Wear safety glasses when drilling and/or tapping holes for installation of system. PZ2-8 Skid Mount System should be securely bolted or fastened down to a flat level surface. WARNING: Short term inhalation of high concentrations of ozone and long term inhalation of low concentrations of ozone can cause serious harmful physiological effects.
The two halfs may be unbolted and placed side-by-side if desired, requiring less floor space depth but doubling floor space width. A flat level surface is required for placement of the PZ2-8 Skid Mount System. Minimum of 48” by 40” for back-to-back placement or 90” by 20” for side-by-side placement.
The PZ2-8 System is to be installed as a bypass system with the entrance of the bypass being after the main pool circulation pump but before the filter, and the exit of the bypass being after the filter/heater.
OPERATION Turn on PZ2-8 Boost Pump, (top breaker), and allow water to fill the PZ2-8 plumbing and begin to flow completely through the system. Close the Ball Valve, in between the Venturi Injector(s), by rotating it clockwise fully and allow the system fo run for a minute or two to stabilize.
Need help?
Do you have a question about the PZ2-8 and is the answer not in the manual?
Questions and answers