Download Print this page

Moen RAIN FOREST Series Installation Instructions Manual page 4

Shower bar

Advertisement

3
安装淋浴杆:
1. 将管组件套入固定座。
2. 锁紧螺钉。
Install the fixing ring:
1. Put the bar shower onto the fixing rings.
2. Tighten up the screw.
4
先退螺钉
Screw
back first
此框配件供参考
须用户自备
Reference only
先退螺钉
Screw
back first
安装其它卫浴配件(虚线产品仅供参考):
1. 将两端放有垫片的金属软管分别与切换阀和龙头连接旋紧。
2. 安装后请检查各连接处是否连接紧密、管道是否有泄漏,整体安
装是否牢固。确定各部良好后,可放水试用,检查连接处是否漏水。
Install other bathroom accessories:
(Dashed area for reference only)
1. Connect the faucet and bar shower with hose.
2. Check up every step to ensure the stability and tightness to
avoid any leaking before testing the shower spray.
4
Lay hand shower
接花洒软管
Connect
shower hose
接金属软管
Connect flexible Hose
接头部花洒
Connect
shower head
放手持花洒
头部花洒
Shower head
手持花洒
Hand shower
花洒软管
Shower hose
此框配件供参考
须用户自备
Reference only

Advertisement

loading

This manual is also suitable for:

2232