Page 1
Design by doshi levien Assembly Instructions Schiavello Group Pty Ltd reserves the right to change any or all details without prior notice. All dimensions stated within this document are nominal and/or approximate only and subject to variation.
Page 2
Assembly Instructions Tools Required: 1 x socket spanner Number of pieces included 1. Top 2. Grip 3. Stem 4. Base 5. Washer 6. Nylock nut Assembly _ Insert stem (3) with stud into the hole of the base (4). Care Instructions Place washer (5) over the stud and screw on nylock nut (6).
Need help?
Do you have a question about the OTM Table and is the answer not in the manual?
Questions and answers