Cisco ME 3400E Hardware Installation Manual page 60

Cisco systems ethernet access switch installation guide
Hide thumbs Also See for Cisco ME 3400E:
Table of Contents

Advertisement

Power-Supply Module Installation
To make sure that the equipment is reliably connected to earth ground, follow the grounding
Caution
procedure instructions, and use a UL-listed lug suitable for number-6 AWG wire and two number-10-32
ground-lug screws.
Follow these steps to install either a single-ground lug or a dual-ground lug on the switch. Make sure to
follow any grounding requirements at your site.
Locate the ground adaptor and the dual-hole lug that ships with the switch.
Step 1
Step 2
If your ground wire is insulated, use a wire stripping tool to strip the 12-gauge or 6-gauge ground wire
to 0.5 inch (12.7 mm) ± 0.02 inch (0.5 mm)
single-ground connection. Use 6-gauge copper ground wire for the ground connection.
Figure 3-10
Slide the open end of the ground lug over the exposed area of the wire.
Step 3
Use a Panduit crimping tool to crimp the ground lug to the wire (see
Step 4
Figure 3-11
Remove the ground screw from the switch rear panel.
Step 5
Attach the dual-hole lug and the wire assembly to the adaptor with the supplied nuts
Step 6
Use a ratcheting torque screwdriver to torque the ground-lug screws to 60 in-lb.
Step 7
Connect the other end of the grounding wire to an appropriate grounding point at your site or to the rack.
Step 8
Cisco ME 3400E Ethernet Access Switch Hardware Installation Guide
3-10
Stripping the Ground Wire
0.5 in. (12.7 mm) ± 0.02 in. (0.5 mm)
Insulation
Crimping the Ground Lug
Chapter 3
Installing and Removing AC- and DC-Power-Supply Modules
(Figure
3-10). Use 12-gauge copper ground wire for the
Wire lead
Figure
3-11).
(Figure
3-12).
OL-16447-01

Advertisement

Table of Contents
loading

Table of Contents