"'G2%'%-/,-2/%9,)(3'1#,(%#($1'**23%1,%$)--,/1%1"2%8)#*3#(04 S2-2(3#(0%,(%1"2%#(12(323%)$2%3212/&#(2$%6"'1%1.-2%,9%9,)(3'1#,(%#$%82$14 Do Not &'M2%1"2%9,)(3'1#,(%*'/02/%1"'(%1"2%8)#*3#(0%$#[24%b"2(%#($1'**#(0%1"2%8)#*3#(0 ,(%'%+,(+/212%$*'87%#($1'**%1"2%$#3#(0%9*)$"%6#1"%1"2%8,11,&%-*'124%b"2(%#($1'**#(0%,(%'%6,,3 9*,,/7%2E12(3%1"2%$#3#(0%c_]f%82*,6%1"2%8,11,&%-*'12%1,%+,G2/%1"2%2302%,9%1"2%9*,,/#(04%%! Foundation TypesW%b"'1%9,)(3'1#,(%#$%82$1%32-2(3$%,(%6"'1%1.-2%,9%#12&$%6#**%82%$1,/234 !"2%8)#*3#(0%+,32%#(%.,)/%'/2'%6#**%'*$,%3212/&#(2%6"'1%1.-2%,9%9,)(3'1#,(%+'(%82%)$234 X%926%3#992/2(1%1.-2$%,9%9,)(3'1#,($%'/2%$",6(%82*,64%?"2+M%1"2%[,(#(0%'(3%8)#*3#(0%+,32 /2N)#/2&2(1$%#(%.,)/%'/2'4 Foundations Types b,,3%T*,,/%,(%:)((2/$W%%<)#1'8*2%9,/%$1,/'02 T*,'1#(0%<*'8%%X%+,(+/212%$*'8%#$%#32'* ,/%6,/M$",-4%!/2'123%CEC%*)&82/%,G2/%'%823 9,/%$1,/'02%,9%+'/$%,/%,1"2/%1.-2$%,9 ,9%0/'G2*%T*,,/%O,#$1%$",)*3%82%1/2'123%@EC "2'G.%#12&$4 $-'+23%BCf%,(%+2(12/%'(3%+,G2/23%6#1"%c_]f 1,(0)2%'(3%0/,,G2%6,,3%9*,,/#(04 Floating Cement Slab Wood Floor on Wood Runners Exterior Siding Information LP siding%"'$%'%`A%.2'/%6'//'(1.%'(3%#$%'*/2'3.%-/#&234 LAP Edge %X--*.%16,%+,'1$%,9%*'12E%'+/.*#+%-'#(1%9,/%1"2%9#(#$"%+,'14 %R'#(1%1"2%8,11,&%2302%,9%1"2%$#3#(07%this is important4 H'#(1'#(%Cf%1,%Ff%,9%+*2'/'(+2%9/,&%1"2%8,11,&%2302%,9...
  • Page 4 Step 1 Assemble (2) Two 92-1/2" Rear Wall Frames B4 ?)1%K@L%16,%@E]\FD%K,(2%6#**%82%1/2'123L%1,%'%*2(01"%,9%I@\B_@f4%R,$#1#,(%1"2%8,'/3$%1,021"2/ '(3%#(3#+'12%6#1"%DgD%%&'/M$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'1234 @4 H'/M%'%D?D%'(.6"2/2%821622(%9#/$1%16,%$1)3%&'/M$4%!"#$%#$%/292/2(+23%#(%'%*'12/%$12-4 92-1/2 Top Wall Plate 92-1/2" Treated Bottom Plate 11-3/4" 16" 16" Stud Spacing The length of pre-cut wall studs will vary from 92-1/4" to 93" depending on your locality. Note:%When building the lower walls, use treated 2x4s for the bottom wall plates.
  • Page 5 Step 2 Assemble (4) Four 8' Long Side Wall Frames If you are adding additional windows or doors, frame-in rough opening(s) per manufacturer's instructions. B4 <2*2+1%K@L%16,%@E]\FD%K,(2%6#**%82%1/2'123L%#9%(2+2$$'/.%1/#&%1,%'%*2(01"%,9%ICf4%R,$#1#,(%1"2 8,'/3$%1,021"2/%'(3%#(3#+'12%6#1"%DgD%%&'/M$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'1234 96" Top Wall Plate 96" Treated Bottom Plate 16" 15-1/4" 16" Stud Spacing @4 =($1'**%K^L%$2G2(%-/2\+)1%6'**%$1)3$%821622(%1"2%1,-%'(3%8,11,&%-*'12$4%%e'#*%1"2%1/2'123 8,11,&%-*'12%1,%2'+"%6'**%$1)3%6#1"%K@L%16,%BC3%0'*G'(#[23%32+M%('#*$4%5$2%K@L%16,%BA3 +,'123%$#(M2/%('#*$%-2/%$1)3%1,%$2+)/2%1"2%1,-%-*'124...
