ddtop UQK-100 Operation Manual

ddtop UQK-100 Operation Manual

Float level switch

Advertisement

Quick Links

UQK(S)-100
FLOAT LEVEL SWITCH
Operation Manual
WWW.DDTOP.COM
1 / 14

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UQK-100 and is the answer not in the manual?

Questions and answers

Summary of Contents for ddtop UQK-100

  • Page 1 UQK(S)-100 FLOAT LEVEL SWITCH Operation Manual WWW.DDTOP.COM 1 / 14...
  • Page 2 If the instructions are not followed, the protection provided by the meter may be destroyed. Trademark, Copyright and Restriction Instructions Dandong Top Electronics Instrument (Group) Co.,Ltd.®, Dandong Top Pump Co., Ltd.®, DDTOP® are registered trademarks of the company. The performance specifications of the meter are effective as of the date of publication and are subject to change without notice.
  • Page 3: Table Of Contents

    7.2 Electrical Wiring ..................................11 7.3 Debugging Process ................................12 8. Precautions..................................13 9. Fault Analysis and Elimination ............................13 10. Disassembly ................................. 14 10.1 Warning ....................................14 10.2 Waste Removal .................................. 14 11 Product certifications ..............................14 WWW.DDTOP.COM 3 / 14...
  • Page 4: Safety Tips

    2. Product Manual 2.1 Main Structure of Product-Figure 1 Figure 1 1. Float, level detecting element. 2. Float connecting rod with magnetic steel. 3. Flanges and flanges, flanges can be rotated 360°. WWW.DDTOP.COM 4 / 14...
  • Page 5: Operating Principle-Figure 2

    Check if the controller and system are normal. Figure 2 2.3 Packing Please send the packaging waste to a special recycling agency. WWW.DDTOP.COM 5 / 14...
  • Page 6: Transporting

    Figure 3-4 General type -UQK-104 Figure 3-11Self-checking type -UQKS-104 Figure 3-5 General type -UQK-105 Figure 3-12Self-checking type -UQKS-105 Figure 3-6 General type -UQK-1011 Figure 3-13Self-checking type -UQKS-1011 Figure 3-7 General type -UQK-1012 Figure 3-14Self-checking type -UQKS-1012 WWW.DDTOP.COM 6 / 14...
  • Page 7 WWW.DDTOP.COM 7 / 14...
  • Page 8: Unpacking And Inspection

    5. Unpacking and Inspection 5.1 Unpacking Inspection Notice 5.1.1 Check whether the product nameplate (Figure 4) is consistent with the supply list information. WWW.DDTOP.COM 8 / 14...
  • Page 9: Check Content

    6.2.2 Pay attention to the distance between the tank flange and the inner wall of the tank and the diameter of the tank when installing, to ensure that the limit bracket is flexible in the tank. 6.2.3 Ensure that the horizontal level of the equipment is within 3 °. WWW.DDTOP.COM 9 / 14...
  • Page 10: Installation Process

    550mm. If there is no special requirement, the factory setting limit pin position is shown in Figure 6, the action limit is 45mm. Figure 6 Step Adjustable WWW.DDTOP.COM 10 / 14...
  • Page 11: Debugging

    1. Remove the cover. 2.According to the wiring diagram wiring, please note that the over-reporting and under-reporting switches are opposite. Be sure to connect to the correct terminal according to the wiring diagram (see Figure 8). For the SPDT WWW.DDTOP.COM 11 / 14...
  • Page 12: Debugging Process

    Dynamically simulate a low level and use a multimeter to check if the output is correct. Note that the position of the handle must be placed at the working position after commissioning (see Figure 9) Figure 9 Commissioning operations WWW.DDTOP.COM 12 / 14...
  • Page 13: Precautions

    4. Remove the instrument to clean the float switch does not work. 6. Self-checking level controller handle and connecting rod. position is wrong. 5. Replace the transmitter. 6. The handle position is moved to the working position. WWW.DDTOP.COM 13 / 14...
  • Page 14: Disassembly

    Refer to the instructions in section 6.3 Installation Operation and Section 7.2 Electrical Wiring to remove the parts in the reverse order of operation. 10.2 Waste Removal Waste disposal should be carried out in accordance with the current guidelines in each region. 11 Product certifications WWW.DDTOP.COM 14 / 14...

Table of Contents