Technical Service Bulletin:
Evaporator Coil Replacement
Models: IDP (5 Ton) Heat Pump Units
Please read this entire document prior to proceeding with any work.
WARNING:
 This bulletin is intended to provide technical guidance to a
professional who is qualifi ed to work on heat pump products,
components, and refrigerant. If you are not qualifi ed to work
on such equipment, please obtain the services of qualifi ed
HVAC professionals.
WARNING: PERSONAL INJURY
 The coil replacement procedure must not be undertaken
without fi rst removing all existing refrigerant from the
product.
If you have any questions regarding the information provided in this document,
please contact our Heat Pump Technical Support Team by phone at 1-800-283-
3787, or via email at
ac.techsupport@us.bosch.com
CAUTION: PERSONAL INJURY, PRODUCT DAMAGE
 This procedure requires two people and the use of a Coil
Replacement Support Bar (part# 8733957022, available
from Bosch at no charge) in order to be carried out safely.
 Please do NOT attempt this procedure alone or without
obtaining the support bar and having it ready to use.
Data subject to change without notice | BTC 761702118 A | 06.2022
Evaporator Coil Replacement Procedure
1.
Ensure that the unit is powered off and isolated from the electrical supply.
2.
Reclaim all refrigerant (refer to installation manual for correct procedure).
Remove the 24 screws than run around the middle of all four sides of the
3.
unit (Fig.1).
Figure 1
4.
Remove the side panels (Fig.2).
Figure 2
Bosch Thermotechnology Corp.
www.bosch-thermotechnology.us
65 Grove Street Watertown, MA 02472 | Tel: 1-866-642-3198

Advertisement

loading

Summary of Contents for Bosch IDP

  • Page 1  This procedure requires two people and the use of a Coil Replacement Support Bar (part# 8733957022, available from Bosch at no charge) in order to be carried out safely.  Please do NOT attempt this procedure alone or without obtaining the support bar and having it ready to use.
  • Page 2 2 | IDP (5 ton) Heat Pump Units– Evaporator Coil Replacement Technical Service Bulletin Heat and separate the brazed joints of the coil’s inlet and outlet connections (Fig.3). The following step REQUIRES two people in order to be carried out safely, and will provide the clearance needed to physically remove the existing coil.
  • Page 3 IDP (5 ton) Heat Pump Units– Evaporator Coil Replacement Technical Service Bulletin Figure 10 13. Using the correct procedure with nitrogen, braze the coil’s inlet and outlet connections (Fig.11). Figure 8 11. Pass a cable tie through the copper U-ends as close to the metal bracket...