  • Page 6 Step 3B Assemble (2) Two 12' Side Wall Frames continued @4 =($1'**%KBAL%12(%-/2\+)1%6'**%$1)3$%821622(%1"2%1,-%'(3%8,11,&%-*'12$4%%e'#*%1"2%1/2'123 8,11,&%-*'12%1,%2'+"%6'**%$1)3%6#1"%K@L%16,%BC3%0'*G'(#[23%32+M%('#*$4%5$2%K@L%16, BA3%+,'123%$#(M2/%('#*$%-2/%$1)3%1,%$2+)/2%1"2%1,-%-*'124 c4 :2-2'1%1,%8)#*3%'(,1"2/%B@D%*,(0%6'**%9/'&24 ]4 H'/M%8,1"%9/'&2$%DSide Wall Frames'%'(3%$21%9/'&2$%'$#324 Pre-cut 2x4 Wall Studs Treated Bottom Plate Step 4 Assemble Door Header B4 ?)1%K@L%16,%BAD%*,(0%@EF%8,'/3$%1,%'%*2(01"%,9%IIf4 @4 Q,+'12%'%@]f%E%]Ff%%Z<;%-'(2*%-'+M23%#(%,)/%M#14%The panel is located below the hardware in 'A' pallet4%?)1%K@L%16,%^\B_]f%E%]Ff%9#**2/$%1,%9#1%821622(%1"2%@EF%8,'/3$4 c4 X--*.%6,,3%0*)2%1,%8,1"%$#32$%,9%2'+"%Z<;%9#**2/%6#1"%'%8/)$"%'(3%#($1'**%#(%1"2%+2(12/ ,9%1"2%@EF%8,'/3$4%e'#*%1,021"2/%)$#(0%BA3%+,'123%$#(M2/$4%5$2%KB@L%162*G2%('#*$%$-'+23...
  • Page 7 Step 5 Assemble 15'-5" Front wall Door Frame B4 ?)1%K@L%16,%@E]\BCD%K,(2%6#**%82%1/2'123L%1,%'%*2(01"%,9%B`D\`f4%R,$#1#,(%1"2%8,'/3$%1,021"2/%'(3 #(3#+'12%6#1"%DgD%%&'/M$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'123%'(3%'(%D<D%6"2/2%1"2%3,,/%"2'32/ $)--,/1%$1)3$%6#**%82%*,+'12344 15' - 5" Wall Plates 99" Door Header Regular Treated 96" Door Opening 13-1/2" 32-1/2" 17-3/4" 19-1/4" When setting the wall panels the door opening can be positioned on the right, as shown below, or the left end of the wall.
  • Page 8 Step 6 Set Wall Frames Front and back wall frames are positioned between long side walls. B4 =($1'**%,(2%,9%1"2%I@\B_@f%/2'/%6'**%9/'&2$%'0'#($1%#($#32%,9%'%FD%$#32%6'**%9/'&24%IMPORTANT: Z/#2(1%2(3%&'/M23%6#1"%'%D?D%1,%+,/(2/4%<2+)/2%9/'&2$%1,021"2/%'1%1"2%+,/(2/%)$#(0%K]L%9,)/%BA3 $#(M2/$4%;/'+2%6'**$%6#1"%-/2\+)1%$1)3$4 @4 =($1'**%1"2%,1"2/%I@\B_@f%/2'/%6'**%9/'&2%1,%1"2%/2'/%6'**%9/'&24%e'#*%1"2%/2'/%6'**%9/'&2$%1,021"2/ 6"2/2%1"2.%8)11%6#1"%KFL%2#0"1%BA3%$#(M2/%K$1'002/%('#*$%,(%2'+"%$#32%,9%1"2%$1)3$L%4 c4 =($1'**%'%B@D%9/'&27%(2E1%1,%1"2%9#/$1%FD%$#32%6'**%9/'&24%e'#*%9/'&2$%1,021"2/%6"2/2%1"2.%8)11 6#1"%KFL%2#0"1%BA3%$#(M2/$%K$1'002/%('#*$%,(%2'+"%$#32%,9%1"2%$1)3$L4 End Marked 'C' 92-1/2" End Wall Frames 12' Side Wall Frame End Marked 'C' 8' Side Wall Frame Brace wall frames with pre-cut wall studs.
