Table of Contents A. Product Description B. General Information C. Transport and Installation D. Assembly Instructions E. De-installation F. Care and Maintenance G. Warnings H. Warranty Conditions I. Specifications J. Misc. / Contact K. Plans mo systeme GmbH & Co.KG...
Page 3
A. Description of the modulbox HC2 The modulbox is a modular mobile exhibition system with a steel frame construction. The side walls are each comprised of three folding elements: foldable roof, weight-bearing accessible platform and door flaps. The modulbox is rain-proof and was designed to be used both indoors and outdoors.
Page 5
The following illustration offers an overview of these combination possibilities. 2,55 2,55 2,55 2,55 2,55 2,55 2,55 2,55 2,55 2,55 2,55 2,55 mo systeme GmbH & Co.KG...
(depends on combination). of the contractual item. Upon request and payment of costs incurred, modulbox mo systeme can make available to the renter/purchaser the necessary According to §2 (5) BauOBln (Berlin Building Code) documents for obtaining such permits for the human occupancy spaces (Aufenthaltsräume) are...
Fork-lift trucks whose forks are a minimum of External measurements of the modulbox 1,80m long can lift the modulbox HC2 from all 4 sides (the two sides marked with the sticker). (C1.3). In this case it is important to place the...
Page 9
Do not use a fork-lift with forks less than 1.80m to load the modulbox. Danger of tipping over! Set down carefully, the modulbox is sometimes fitted with castors (special fittings). Only set down on absolutely horizontal ground! And ensure it can’t roll away! mo systeme GmbH & Co.KG...
Page 11
15 mins. Non-observation of this duty cycle means that a cut-out due to overheating will occur more quickly. mo systeme GmbH & Co.KG...
Page 12
...\mb_an_1_01_1_20_transport_anh. 27.07.2005 13:30:25 mo systeme GmbH & Co.KG...
Page 13
Open the protective cover on the roof of the modulbox so that the four side flaps hang down over the edges of the roof. Zip the side flaps together to connect them and then tighten them using the securing straps. mo systeme GmbH & Co.KG...
Page 14
IMPORTNAT: tension belts need to be guided by canopy hinges zwischen den Klappdachkonsolen in order not to dürfen niemals Zurrgurte laufen! move inside! TRANSPORT modulbox Spanngurt VORNE OBEN mo systeme GmbH & Co.KG...
Page 15
- The power supply fuse must be switched on - The length of the cable (cable diameter min 2,5mm²) leading up to the next mains fuse must not exceed 30 m - If using cable drums, the cable must be unwound completely mo systeme GmbH & Co.KG...
Page 17
15 minutes. If the switch-on time is -Cables should be stored in the floor box during exceeded, the thermal circuit breakers will react transport more quickly due to overheating. Once the operating temperature has lowered, the mo systeme GmbH & Co.KG...
Page 18
As cargo, the modulbox must be secured according to effective regulations. Cargo straps of at least 2500 daN must be used. Transport tarpaulin (optional equipment) For transport on an open vehicle, you should always use a transport tarpaulin, which we offer as mo systeme GmbH & Co.KG...
Page 19
This is − necessary (with the exception of German “Klasse especially important when crossing bridges and in 3”) strong winds. The maximum speed of 80 kph must not be − mo systeme GmbH & Co.KG...
Page 20
Edges like curbs should not be crossed in reverse. Generators The lifting devices need a `clean` signal which is generated by new and well maintained devices. We recommend to use 2x Honda 2.0 EUi mo systeme GmbH & Co.KG...
Use the four adjustable feet at the corners of the frame. The threads on these feet ensure that the feet cannot be screwed out of the frame. mo systeme GmbH & Co.KG...
Page 23
- Make sure that the load carried in the modulbox heavy tyre loads. is loaded evenly (in particular, distribute weight - Warning: When decoupling, make sure the evenly between left and right). trailer cannot “snap back”, which could lead to mo systeme GmbH & Co.KG...
Page 24
The bi-directional clamps have to be set properly at all times. They prevent a strong wind pulling up the door flap and ripping out the gas springs. They also prevent the door closing unintentionally, relieving pressure on the gas springs. mo systeme GmbH & Co.KG...
Page 26
Warning: Check that the securing rings on the will swing around fixing bolts of the gas springs are firmly attached. These prevent the gas springs slipping away from even in light winds. the bolts. Never unscrew the gas springs. mo systeme GmbH & Co.KG...
