Download Print this page

Waltons 01OVLPA1006DDFW-V1 General Instructions Manual

Advertisement

Quick Links

General Instructions
Overlap
Shiplap
Cladding
Cladding
01OVLPA1006DDFW-V1
10x6 Overlap apex shed with double doors, fixed windows, solid sheet floor and roof.
01OVLPA1006DDFW-V1-NW
10x6 Overlap apex shed with double doors, no windows, solid sheet floor and roof.
01OSBA1006DDFW-V1
10x6 Shiplap apex shed with double doors, fixed windows, solid sheet floor and roof.
01OSBA1006DDFW-V1-NW
10x6 Shiplap apex shed with double doors, no windows, solid sheet floor and roof.
01SHPA1006DDOW-V1
10x6 Shiplap apex shed with double doors, opening windows, T&G floor and roof.
01SHPA1006DDOW-V1-NW
10x6 Shiplap apex shed with double doors, no windows, T&G floor and roof.
Refer to the instructions pages for you speci c product code
14/01/2014
Fixed
Opening
Windows
Windows
Please retain product label and instructions for future reference
N/A
No
Solid Sheet
Floor
Windows
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand
(not supplied) including a Phillips screwdriver, Stanley knife, wood saw,
step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather
conditions. For the duration of heavy or extended periods of rain, swelling of the
wood panels may occur. Warping of the wood may also occur during excessive
dry spells due to an interior moisture loss. Unfortunately, these processes cannot
be avoided but can be helped. It is suggested that the outdoor building is
sprayed with water during extended periods of warm sunshine and sheltered as
much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to
protect the product during transit and for upto 3 months against mould. To
validate your guarantee and ensure longevity of the product, it is ESSENTIAL the
building is treated with a wood preserver within the rst three months of
assembly and thereafter in accordance with the manufactures recommenda-
tions. Care must be taken to ensure the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer
to diagrams for the base dimensions, The base should be slightly smaller than
the external measurement of the building, i.e. The cladding should overlap the
base, creating a run o for water. It is also recommended that the oor be at
least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the
highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot
accept responsibility for your safety whilst erecting or
using this product.
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
T&G Floor
Solid Sheet
Roof
x2
All building's should be erected by two
adults
For ease of assembly, you must pilot
drill all screw holes and ensure all
screw heads are countersunk.
2mm Drill bit
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces
of the timber. You are strongly advised
to wear gloves when working with or
handling rough sawn timer.
For Assistance Please
Contact Customer Care on
01636 880514
**Protim Fentex E5**
Biocidal Product Regulation (EU 528/2012) Article 58 Information
Protim Fentex E2 preserved wood is a "treated article" which incorporates biocidal products.
Wood correctly preserved with Protim Fentex E2 is protected against mould in storage.
Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.
Wear gloves when handling freshly treated wood.
Avoid breathing dust when cutting treated or untreated wood.
Dispose of o -cuts responsibly – do not burn.
www.merciagardenproducts.co.uk
T&G Roof
P 1

Advertisement

loading

Summary of Contents for Waltons 01OVLPA1006DDFW-V1

  • Page 1 Roof Windows BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 01OVLPA1006DDFW-V1 All building’s should be erected by two - Check the pack and make sure you have all the parts listed. 10x6 Overlap apex shed with double doors, fixed windows, solid sheet floor and roof.
  • Page 2: Pre-Assembly

    01OSBA1006DDFW-V1 & 01OSBA1006DDFW-V1-NW Please retain product label and instructions for future reference Overall Dimensions: Length = 3028mm Nail Bag Width = 2484mm 40mm Screw x 116 Felt Tacks x 120 Height = 2121mm 01OSBA1006DDFW-V1 30mm Screw x 76 50mm Screw x 28 Base Dimensions: Length = 3016mm 30mm Black Screw x 3...
  • Page 3 Step 1 Step 3 Fix the corners with 50mm Place floor on firm and level base, ensure screws as shown in diagram. base has suitable drainage free from areas where water can collect. (See front page on 12x50mm Screws base requirements). 50mm Attach the floors using 12 x 40mm screws screw...
  • Page 4 Step 7 Step 5 ENSURE SUPPORT BARS ARE MANUALLY SUP- Fix a Truss support i)Position a truss frame to the PORTED UNTIL FIXED AT between the two truss ridge bar sloping down towards BOTH ENDS frames and x in place the building side, ensure it is using 40mm screws, central to the middle upright of...
  • Page 5 Step 9 Step 11 Fix the eaves frame to Cut out three strips of the roof sheet using 3104mm felt and place 3x30mm screws for each sheet. onto the roof. 8x30mm Screws Place the felt flat onto the Place two roof sheets roof in the order that is ontop of the plain gable stated on the diagram...
  • Page 6 Step 13 Step 12 Fit the cover trims to the building and secure in place with 40mm screws as shown. Pre drill to avoid splitting. 18x40mm Screws 40mm Pre drill screw hole Step 14 Attatch faisca’s to the roof leaving a slight overhang at the top.
  • Page 7 Step 16 Step 15 For the no window version go to step 11 Fix the door strips to the master door using 5x30mm 30mm screws. Fix the window strips to the two screw Pre drill 30mm If the strips are attatched to hole screw pieces of framing that sit...
  • Page 8: After Treatment

    It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back P 15...

This manual is also suitable for:

01ovlpa1006ddfw-v1-nw01osba1006ddfw-v101osba1006ddfw-v1-nw01shpa1006ddow-v101shpa1006ddow-v1-nw