  • Page 9 Step 7 Install 2x4 Tie Plates B4 =($1'**%'%BCD%*,(0%@E]%,(%1"2%8'+M%6'**4%5$2%BA3%$#(M2/$%$-'+2%BCf%'-'/1%1,%$2+)/2%1#2%-*'12$4 @4 :2-2'1%1,%#($1'**%'%BCD%*,(0%@E]%1#2%-*'12%,(%1"2%,--,$#12%9/,(1%6'**4 12' Long 2x4 Tie Plate 16' Long 2x4 Tie Plate Back Wall Frames c4 ?)1%'%@E]\FD%#(%"'*9%'(3%#($1'**%'%]D%*,(0%@E]%,(%1"2%$#32%6'**4%!"2%@E]%6#**%8)11%'0'#($1%1"2 BCD%*,(0%1#2%-*'12%,(%1"2%8'+M%6'**4%5$2%BA3%$#(M2/$%$-'+23%B@f%'-'/14 ]4 =($1'**%K@L%16,%%@E]\B@D%8,'/3$%,(%1"2%$'&2%$#32%6'**%9/'&24%?)1%1"2%*'$1%8,'/3%1,%9#14 `4 <1'/1#(0%6#1"%*291%,G2/%]D%*,(0%@E]%#($1'**%@E]%1#2%-*'12$%,(%1"2%,--,$#12%$#32%6'**%9/'&2$4 Step 8A Install Siding on Wall Frames If a siding panel has a damaged edge, install this edge at a corner where it will be covered with corner trim.
  • Page 10 Step 8B Install Siding on Wall Frames continued B4 =($1'**%'%9)**%6#31"%$#3#(0%-'(2*%,(%1"2%$#32%6'**%6#1"%1"2%DQXRD%2302%9*)$"%6#1"%1"2%@E]$%,(%1"2 8'+M%6'**4%=($1'**%KCL%$#E%&,/2%$#3#(0%-'(2*$4%=9%(2+2$$'/.%+)1%*'$1%-'(2*%9*)$"%6#1"%@E]$%,(%9/,(1 6'**4%5$2%F3%0'*G4%8,E%('#*$%$-'+23%Ff%'-'/14 @4 =($1'**%'%$#3#(0%-'(2*%,(%1"2%8'+M%6'**%6#1"%1"2%DQXRD%2302%9*)$"%6#1"%1"2%$#3#(0%,(%1"2%$#32 6'**4%=($1'**%c%&,/2%-'(2*$4 c4 =($1'**%$#3#(0%,(%,--,$#12 $#32%6'**4 Edge Install This Panel First ]4 H2'$)/#(0%9/,&%1"2%D1,(0)2D%23027%+)1%'%$#3#(0%-'(2*%1,%'%6#31"%,9%@Ff4%=($1'**%1"#$%$#3#(0 -'(2*%,(%1"2%9/,(1%6'**%6#1"%1"2%D+)1D%2302%9*)$"%6#1"%1"2%$#3#(0%,(%1"2%$#32%6'**4%?)1%'(3 /2&,G2%1"2%$#3#(0%1"'1%2E12(3$%,G2/%1"2%6#(3,6%,-2(#(04 `4 =($1'**%'%9)**%6#31"%$#3#(0%-'(2*4%:2&,G2 $#3#(0%1"'1%2E12(3$%,G2/%1"2%6#(3,6%,-2(#(04 C4 Q,+'12%K@L%16,%B]\B_@f%E%]Ff%$#3#(0%-'(2*$4 ?)1%1"2$2%1,%9#1%'8,G2%3,,/%,-2(#(07%9*)$" 6#1"%8,11,&%,9%3,,/%"2'32/4 ^4 =($1'**%1"2%/2&'#(#(0%$#3#(0%-'(2*%,(%1"2 6'**%9/'&24 F4 ?)1%'(3%/2&,G2%@E]%-*'12%1"'1%2E12(3$%'+/,$$ 1"2%3,,/%,-2(#(04%<'G2%1"2%@E]7%#1%6#**%82 )$23%#(%'%*'12/%$12-4 Cut &...
  • Page 11 Step 9 thru 11 Steps not needed with this size and model. Step 12 Install Stairs IMPORTANT: Go now to the instructions in the stair kit book to install the stairs, floor joist and flooring.
  • Page 12 Step 13A Assemble Rear Gable Assemble the roof gables and trusses on the center of the loft floor. This will make it easier to stand the gable upright over the lower wall. B4 ?)1%K@L%16,%@E]\BAD%8,'/3$%1,%'%*2(01"%,9%I^\B_@f4%R,$#1#,(%1"2$2%@E]$7%on edge%'(3%8)11%1,021"2/4 @4 R,$#1#,(%K@L%16,%FB\c_]f%*,(0%@EC$%'(3%K@L%16,%^B\c_Ff%*,(0%@EC%8,'/3$%,(%1"2%@E]%-*'12$%'$ $",6(%82*,64%!"2%1,-%@EC%8,'/3$%"'G2%8*)2%&'/M$%,(%1"2%2(3$4%R,$#1#,(%1"2$2%2(3$%1,021"2/ '1%1"2%1,-4 81-3/4" Long 2x4 Block Truss Top Truss Knee...
