Page 1
Installation Guide Model Number harvi-65A3PR, harvi-65A3PR-A myenergi Pioneer Business Park, Faraday Way Revision 4.2 June 2022 Stallingborough, Lincolnshire, England, DN41 8FF D3171...
Page 2
(CT) for measuring the grid and/or generation power - instead the CT is connected to harvi. No power source is needed for harvi - the energy harvested from the CT is used to transmit the measurement signal to your other myenergi device.
Page 3
Check the serial number on the screen matches the number on the front of the harvi device and press () or (+) to add the harvi device. NOTE If pairing the harvi to a network of already paired devices, the harvi should only be paired with the ‘Master’. myenergi Pioneer Business Park, Faraday Way Revision 4.2 June 2022...
Page 4
Step 3: Configuration After pairing the harvi, the myenergi device will need to be configured to use the harvi. The function of the CT’s connected to the harvi are also configured via the myenergi unit. On the myenergi ‘Master’ device, go to Settings > Advanced > CT config Disable the relevant CT input(s) for that device - this ensures the unit uses the harvi CT instead of a wired CT.
Page 5
Operating Temperature: -30°C to +50°C Technical Support If you experience any issues with your harvi during or post installation, please contact our technical support team by scanning the QR Code below https://myenergi.com/support-centre/ Please contact us directly for the quickest solution myenergi Pioneer Business Park, Faraday Way Revision 4.2 June 2022...
Need help?
Do you have a question about the harvi and is the answer not in the manual?
Questions and answers