Download Print this page

Waltons 01GRO1208DD-V1 Manual

Advertisement

Quick Links

01GRO1208DD-V1
Please retain product label (Attached to your building) for reference with all future contact
Retain Instructions for future reference
Before
commencing assembly
make sure you have a
suitable base ready to
erect your building
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand
(not supplied) including a Phillips screwdriver, Stanley knife, wood saw,
step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather
conditions. For the duration of heavy or extended periods of rain, swelling of the
wood panels may occur. Warping of the wood may also occur during excessive
dry spells due to an interior moisture loss. Unfortunately, these processes cannot
be avoided but can be helped. It is suggested that the outdoor building is
sprayed with water during extended periods of warm sunshine and sheltered as
much as possible during rain or snow.
Our buildings are delivered pre-treated with a water based timber treatment
however this only helps to protect during transit of your garden item. To
validate your guarantee and for better protection against weathering it is
highly recommended that you treat the garden building with a wood preserver
within 3 months of assembly. This will need to be re-applied annually to ensure
longevity of your building. Care must be taken when constructing the garden
building that it is not touching the ground and is on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and
annual treatment.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly
smaller than the external measurement of the building, i.e. the cladding should overlap the base, creating a run o for water. It is also recommended
that the oor be at least 25mm above the surrounding ground level to avoid ooding.
Whilst all products manufactured at Walton Garden Buildings Limited are made to the highest standards of Safety and in the case of childrens products
independently tested to EN71 level, Walton Garden Buildings Limited cannot accept responsibility for your safety whilst erecting or using this product.
Length - 3638mm
Width - 2430mm
Height - 2282mm
x2
This building should be erected by
two people.
For ease of assembly,you must pilot
drill all screw holes and ensure all
screw heads are countersunk.
2mm Drill bit
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
For Assistance Please
Contact Customer Care on
01636 880514
Contents
1
Plain Gable
Door Gable
6
5
Plain Panel x2
Floor x2
Fixing Kit
12
1480-95mm
11
(Facias)
x4
17
18
120-27-45mm
16
120-12-45mm
(Facia Blocks)
(Tower Bolt Blocks)
19
x4
x1
20
Nail Bag & Ironmongery Contents
23
21
T-Hinge
Tower Bolt
Rim Lock
24
& Handle
22
7
Casement Stay
x2
2
3
Window Panel x2
7
Roof Truss
8
9
14
100-45mm
1652-55mm
(Corner/side Trims)
(Truss Support)
x6
x2
13
1245-1449mm Horizontal Door Strip
1245-1732mm Vertical Door Strip x2
Window Strip 1055mm x2
Butt Hinge
25
x4
4
Roof Panel
x4
10
Master
Door
Slave
Window x2
Door
15
Shed Diamond
Finial x2
Felt
Felt Tacks x180
12x16mm Screw
15x20mm Screw
132x30mm Screw
8x30mm Black Screw
20x40mm Screw
50x50mm Screw
5x60mm Screw
10
3x70mm Screw

Advertisement

loading

Summary of Contents for Waltons 01GRO1208DD-V1

  • Page 1 01GRO1208DD-V1 Please retain product label (Attached to your building) for reference with all future contact Contents Retain Instructions for future reference Before commencing assembly make sure you have a suitable base ready to erect your building Window Panel x2 Plain Gable...
  • Page 2: Pre-Assembly

    Assembly Assembly *SCREW COUNT PER WINDOW 30mm screw Place the opening window strip 11mm above the window gap in the window panel and fix with 3x30mm screws. 3x30mm Screws Pre Assembly 30mm Fix the door strips onto the front gable using 4x30mm screws for each strip 12X30mm screws Opening Window...
  • Page 3 Step 1 Step 3 Window panel can be fitted Remove transportation blocks on either left or right side Fix the corners with 50mm from the bottom of each panel screws as shown in diagram. before beginning assembly. Each Panel should have two blocks. Do not secure the building to the floor until the roof is fitted.
  • Page 4 Step 5 Step 7 Cut felt into 4 sheets and lay onto roof as shown in diagram ensuring there is a 100mm 50mm 50mm overhang around the Put both Roofs on the top of the building intervals Overhang and place the roof truss up against the roof sides.
  • Page 5 Step 9 Step 11 Use 40mm screws to fix Attach the mounting block to each fascia block, fascia top of the slave door with 2x30 and Shed Diamond. screws. Align tower bolts onto blocks and fix with 6x30mm black screws . 18x 40mm Screws 6x 30mm Black Screws 2x 40mm Screws...