  • Page 13 Step 13B Assemble Rear Gable continued Two Ridge Gussets have equal angles cuts. Four Knee Gussets have offset angles cuts. B4 <2+)/2%1"2%@EC%8,'/3$%1,021"2/%'1%1"2%M(22%'(3%/#302%6#1"%B_@f%Z<;%0)$$21$4 5$2%C3%+,&&,(%('#*$4%e'#*%`\B_]f%E%B@f%Z<;%9#**2/$%6"2/2%$",6(%82*,64 5/1/4" x 12" OSB Gusset 1/2" Gusset at Ridge 5-1/4" x 12" 1/2" Gusset OSB Filler at Knee @4 R*'+2%K@L%16,%FB\c_]f%'(3%K@L%16,%^B\c_Ff%@EC$%,G2/%1"2%9#**2/$4%<2+)/2%)$#(0%KCL%$#E%BA3%$#(M2/$ 6"2/2%9#**2/$%'(3%0)$$21$%'/2%*,+'1234 c4 =($1'**%'%@B\c_]f%"#0"%-/2\8)#*1%0'8*2%9/'&2%'1%1"2%-2'M%,9%1"2%3,)8*2%/,6%,9%1/)$$2$4%<2+)/2%1"2...
  • Page 14 Step 14 Install Siding on Rear Gable Frame B4 <1'(3%)-%1"2%0'8*2%9/'&2%'(3%$*#32%#1%1,%1"2%/2'/%,9%1"2%8)#*3#(04%R,$#1#,(%1"2%9/'&2%6#1"%1"2 8,11,&%1,6'/3$%1"2%/2'/%6'**%$,%#1%+'(%82%2/2+123%'912/%1"2%$#3#(0%#$%'--*#234 =($1'**%'%-/2\+)1%$#3#(0%-'(2*%6#1"%1"2%D+)1%2302D%9*)$"%6#1"%1"2%*291%$#32%,9%1"2%0'8*2%9/'&24%!"2 $#3#(0%$",)*3%2E12(3%c_]f%82*,6%1"2%8,11,&%@E]%0'8*2%%-*'124%%=($1'**%$#3#(0%6#1"%F3%0'*G4%('#*$4 =($1'**%K@L%16,%]EF%$#3#(0%-'(2*$4%?)1%'(3 /2&,G2%$#3#(0%1"'1%2E12(3$%'8,G2%1"2%1,- ,9%1"2%0'8*2%9/'&24 ]4 =($1'**%FA\B_@f%*,(0%$#3#(0%-'(2*4 ?)1%1"2%$#3#(0%1"'1%2E12(3$%82.,(3 1"2%0'8*2%9'&24 Siding Flush with Frame 16' Rear Wall Step 15 Install Trim on Front and Back Walls IMPORTANT: Trim Must Be Installed Before Installing Roof Gables! All trim is installed using 8d galvanized box nails spaced 12"...
  • Page 15 Step 16 Install Rear Roof Gable 2x4-12' Vertical Boards B4 =($1'**%K@L%16,%@E]\B@D%8,'/3$%,(%1"2%8'+M%6'**%1,%-/2G2(1 1"2%0'8*2%9/,&%9'**#(0%,99%3)/#(0%0'8*2%#($1'**'1#,(4%=($1'** K@L%16,%&,/2%@E]\B@%8,'/3$%1,%8/'+2%1"2%G2/1#+'*%@E]%#(%-*'+24 ;29,/2%8/'+#(0%1"2%G2/1#+'*%@E]$%#(%-*'+2%'11'+" K@L%16,%@E]%8*,+M$%1,%1"2%8'+M%,9%1"2%@E]$4 !"#$%6#**%+/2'12%1"2%-/,-2/%$-'+#(0%1,%$21%1"2 0'8*2%,G2/%1"2%*,62/%6'**4 2x4 Block 2x4 Block 2x4-12' 2x4 Stake 2x4-12' Brace @4 a/2+1%1"2%0'8*2%,(%8'+M%6'**4%;2%+')1#,)$%'(3%2($)/2%0'8*2%$#3#(0%2E12(3$%,G2/%1/#&%,(%8'+M 6'**4%?2(12/%0'8*2%6#1"%8,11,&%@E]%2E12(3#(0%B\B_@f%-'$1%*,62/%6'**%@E]$%,(%8,1"%$#32$4%e'#* 1,%9*,,/%)$#(0%BA3%$#(M2/$4 c4 :2&,G2%1"2%6'**%8/'+2$%9/,&%#(12/#,/%6'**$%'(3%)$2%1"2&%1,%8/'+2%1"2%0'8*2%1,%1"2%*,91%9*,,/4 ]4 e'#*%8,11,&%2302%,9%$#3#(0%1,%BE]%1/#& 6#1"%F3%0'*G'(#[23%8,E%('#*$4 Siding Extends Over Brace Gable with Trim.