Page 28
The plug is fitted with We will also provide a gas driven generator c. 0.5m cable (D7.1) supplying 230V and 3000Watts to be Switch on the power. operational in any case. mo systeme GmbH & Co.KG...
Page 30
-wear clean gloves in order to avoid leaving handprints on the white outer skin Electro module basic - junction box with RCD - floor sockets - connection for standard back-lit ceiling mo systeme GmbH & Co.KG...
Page 32
The control unit is to be found behind the panel with the green dot. This element can be folded down and demounted by carefully pulling down the side marked by the dot. (D10.1-7) mo systeme GmbH & Co.KG...
Page 33
D9.1 D9.2 D9.3 order for demounting the ceiling panels mo systeme GmbH & Co.KG...
(E3.1) The platform parts remain upright when they are folded in. Later they will be held in place by the roof flaps. (E6.2) Note: The platforms need to be pushed upwards strongly! mo systeme GmbH & Co.KG...
Page 37
During the de-installation check that the rubber spacers are still present. These prevent movable components banging against each other and are located: 1. between the foldable roof and platform (E6.2) 2. between the platform and the door (E6.1) mo systeme GmbH & Co.KG...
As instructions as to the choice of cleaners from the far as is reasonably possible the renter is also manufacturers. responsible for ensuring that no damage occurs to the modulbox. mo systeme GmbH & Co.KG...
Page 40
In cases of vandalism the renter is obliged to report the incident to the police. mo systeme GmbH & Co.KG...
The operator has to be attached before entering the roof. Do not trip over anti fall protection system while working on the roof. mo systeme GmbH & Co.KG...
Page 44
1 door 2 door 3 door 4 foldable roof 1-4 platform 1-4 Bis 49 opened opened opened opened opened opened 50-75 opened closed closed closed opened opened 76-100 8-10 closed closed closed closed closed closed mo systeme GmbH & Co.KG...
Page 45
... to bend the gas cylinder or the piston rods or both..to bend or twist the piston rods against the cylinder..to heat the gas springs above 100°C or to burn them. mo systeme GmbH & Co.KG...
Page 46
• Store gas springs with the piston rod down. • Do not allow the piston rod to be damaged (e.g. by scratches or weld scatter) or to come into contact with paint, dirt, acids, glue or other damaging or corrosive materials. mo systeme GmbH & Co.KG...
The abovementioned liability limitations do not apply in the cases of damage to body, life or health. They do not affect the statutory liability under the Product Liability Act. mo systeme GmbH & Co.KG...
Alucore natural rubber, Kautschuk foldable roof aluminium, powder coated Airboard door steel, powder coated Plexiglas burns almost without smoke in line with DIN 4102 on request Makrolon mo systeme GmbH & Co.KG...
Page 50
(concept, assembley), fullsize (door/foldable roof) print, 4 elements connection element each with 2 wall frames, alucore floor subject to change without notice, patendend design status 07/2007 modulbox mo systeme GmbH & Co.KG Kastanienallee 29-30 10435 Berlin Germany mo systeme GmbH & Co.KG...
Page 58
DACHAUFSTELLER 1- bis 4-seitig modulbox mo systeme GmbH & Co. KG Telefon: 030-41714771 Kastanienallee 29-30 Fax: 030-4171-4909 Kurzanleitung 10435 Berlin info@mo-systeme.com Ergänzung zur modulbox Bedienungsanleitung mo systeme GmbH & Co.KG...
Page 59
DACHAUFSTELLER 1- bis 4-seitig modulbox mo systeme GmbH & Co. KG Telefon: 030-41714771 Kastanienallee 29-30 Fax: 030-4171-4909 Kurzanleitung 10435 Berlin info@mo-systeme.com Ergänzung zur modulbox Bedienungsanleitung DACHAUFSTELLER: ANWENDUNG 4-SEITIG Rahmen Diagonalstrebe montieren Horizontalstrebe montieren Planen und Gummis auf-/zu- klappen. und Arretierungspin...
Page 60
BELEUCHTUNGSAUSLEGER modulbox mo systeme GmbH & Co. KG Telefon: 030-41714771 Kastanienallee 29-30 Fax: 030-4171-4909 Kurzanleitung 10435 Berlin info@mo-systeme.com Ergänzung zur modulbox Bedienungsanleitung mo systeme GmbH & Co.KG...
