Download Print this page

3onedata 1100 Series Quick Installation Manual page 2

Advertisement

Model I
Model II, Model III
1.
Copper port rate status indicator
2.
Fiber port rate status indicator
3.
Copper port connection status indicator
4.
Fiber port connection status indicator
5.
Power supply indicator
6.
Copper port working mode indicator
7.
Hanger
8.
100M fiber port
9.
100M copper port
10.
External DC round head power supply input
terminal
11.
AC outlet
12.
AC outlet switch
13.
Built-in 48VDC power supply input terminal
【Mounting Dimension】
Unit: mm
Model I
Model II, Model III
Notice before mounting:
Don't place or install the device in area near water or
moist, keep the relative humidity of the device
surrounding between 5%~95% without condensation.
Before power on, first confirm the supported power
supply specification to avoid over-voltage damaging the
device.
The device surface temperature is high after running;
please don't directly contact to avoid scalding.
【Wall-mounting the Device】
Step 1
Put the device on the wall it will be mounted as
reference or to refer to its mounting dimension, and
mark the locations of 2 expansion screws.
Step 2
Put the device on the marked wall and tighten the
screws toward the marked locations, mounting
ends.
【Disassembling the Device】
Step 1
Device powers off
Step 2
Hold the device steady and unscrew the nuts on
the wall.
Step 3
Take out the device, disassembling ends.
Notice before powering on:
Power ON operation: first connect power line to the
connection terminal of device power supply, then power
on.
Power OFF operation: first unpin the power plug, then

Advertisement

loading

This manual is also suitable for:

Model1100-5vdcModel1100-220vacModel1100-48vdc