  • Page 16 Step 17 Assemble & Install Front Gable B4 :2-2'1%Step 13 1,%'$$2&8*2%9/,(1%0'8*24%X*12/%$1)3%9/'&#(0%9,/%6#(3,6%,-2(#(04%Q,+'12%KcL 1"/22%]^\c_]f%*,(0%@E]$4%?)1%KBL%,(2%1,%cCf4%R,$#1#,(%1"2$2%8,'/3$%'$%$",6(%82*,64%H2'$)/2 3#$1'(+2%1,%8,11,&%0'8*2%9/'&2%'(3%+)1%KcL%1"/22%@E]$%1,%1"#$%*2(01"%'(3%#($1'**%)(32/%cCf%8,'/34 =($1'**%@E]$%6#1"%BA3%$#(M2/$4 @4 <*#32%0'8*2%1,%1"2%9/,(1%,9%1"2%8)#*3#(04 47-3/4" R,$#1#,(%1"2%9/'&2%6#1"%1"2%8,11,&%1,6'/3$ Long 2x4 1"2%9/,(1%6'**%$,%#1%+'(%82%2/2+123%'912/%1"2 $#3#(0%#$%'--*#234 c4 :2-2'1%Step 14%1,%'--*.%0'8*2%$#3#(04%?)1%'(3 36" Long /2&,G2%$#3#(0%9/,&%1"2%6#(3,6%,-2(#(04 ]4 :2&,G2%1"2%@E]\B@D%8,'/3$%)$23%9,/%8/'+#(0 ,(%8'+M%0'8*2%'(3%/2-2'1%Step 16%1,%#($1'** 1"2%9/,(1%0'8*24 Do not remove 2x4 blocks from floor. They will be used to assemble trusses.
  • Page 17 Step 19 Install 2x6 Soffit Blocks B4 =($1'**%K]L%9,)/%BEc\FD%$1/#--#(0%,(%2'+"%$#32%6'**4%<1'/1#(0%9/,& 8'+M%6'**%8)11%'%@EC%$,99#1%8*,+M%'0'#($1%1"2%8,11,&%,9%1"2%@EC%1/)$$ -*'124%R,$#1#,(%1"2%9#/$1%BEc%8,'/3%B\B_@f%9/,&%8'+M%6'**%1/#&%'(3 #(1,%(,1+"4%Tip: use a 2x4 block as a gauge to set the 1x3 correctly4 ?,(1#()2%)$#(0%1"2%@EC%$,99#1%8*,+M%'$%'%0')02%6"2(%#($1'**#(0%(2E1 BEc%8,'/3$4%?)1%1"2%*'$1%8,'/3%1,%9#1%B\B_@f%9/,&%9/,(1%0'8*2%1/#&4 5$2%^3%$#(M2/$%('#*#(0%6"2/2%$1)3$%'/2%*,+'1234 2x6 Truss Plate 2x6 Soffit Block 1x4 Corner Trim 2x4 Gauge Block @4 =($1'**%$,99#1%8*,+M$%)(32/%2'+"%DgD%,(%1"2%1/)$$%-*'124<2+)/2%1"2%1,-%,9%1"2%$,99#1%8*,+M$%#( -*'+2%8.%$+/26#(0%1"/,)0"%1"2%@EC%#(1,%1"2%$,99#1%8*,+M%6#1"%@\B_@f%32+M%$+/26$4%S/#**%' B_Ff%3#'&212/%",*2%1,%-/2G2(1%1"2%6,,3%9/,&%$-*#11#(04 Install 2x4 Double Block...
  • Page 18 Step 20 Assemble Roof Trusses B4 Q'.%1/)$$%-'/1$%#($#32%1"2%@E]%8*,+M$%)$23%'/,)(3%0'8*2%9/'&2$4%Z(2%2(3%,9%1"2%FB\c_]f%*,(0 @EC%8,'/3$%"'G2%'%8*)2%&'/M4%R*'+2%1"2$2%2(3$%1,021"2/%'1%1"2%/#3024%X33%'%@E]%8*,+M%'1%1"2 8,11,&%,9%1"2%1/)$$%*20$%1,%M22-%1"#$%@EC%9/,&%&,G#(04 @4 <2+)/2%1"2%@EC%8,'/3$%1,021"2/%)$#(0%-/2\+)1%-*.6,,3%0)$$21$4%i(22%0)$$21$%'/2%@]f%6#324 :#302%0)$$21%#$%cB\c_]f%6#324%%X--*.%6,,3%0*)2%6#1"%'%8/)$"%821622(%1"2%0)$$21$%'(3%1"2%@EC 8,'/3$4%<2+)/2%0)$$21$%6#1"%KcL%1"/22%/,6$%,9%C3%+,&&,(%('#*$%$-'+23%Cf%'-'/14%Importanth 6"2(%#($1'**#(0%1"2%0)$$21%'1%1"2%M(227%#($1'**%0)$$21%6#1"%1"2%$",/12$1%'(0*23%$#32%1,6'/3$%1"2 /#3024%See detail at bottom of page4 c4 !)/(%1/)$$%,G2/%'(3%'--*.%0)$$21$%1,%1"2%,1"2/%$#324%<21%1/)$$%'$#324 ]4 X$$2&8*2%KB@L%162*G2%&,/2%1/)$$2$4%:2&,G2%@E]%8*,+M$ 9/,&%9*,,/4 71-3/8" Truss 30" Wide Gusset Member Add 2x4 Block 31-3/4" Wide Gusset 81-3/4" Truss Member Short Side of Gusset Towards Ridge...
