Table of Contents A. Product Description B. General Information C. Transport and Installation D. Assembly Instructions E. De-installation F. Care and Maintenance G. Warnings H. Warranty Conditions I. Specifications J. Misc. / Contact K. Plans mo systeme GmbH & Co.KG...
Page 3
Usable interior space is c. 4m² plus another c. 5m² per platform unit with roof (exterior space). The modulbox can be installed in a range of different exhibition designs simply by choosing different coupling and opening combinations. mo systeme GmbH & Co.KG...
(depends on combination). of the contractual item. Upon request and payment of costs incurred, modulbox mo systeme can make available to the renter/purchaser the necessary According to §2 (5) BauOBln (Berlin Building Code) documents for obtaining such permits for the human occupancy spaces (Aufenthaltsräume) are...
2.46m x 2.46 x 2.85 be unloaded from the same side – see Figure. Weight: up to 2t gross weight If the forks are longer than 2.40m, the modulbox can be lifted from all four sides. mo systeme GmbH & Co.KG...
Page 10
Do not use a fork-lift with forks less than 1.80m to load the modulbox. Danger of tipping over! Set down carefully, the modulbox is sometimes fitted with castors (special fittings). Only set down on absolutely horizontal ground! And ensure it can’t roll away! mo systeme GmbH & Co.KG...
Page 12
LED on the affected device: cut-out through SYNC- port due to another device rapid alternate blinking of both LEDS: cut-out due to reaching end situation. mo systeme GmbH & Co.KG...
Page 13
...\mb_an_1_01_1_20_transport_anh. 27.07.2005 13:30:25 mo systeme GmbH & Co.KG...
Page 14
- hitch the trailer to the towing vehicle - fasten modulbox with securing straps. Protective cover (special fittings) During transport on an open vehicle the modulbox should always be covered with a transport cover, which we offer as part of our mo systeme GmbH & Co.KG...
Page 15
IMPORTNAT: tension belts need to be guided by canopy hinges zwischen den Klappdachkonsolen in order not to dürfen niemals Zurrgurte laufen! move inside! TRANSPORT modulbox Spanngurt VORNE OBEN mo systeme GmbH & Co.KG...
Page 16
The lifting system has a maximum lifting height of 700 mm. The engines need a capacity of 2.5 kW and additional switch-on current. The following points are of vital importance: - The power supply fuse must be switched on mo systeme GmbH & Co.KG...
Page 18
The switch-on time of the lifting system is 10%; this means that after a complete extension or retraction, the device must be switched off for mo systeme GmbH & Co.KG...
Page 19
-Cables should be stored in the floor box during transport -Fold in any elements sticking out from the trailer (lights) XB 3. slide rail -The trailer contains slide rails to facilitate sliding the trailer under the modulbox for loading mo systeme GmbH & Co.KG...
Page 20
Trailers used to transport the modulbox must - Remove power suppy for drives have a permissible maximum weight of at least 2.7 - Secure modulbox to the trailer’s securing device tons. The towing vehicle must have sufficient trailer mo systeme GmbH & Co.KG...
Page 21
The towing vehicle’s ABS does not affect the Driving behaviour trailer; in case of a full brake application, the trailer Journeys with a modulbox rig should be may block and possibly pull. This is especially undertaken with great care and concentration. mo systeme GmbH & Co.KG...
Use the four adjustable feet at the corners of the frame. The threads on these feet ensure that the feet cannot be screwed out of the frame. mo systeme GmbH & Co.KG...
Page 24
- Make sure that the load carried in the modulbox heavy tyre loads. is loaded evenly (in particular, distribute weight - Warning: When decoupling, make sure the evenly between left and right). trailer cannot “snap back”, which could lead to mo systeme GmbH & Co.KG...
Page 25
The bi-directional clamps have to be set properly at all times. They prevent a strong wind pulling up the door flap and ripping out the gas springs. They also prevent the door closing unintentionally, relieving pressure on the gas springs. mo systeme GmbH & Co.KG...
Page 27
Warning: Check that the securing rings on the will swing around fixing bolts of the gas springs are firmly attached. These prevent the gas springs slipping away from even in light winds. the bolts. Never unscrew the gas springs. mo systeme GmbH & Co.KG...
Page 29
- floor sockets From outside reach behind the frame to grasp the - connection for standard back-lit ceiling plug and pull it towards you. The plug is fitted with c. 0.5m cable (D7.1) Switch on the power. mo systeme GmbH & Co.KG...
