Monitor Installation; Items Shipped - Qualitrol DGALT1-11120 Installation & User Manual

Qualconnex on-line transformer monitor
Table of Contents

Advertisement

Installation & User Guide

Monitor Installation

Note: Do not attempt to install your DGA-LT1 On-Line Transformer Monitor until you have read and fully
understand the procedures outlined in this document.
Installation of the QualConnex system consists of the following:
Site Preparation
All shipped items have been located
Configuration of website
Required tools for assembly
Assembly and mounting the QGateway with mount
QGateway field installation
Installing the DGA-LT1
Bleeding the DGA-LT1 monitor
Commissioning

Items Shipped

Upon receipt of your transformer monitor, it is important to verify the contents of the shipping carton
with the packing list. After inspection of the contents, please notify Qualitrol via our "contact us" page
at
www.qualitrolcorp.com/contact-us/
have occurred in transit. If possible, please retain the original shipping container and packing
materials if it becomes necessary to return the monitor.
if there are any missing parts or any signs of damage that may

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dga-lt1Gtw-rf-3311Gtw-rf-3311-ca

Table of Contents