Step 4 Insert the new monitoring module into the corresponding slot and push it into the
slot along the guide rails.
Step 5 Push the handle of the monitoring module upwards until it is in place.
Figure 6-2 Installing a new monitoring module
Step 6 Connect the signal cable terminals and COM communications cables to the panel
of the new monitoring module based on the recorded information.
Step 7 Disconnect the ground cable of the ESD wrist strap, and remove the ESD wrist
strap and ESD gloves.
Step 8 Set the IP address of the new monitoring module to the IP address of the old one.
Log in to the WebUI, import the individual file, and set parameters as required.
----End