Page 31
Back-lit ceiling active light The back-lit ceiling can be used with fluorescent lamps of various colours to create a colour mix and colour transition effects. This module comprises three fluorescent lamps each in the following mo systeme GmbH & Co.KG...
Page 33
The control unit is to be found behind the panel with the green dot. This element can be folded down and demounted by carefully pulling down the side marked by the dot. (D10.1-7) mo systeme GmbH & Co.KG...
Page 34
D9.1 D9.2 D9.3 order for demounting the ceiling panels mo systeme GmbH & Co.KG...
(E3.1) The platform parts remain upright when they are folded in. Later they will be held in place by the roof flaps. (E6.2) Note: The platforms need to be pushed upwards strongly! mo systeme GmbH & Co.KG...
Page 38
During the de-installation check that the rubber spacers are still present. These prevent movable components banging against each other and are located: 1. between the foldable roof and platform (E6.2) 2. between the platform and the door (E6.1) mo systeme GmbH & Co.KG...
As instructions as to the choice of cleaners from the far as is reasonably possible the renter is also manufacturers. responsible for ensuring that no damage occurs to the modulbox. mo systeme GmbH & Co.KG...
Page 41
In cases of vandalism the renter is obliged to report the incident to the police. mo systeme GmbH & Co.KG...
The operator has to be attached before entering the roof. Do not trip over anti fall protection system while working on the roof. mo systeme GmbH & Co.KG...
Page 45
1 door 2 door 3 door 4 foldable roof 1-4 platform 1-4 Bis 49 opened opened opened opened opened opened 50-75 opened closed closed closed opened opened 76-100 8-10 closed closed closed closed closed closed mo systeme GmbH & Co.KG...
Page 46
... to bend the gas cylinder or the piston rods or both..to bend or twist the piston rods against the cylinder..to heat the gas springs above 100°C or to burn them. mo systeme GmbH & Co.KG...
Page 47
• Store gas springs with the piston rod down. • Do not allow the piston rod to be damaged (e.g. by scratches or weld scatter) or to come into contact with paint, dirt, acids, glue or other damaging or corrosive materials. mo systeme GmbH & Co.KG...
The abovementioned liability limitations do not apply in the cases of damage to body, life or health. They do not affect the statutory liability under the Product Liability Act. mo systeme GmbH & Co.KG...
Alucore natural rubber, Kautschuk foldable roof aluminium, powder coated Airboard door steel, powder coated Plexiglas burns almost without smoke in line with DIN 4102 on request Makrolon mo systeme GmbH & Co.KG...
Page 51
(concept, assembley), fullsize (door/foldable roof) print, 4 elements connection element each with 2 wall frames, alucore floor subject to change without notice, patendend design status 07/2007 modulbox mo systeme GmbH & Co.KG Kastanienallee 29-30 10435 Berlin Germany mo systeme GmbH & Co.KG...
Page 52
(special fitting) mo systeme GmbH & Co.KG...
Page 53
(floor chamber) mo systeme GmbH & Co.KG...
Page 64
DACHAUFSTELLER 1- bis 4-seitig modulbox mo systeme GmbH & Co. KG Telefon: +49 (0)30 9210557 10 Neumagener Str. 42 Fax: +49 (0)30 9210557 90 Kurzanleitung 13088 Berlin info@mo-systeme.com Ergänzung zur modulbox Bedienungsanleitung mo systeme GmbH & Co.KG...
Page 65
DACHAUFSTELLER 1- bis 4-seitig modulbox mo systeme GmbH & Co. KG Telefon: +49 (0)30 9210557 10 Neumagener Str. 42 Fax: +49 (0)30 9210557 90 Kurzanleitung 13088 Berlin info@mo-systeme.com Ergänzung zur modulbox Bedienungsanleitung DACHAUFSTELLER: ANWENDUNG 4-SEITIG Rahmen Diagonalstrebe montieren Horizontalstrebe montieren...
Page 66
BELEUCHTUNGSAUSLEGER modulbox mo systeme GmbH & Co. KG Telefon: +49 (0)30 9210557 10 Neumagener Str. 42 Fax: +49 (0)30 9210557 90 Kurzanleitung 13088 Berlin info@mo-systeme.com Ergänzung zur modulbox Bedienungsanleitung mo systeme GmbH & Co.KG...
