TEST RUNNING
6.4 Test Running Record
Compile test running records according to Table 4. Utilize these records for periodic operation checks, as
well as for troubleshooting.
For models: RUA-NP4ATS through RUA-NP8ATS
Main Power Switch(*1)
Operation
Equipments
Room Thermostat(*1)
Indoor Fan Motor
Electric
Components
Outdoor Fan Motor
Compressor
Safety Devices
NOTES:
*1:Field supplied.
For models: RUA-NP9ATS through RUA-NP10ATS
Main Power Switch(*1)
Operation
Equipments
Room Thermostat(*1)
Indoor Fan Motor
Electric
Components
Outdoor Fan Motor
Normal Start
(*2)
Reverse Start
(*2)
Safety Devices
NOTES:
*1:Field supplied.
*2:Normal start and reverse start are triggered alternately by the actuation of the first stage switch
of room thermostat.
12
Operational Sequence Chart
FAN
COOL
TH
MIF
MOF
MC
Fig. 9-1. Standard Operation Sequence
Operational Sequence Chart
FAN
COOL
TH
MIF
MOF
Compressor 1 MC1
Compressor 2 MC2
Compressor 1 MC1
Compressor 2 MC2
Start Delay Time
Fig. 9-2. Standard Operation Sequence
OFF
AUTO
ON
OFF
─ ─ ─ ─
─ ─ ─ ─
─ ─ ─ ─
Close
Close
Close
OFF
AUTO
ON
OFF
(Stage)
1st ... ON
2nd ... ON
After 3 min.
After 3 min.
After 3 min.
After 3 min.
After 3.5
After
After
After
Close Close Close Close Close Close Close Close Open
: ON
ON
AUTO
ON
Close
Close
Close
After 3 min.
After 3 min.
After 3 min.
After 3 min.
: ON
ON
AUTO
ON
COOLING CALL
ON
ON
ON
OFF
ON
ON
OFF OFF
3.5
3.5 min.
3.5
min.
min.
min.
: OFF
Open
: OFF
ON
ON