  • Page 19 Step 21 Install Roof Trusses B4 =($1'**%@EC%"'(02/$%,G2/%1"2%DgD%&'/M$%,(%1"2%1/)$$%-*'12%'(3%9*)$"%6#1"%,)1$#32%2302%,9%@EC4 5$2%B\B_@f%O,#$1%"'(02/%('#*$4%<21%1/)$$%*20$%#(1,%"'(02/4%5$2%BA3%+,'123%$#(M2/%('#*$%1,%$2+)/2 1"2%1/)$$%1,%1"2%&21'*%"'(02/%K)$2%"'(02/%2.2*21$%1,%0)#32%1"2%('#*$%'1%1"2%+,//2+1%'(0*2L4 2x4-12' Board @4 :2&,G2%1"2%@E]\B@D%8,'/3$%)$23%1,%8/'+2 1"2%9/,(1%0'8*24%X$%.,)%-/,0/2$$%$211#(0%1/)$$2$ 1'+M%1"2$2%8,'/3$%1,%M22-%1/)$$2$%-*)&84 S,(D1%/2&,G2%1"2%@E]$%)(1#*%1"2%/,,9%$"2'1"#(0 #$%'--*#234 2x6 Metal Hanger Step 22 Install Soffit B4 U'1"2/%KIL%(#(2%`\B_]f%E%]F\c_]f%-/#&23 $,99#1%-'(2*$4%H2'$)/2%9/,&%1"2%9'+2%,9%1"2 3,)8*2%8*,+M%1,%1"2%+2(12/%,9%1"2%9#/$1%$,99#1 8*,+M4%?)1%,(2%$,99#1%-'(2*%1,%1"#$%*2(01" /2&,G#(0%1"2%DQXRD%23024%=($1'**%6#1"%+)1 2302%9*)$"%6#1"%1"2%3,)8*2%$,99#1%8*,+M%'(3 1"2% D1,(0)2D% 2302% +2(12/% ,9% $,99#1% 8*,+M4 <2+)/2% 1,% 8*,+M$% '(3% BEc% )$#(0% % B\B_]f 'Tongue' Edge $1'#(*2$$%1/#&%$+/26$4 @4 =($1'**%9)**%*2(01"%$,99#1%-'(2*$%'*,(0%1"2...
  • Page 20 Step 23 Install Front Gable Soffit B4 =($1'**%FB\c_]f%*,(0%@E]$%,(%1"2%1,-%,9%1"2%9/,(1 0'8*27%9*)$"%6#1"%1"2%1,-%,9%1"2%0'8*2%9/'&24%=($1'** 2x4x81-3/4" 1"2%2(3$%6#1"%1"2%8*)2%&'/M%1,021"2/%'1%1"2%-2'M ,9%1"2%0'8*24%5$2%BA3%$#(M2/$%$-'+23%B@f%'-'/14 @4 =($1'**%F@\`_Ff%*,(0%@E]$%,(%1"2%$#32%,9%1"2%9/,(1 0'8*27%9*)$"%6#1"%1"2%$#32%,9%1"2%0'8*2%9/'&24 c4 =($1'**%K@L%16,%Ff%6#32%E%]F\c_]f%-/#&23%$,99#1 -'(2*$%)(32/%1"2%@E]$%6#1"%-/#&23%$#32%3,6(%'(3 2x4x 82-5/8" 1"2%DQXRD%2302$%1,021"2/%'1%1"2%M(22%,9%1"2%0'8*24 5$2%B\B_]f%$1'#(*2$$%1/#&%$+/26$%$-'+23%B@f%'-'/14 ]4 ?)1%'%$,99#1%-'(2*%1,%9#1%82\ 1622(%1"2%1,-%$,99#1%-'(2* '(3%1"2%-2'M4 8" Soffit Panels 8" Soffit Panel LAP Edges `4 ?)1%'%$,99#1%-'(2*%1,%9#1%9*)$" 6#1"%1"2%8,11,&%@E]4 :#302%j2(1 <"#(0*2$ Step 24A Install Roof Sheathing <-'+2 B4 :292/%1,%(2E1%-'02%9,/%1"2%-/,-2/%*'.,)1%,9%1"2%^_BCf%Z<;%$"2'1"#(04%H'M2%+2/1'#(%1"2 1/)$$2$%'(3%1"2%0'8*2$%'/2%-*)&84%=($1'**%'%-*.+*#-%821622(%2'+"%1/)$$%,(%1"2%1,-%/,6%,9...