Page 61
BELEUCHTUNGSAUSLEGER modulbox mo systeme GmbH & Co. KG Telefon: 030-41714771 Kastanienallee 29-30 Fax: 030-4171-4909 Kurzanleitung 10435 Berlin info@mo-systeme.com Ergänzung zur modulbox Bedienungsanleitung BELEUCHTUNGSAULEGER: AUFBAU & ABBAU Beleuchtungsausleger Arme des Beleuchtungsauslegers Beleuchtungsausleger an dem im zugeklappten Zustand. aus-/ klappen. Dachkubusrahmen an-/ab- hägen.
Page 62
ECKÜBERDACHUNG modulbox mo systeme GmbH & Co. KG Telefon: 030-41714771 Kastanienallee 29-30 Fax: 030-4171-4909 Kurzanleitung 10435 Berlin info@mo-systeme.com Ergänzung zur modulbox Bedienungsanleitung mo systeme GmbH & Co.KG...
Page 63
ECKÜBERDACHUNG modulbox mo systeme GmbH & Co. KG Telefon: 030-41714771 Kastanienallee 29-30 Fax: 030-4171-4909 Kurzanleitung 10435 Berlin info@mo-systeme.com Ergänzung zur modulbox Bedienungsanleitung Aufbau Planenkeder im Profil Arretierung erstes Klappdach zweites Klappdach nach unten/oben an-/auf- knüpfen auf- /zu- klappen auf- /zu-...
Page 64
DRUCKSTANGE FÜR REGENSCHUTZPLANE modulbox mo systeme GmbH & Co. KG Telefon: +49 (0)30 9210557 10 Kurzanleitung Neumagener Str. 42 Fax: +49 (0)30 9210557 90 13088 Berlin info@mo-systeme.com Ergänzung zur modulbox Bedienungsanleitung...
Page 65
DRUCKSTANGE FÜR REGENSCHUTZPLANE modulbox mo systeme GmbH & Co. KG Telefon: +49 (0)30 9210557 10 Kurzanleitung Neumagener Str. 42 Fax: +49 (0)30 9210557 90 13088 Berlin info@mo-systeme.com Ergänzung zur modulbox Bedienungsanleitung Aufbau Druckstange Kopf mit dem Druckstange Fuß Der Druckstange Fuß haftet am...
Page 66
/ ziehen Hineinschieben pull / push with 4 hands push carefully and slowly inside Ergänzung - Bedienungsanleitung modulbox system Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system addition - manual modulbox system mo systeme GmbH & Co.KG...
Page 67
Steckbolzen einführen fix position with studs Steckbolzen einführen fix position with studs Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system mo systeme GmbH & Co.KG...
Page 68
> nicht belasten , sofort schliessen ! if you can see those marks > close im- mediately! Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system mo systeme GmbH & Co.KG...
Page 69
In Behausung auch ohne Plane. If driven inside > no transport cover is okay ! Immer mit Transportplane fahren ! Drive with transport cover ONLY ! Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system mo systeme GmbH & Co.KG...
Page 70
1. Spanngurte lösen 3. zweiten Rahmen öffnen 1. unmount straps holding top frame 3. unfold 2nd frame Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system mo systeme GmbH & Co.KG...
Page 71
4. Querträger einhängen 6. Rahmen ankippen und aussteigen 4. mount cross beam 6. cant frame to exit Ergänzung - Bedienungsanleitung modulbox system Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system addition - manual modulbox system mo systeme GmbH & Co.KG...
Page 72
8. move frame until studs snap in Not snapped in yet ! Korrekt ! correct! Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system mo systeme GmbH & Co.KG...
Page 73
ALLE Bolzen vor Fahrt kontrollieren ob eingerastet ! control ALL studs if snapped in correctly before transport! Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system mo systeme GmbH & Co.KG...
Page 74
For transport strap down top frame ! with tension graphics Put your harness on first and connect to fall protection ! Ergänzung - Bedienungsanleitung modulbox system Ergänzung - Bedienungsanleitung modulbox system addition - manual modulbox system addition - manual modulbox system mo systeme GmbH & Co.KG...
Page 81
GmbH & Co. KG Neumagener Str. 42 13088 Berlin t: +49 (0)30 9210557 10 f: +49 (0)30 9210557 90 info@mo-systeme.com www.mo-systeme.com Die modulbox ist patentrechtlich beim Deutschen Patent- und Mar- kenamt eingetragen. Änderungen vorbehalten. Alle Angaben freibleibend und unverbindlich.
Need help?
Do you have a question about the modulbox HC2 and is the answer not in the manual?
Questions and answers