Download Print this page

Huawei SUN2000-5KTL-L1 Installation Manual page 5

Hide thumbs Also See for SUN2000-5KTL-L1:

Advertisement

Power meter configuration
To configure the meter, go to Maintenance from the home screen. Click on Manage sub-device and add our
DDSU666-H (single phase) meter. The inverter will start scanning the device and if the connections are
correct, it will add it automatically.
If the measurements or the energy diagram shown is not logical, we must change the direction of the clamp
or configure this direction in the meter options through this same app.

Advertisement

loading