  • Page 21 Step 24B Install Roof Sheathing continued @4 <1'/1#(0%'1%0'8*2%M(22%#($1'**%/,,9%$"2'1"#(0%'1 1"2%9/,(1%,9%1"2%8)#*3#(07%refer to the sheathing layout below4%5$#(0%'%$1/'#0"1%2302%-,$#1#,(%1"2 48"x59" Roof Sheathing 9#/$1%$"221$%-*)&8%6#1"%1"2%$,99#1%-'(2*$4%!"2%/,,9 $"2'1"#(0%$",)*3%&221%'1%+2(12/%,9%1"2%1/)$$2$4 c4 ?)1%Z<;%9*)$"%6#1"%8'+M%0'8*2%$#3#(04 Straight Edge ]4 ?)1%1"2%8,11,&%/,6%,9%$"2'1"#(0%1,%'%6#31"%,9 cCf%-2/%*'.,)14 `4 ?)1%1,-%/,6%,9%$"2'1"#(0%1,%9#14%Z/7%+)1%Bf%('//,62/ 1,%'**,6%9,/%G2(1#(04%=($1'**%KBL%,(2%-*.+*#- 821622(%2'+"%1/)$$%9,/%1"#$%/,64 C4 :2-2'1%,(%,--,$#12%$#32%,9%8)#*3#(04 48"x83" Roof Sheathing Upper sheathing can rest on lower sheathing Cut Top Row Width Plyclip Install Upper Sheathing Last...
  • Page 22 Step 25A Install Front Gable Trim B4 =($2/1%'%FB\c_]f%*,(0%@E]%821622(%1"2%$,99#1%-'(2*$%'(3%1"2%/,,9%$"2'1"#(0%,(%1"2%)--2/%0'8*24 5$2%B\B_]f%1/#&%$+/26$%1,%$2+)/2%1"2%$,99#1%-'(2*$%1,%1"2%@E]$4%5$2%^3%$#(M2/$%1,%$2+)/2%1"2 /,,9%$"2'1"#(0%1,%1"2%@E]$4 @4 =($2/1%'(3%$2+)/2%F@\`_Ff%*,(0%@E]$%821622(%1"2%$,99#1%-'(2*$%'(3%1"2%/,,9%$"2'1"#(0%,(%1"2 $#32%,9%1"2%0'8*24 2x4x81-3/4" 2x4x81-3/4" 2x4x82-5/8" 2x4x82-5/8" c4 =($1'**%'%c\B_@f%E%Ff%1/#&%8,'/3 1,%1"2%8,11,&%,9%1"2%@E]$%)$#(0 B\B_]f%1/#&%$+/26$4...
  • Page 23 Step 25B Install Front Gable Trim continued ]4 =($1'**%F@\B_]f%*,(0%BEC%1/#&%8,'/3$%'1%1"2%1,-%,9%1"2%0'8*24 Blue Ends Together =($1'**%1"2%2(3%6#1"%1"2%8*)2%&'/M#(0%'1%1"2%/#3024%=($1'**%BEC 9*)$"%6#1"%1"2%1,-%,9%1"2%/,,9%$"2'1"#(04%5$2%F3%0'*G4%('#*$4 82-1/4" long 1x6 Trim `4 =($1'**%F]f%*,(0%BEC%6"#12%-#(2%1/#& 8,'/3$%'1%1"2%$#32%,9%1"2%0'8*27%9*)$" 6#1"%1"2%/,,9%$"2'1"#(04 82-1/4" long 1x6 Trim C4 !"2/2%#$%(,%,G2/"'(0%,(%1"2%8'+M 0'8*24%X--*.%1/#&%3#/2+1*.%1,%1"2%$#3#(0 9*)$"%6#1"%1,-%,9%Z<;%/,,9%$"2'1"#(04 Step 26 Install 1x6 Door Jamb B4 ?)1%'%FD%%*,(0%BEC%8,'/3%1,%*2(01"%'(3 #($1'**%)(32/%1"2%3,,/%"2'32/7%9*)$" 6#1"%1"2%$#3#(04%%5$2%F3%0'*G4%('#*$4 @4 ?)1%'(3%#($1'**%BEC%E%FD%8,'/3$%,(%1"2 $#32$%,9%1"2%3,,/%,-2(#(04...