Page 67
BELEUCHTUNGSAUSLEGER modulbox mo systeme GmbH & Co. KG Telefon: +49 (0)30 9210557 10 Neumagener Str. 42 Fax: +49 (0)30 9210557 90 Kurzanleitung 13088 Berlin info@mo-systeme.com Ergänzung zur modulbox Bedienungsanleitung BELEUCHTUNGSAULEGER: AUFBAU & ABBAU Beleuchtungsausleger Arme des Beleuchtungsauslegers Beleuchtungsausleger an dem im zugeklappten Zustand.
Page 68
ECKÜBERDACHUNG modulbox mo systeme GmbH & Co. KG Telefon: +49 (0)30 9210557 10 Kurzanleitung Neumagener Str. 42 Fax: +49 (0)30 9210557 90 13088 Berlin info@mo-systeme.com Ergänzung zur modulbox Bedienungsanleitung mo systeme GmbH & Co.KG...
Page 69
ECKÜBERDACHUNG modulbox mo systeme GmbH & Co. KG Telefon: +49 (0)30 9210557 10 Kurzanleitung Neumagener Str. 42 Fax: +49 (0)30 9210557 90 13088 Berlin info@mo-systeme.com Ergänzung zur modulbox Bedienungsanleitung Aufbau Planenkeder im Profil Arretierung erstes Klappdach zweites Klappdach nach unten/oben an-/auf- knüpfen...
Page 70
1. Spanngurte lösen 3. zweiten Rahmen öffnen 1. unmount straps holding top frame 3. unfold 2nd frame Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system mo systeme GmbH & Co.KG...
Page 71
4. Querträger einhängen 6. Rahmen ankippen und aussteigen 4. mount cross beam 6. cant frame to exit Ergänzung - Bedienungsanleitung modulbox system Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system addition - manual modulbox system mo systeme GmbH & Co.KG...
Page 72
8. move frame until studs snap in Not snapped in yet ! Korrekt ! correct! Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system mo systeme GmbH & Co.KG...
Page 73
ALLE Bolzen vor Fahrt kontrollieren ob eingerastet ! control ALL studs if snapped in correctly before transport! Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system mo systeme GmbH & Co.KG...
Page 74
For transport strap down top frame ! with tension graphics Put your harness on first and connect to fall protection ! Ergänzung - Bedienungsanleitung modulbox system Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system addition - manual modulbox system mo systeme GmbH & Co.KG...
Page 75
DRUCKSTANGE FÜR REGENSCHUTZPLANE modulbox mo systeme GmbH & Co. KG Telefon: +49 (0)30 9210557 10 Kurzanleitung Neumagener Str. 42 Fax: +49 (0)30 9210557 90 13088 Berlin info@mo-systeme.com Ergänzung zur modulbox Bedienungsanleitung...
Page 76
DRUCKSTANGE FÜR REGENSCHUTZPLANE modulbox mo systeme GmbH & Co. KG Telefon: +49 (0)30 9210557 10 Kurzanleitung Neumagener Str. 42 Fax: +49 (0)30 9210557 90 13088 Berlin info@mo-systeme.com Ergänzung zur modulbox Bedienungsanleitung Aufbau Druckstange Kopf mit dem Druckstange Fuß Der Druckstange Fuß haftet am...
Page 77
/ ziehen Hineinschieben pull / push with 4 hands push carefully and slowly inside Ergänzung - Bedienungsanleitung modulbox system Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system addition - manual modulbox system mo systeme GmbH & Co.KG...
Page 78
Steckbolzen einführen fix position with studs Steckbolzen einführen fix position with studs Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system mo systeme GmbH & Co.KG...
Page 79
> nicht belasten , sofort schliessen ! if you can see those marks > close im- mediately! Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system mo systeme GmbH & Co.KG...
Page 80
In Behausung auch ohne Plane. If driven inside > no transport cover is okay ! Immer mit Transportplane fahren ! Drive with transport cover ONLY ! Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system mo systeme GmbH & Co.KG...
Page 82
GmbH & Co. KG Neumagener Str. 42 13088 Berlin t: +49 (0)30 9210557 10 f: +49 (0)30 9210557 90 info@mo-systeme.com www.mo-systeme.com Die modulbox ist patentrechtlich beim Deutschen Patent- und Mar- kenamt eingetragen. Änderungen vorbehalten. Alle Angaben freibleibend und unverbindlich.
Need help?
Do you have a question about the modulbox mb3 and is the answer not in the manual?
Questions and answers