ddtop UQK-400 Operation Manual

ddtop UQK-400 Operation Manual

Float level switch

Advertisement

Quick Links

UQK-400
FLOAT LEVEL SWITCH
Operation Manual
WWW.DDTOP.COM
1 / 10

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UQK-400 and is the answer not in the manual?

Questions and answers

Summary of Contents for ddtop UQK-400

  • Page 1 UQK-400 FLOAT LEVEL SWITCH Operation Manual WWW.DDTOP.COM 1 / 10...
  • Page 2 If the instructions are not followed, the protection provided by the meter may be destroyed. Trademark, Copyright and Restriction Instructions Dandong Top Electronics Instrument (Group) Co.,Ltd.®, Dandong Top Pump Co., Ltd.®, DDTOP® are registered trademarks of the company. he performance specifications of the meter are effective as of the date of publication and are subject to change without notice.
  • Page 3: Table Of Contents

    7.2 Electrical Wiring ..............................7 7.3 Debugging Operation Process......................... 8 8 Precautions ..................................8 9 Fault Analysis and Elimination ..........................9 10.Disassembly .................................. 9 10.1 Warning ................................. 9 10.2 Waste Removal ..............................9 11 Product Certification ..............................9 WWW.DDTOP.COM 3 / 10...
  • Page 4: Safety Tips

    The operations described in this manual are performed by professionally trained and qualified professionals or end-user specialized professionals to complete. 2. Product Manual 2.1 Main Structure of Product -Figure 1 Figure1 1. Float, buoyancy measuring element 2. Connecting rod, swinging with the float 3. Flange WWW.DDTOP.COM 4 / 10...
  • Page 5: Operating Principle -Figure2

    3.1.1 Has Passed the National Explosion-Proof Certification, Certification Mark: Intrinsically safe type Ex iaⅡCT5/T6 Ga Explosion isolation type Ex dⅡCT1~T5/T6 Gb 3.1.2 Product Performance Standards: Q/AMM003 Float Level Switch 3.2 Main Parameters 3.2.1 Power Supply Voltage:AC220V DC24V WWW.DDTOP.COM 5 / 10...
  • Page 6: Dimensional Schematic -Figure 2

    5.1.1 Check whether the product nameplate (Figure 4) is consistent with the supply list information. Figure4 Sample Nameplate 5.1.2 对照装箱清单,检查各零件数量,材质是否正确。 5.1.2 Check the quantity of each part against the packing list and the material is correct. 5.2 Check Content WWW.DDTOP.COM 6 / 10...
  • Page 7: Installation

    6.3.4 Install flange bolts and nuts. Tighten the flange bolts alternately to ensure that the flange gaskets are installed correctly. 7. Debugging 7.1 Preparation for Commissioning 7.1.1 Debugging Tools: Multimeter 7.2 Electrical Wiring 7.2.1 Cable preparation: Wiring should be OD10mm five-core rubber sleeve flexible cable or rubber WWW.DDTOP.COM 7 / 10...
  • Page 8: Debugging Operation Process

    7.3.2 After installation, connect the multimeter to the terminal that needs wiring. When the level reaches the alarm position, check whether the level output is correct. 8 Precautions 8.1 The density of use should be the same as the design density. If the density changes, please inform the factory; WWW.DDTOP.COM 8 / 10...
  • Page 9: Fault Analysis And Elimination

    Refer to the instructions in section 6.3 Installation Operation and Section 7.2 Electrical Wiring to remove the parts in the reverse order of operation. 10.2 Waste Removal Waste disposal should be carried out in accordance with the current guidelines in each region. 11 Product Certification WWW.DDTOP.COM 9 / 10...
  • Page 10 WWW.DDTOP.COM 10 / 10...