Download Print this page

Moen RAIN FOREST Series Installation Instructions Manual page 4

Shower bar

Advertisement

3
安装淋浴杆:
1. 拿起组装好的杆式淋浴器,将墙座和切换阀对准、套上已装好
的固定座。
2. 用内六角扳手先拧紧墙座尾部的紧定螺钉,然后再拧紧切换阀
尾部的紧定螺钉,确认安装稳定。
Install the fixing ring:
1. Align the fixing bracket and diverter valve to fixing rings, put the
bar shower onto fixing rings.
2. At the end of fixing bracket and diverter valve, there is a fixing
screw , fix it with inner hexangular spanner.
4
接花洒软管
Connect
shower hose
此框配件供参考
须用户自备
Reference only
接金属软管
Connect flexible Hose
安装其它卫浴配件(虚线产品仅供参考):
1. 将两端放有垫片的金属软管分别与切换阀和龙头连接旋紧。
2. 安装后请检查各连接处是否连接紧密、管道是否有泄漏,整体安
装是否牢固。确定各部良好后,可放水试用,检查连接处是否漏水。
Install other bathroom accessories:
(Dashed area for reference only)
1. Connect the faucet and bar shower with hose.
2. Check up every step to ensure the stability and tightness to
avoid any leaking before testing the shower spray.
4
接头部花洒
Connect
shower head
放手持花洒
Lay hand shower
头部花洒
Shower head
手持花洒
Hand shower
花洒软管
Shower hose
此框配件供参考
须用户自备
Reference only

Advertisement

loading

This manual is also suitable for:

2255