  • Page 24 Step 27 Install 1x4 Trim Around Door Opening 1x4 Door Trim B4 ?)1%1,%*2(01"%'(3%#($1'**%BE]\FD%1/#& 8,'/3$%,(%1"2%$#32$%,9%1"2%3,,/ ,-2(#(07%9*)$"%6#1"%1"2%BEC%O'&8%4 5$2%F3%0'*G4%('#*$4 @4 ?)1%'%BE]\BAD%1/#&%8,'/3%'(3%#($1'**%'+/,$$ 1"2%3,,/%,-2(#(07%+2(12/23%'+/,$$%1"2%1,- ,9%1"2%$#32%3,,/%1/#&4 Step 28 Install 2x4s Around Door Jamb B4 U'1"2/%@E]%8,'/3$%1"'1%62/2%)$23%9,/%6'**%'(3%0'8*2%8/'+#(04%?)1%1,%9#1%'(3%#($1'**%,(%1"2 #($#32%,9%1"2%3,,/%,-2(#(04%=($1'**%@E]$%,(%2'+"%$#32%'(3%'+/,$$%1"2%1,-%,9%3,,/%,-2(#(04 <2+)/2%1,%$1)3%6#1"%BA3%$#(M2/$4 1x6 Door Jamb 2x4 Cut to Fit 1x6 Door Jamb 2x4 Cut to Fit VIEW FROM INSIDE...
  • Page 25 Step 29 Install Windows B4 X--*.%+')*M#(0%'/,)(3%1"2%6#(3,6%,-2(#(0%829,/2%#($1'**#(0%1"2%6#(3,6$4 @4 =($2/1%6#(3,6%#(%,-2(#(04%P,*3%1"2%6#(3,6%#(%-*'+2%)$#(0%'%926%('#*$4%Note; the front flange projects past the window frame creating a slot for the trim4%%5$2%('#*$%6#1"%'%9*'1 "2'3%$,%1"2%1/#&%+'(%82%#($2/123%#(%1"2%$*,14%e'#*$%)$23%1,%#($1'**%$"#(0*2$%6,/M%62**4 c4 =($2/1%BEc%1/#&%8,'/3$%'*,(0%2'+"%$#32%,9%1"2%6#(3,67%9*)$"%6#1"%1"2%1,-%9/'&24%!"2%BEc $#32%1/#&%6#**%2E12(3%82*,6%1"2%6#(3,6%1,%/2+2#G2%1"2%8,11,&%1/#&4%!"2%1,-%1/#&%6#**%/2$1 ,(%1"2%$#32%1/#&4%:292/%1,%1"2%+"'/1%82*,6%9,/%1"2%1/#&%6#31"%'(3%*2(01"%1,%82%)$234 ]4 <2+)/2%1"2%1/#&%8,'/3$%)$#(0%KCL%$#E%$1'#(*2$$%1/#&%$+/26$4 `4 =($1'**%1/#&%'+/,$$%1"2%1,-4%X--*.%+')*M#(0%'*,(0%1"2%1,-%,9%1"2%1/#&%8,'/34 C4 ?)1%'%1/#&%8,'/3%'(3%#($1'**%)(32/%1"2%6#(3,6%821622(%1"2%BEc%$#32%1/#&4 ^4 =($1'**%$")112/$%6#1"%$+/26$%-/,G#3234 Nailing Flange 1x3 Trim Front Flange BE]%1/#&%#$%)$23%,(*.%,(%1"2 cCfEcCf%6#(3,64 Window...
  • Page 26 Step 30 Install Roofing — Not Supplied in Kit B4 =($1'**%&21'*%/,,9%D3/#-D%230#(0%'*,(0%1"2 Optional Roof Covering -2/#&212/%,9%1"2%/,,94 83*4 :,,9%<"#(0*2$ @4 =($1'**%$"#(0*2$%'++,/3#(0%1,%1"2%#($1/)+1#,($ ,(%1"2%6/'--2/4%=9%.,)%(223%&,/2%321'#*23 -+$4 :,,9%D3/#-D%a302\BAD #($1/)+1#,($%,(%#($1'**#(0%$"#(0*2$7%1"2/2%'/2 FAA $N4%914 T2*1%R'-2/ 0,,3%-)8*#+'1#,($%'(3%5\!)82%G#32,$ Packing Lists Qty. Material Shipped in Extension Kit Qty. Material Shipped by Local Supplier @EC%%E%FB\c_]f% !/)$$%!,-%?,/3 R/2\+)1%b'**%<1)3$ ] 2'4...
  • Page 27 Qty. Material Shipped on 'A' Pallet Qty. Material Shipped on 'B' Pallet R/2\8)#*1%U'8*2%T/'&2$ @B\c_]f E% !/)$$%\%!,-%?,/3 E FB\c_]f R/2\8)#*1%U'8*2%T/'&2$ BI\B_]f E U'8*2%ZG2/"'(0 E FB\c_]f R/2\8)#*1%@E]%S,,/%P2'32/ @E] c^\B_@f U'8*2%b'**%<1)3$ E C]\B_@f R/2\8)#*1%@E]%b34%P2'32/ U'8*2%!/#& !/)$$%\%Q20$ E ^B\c_Ff %%% ] U'8*2%!/#& E F@\B_]f !/)$$%R*'12$ QR%<#3#(0%R'(2*$ FA\B_@f %E%]F\c_]f...

This manual is also suitable for:

West virginia