Prozone PZ2-8 Installation Manual And Operation Manual

Commercial natural water treatment system

Advertisement

COMMERCIAL
Natural Water Treatment System
PZ2-8 Skid Mount System -
Ozone Generator Systems
Prozone Water Products: 3004 11th Ave. - Huntsville, AL - 35805 Phone: 256-539-4570 Website: www.prozoneint.com
Commercial Pools
INSTALLATION GUIDE and
OPERATION MANUAL
T . O
NATURAL TECHNOLOGY
3
Reduces Chemical Usage,
Improves Sanitation
Produces Crystal Clear Water
Copyright 2010

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PZ2-8 and is the answer not in the manual?

Questions and answers

Summary of Contents for Prozone PZ2-8

  • Page 1 Commercial Pools INSTALLATION GUIDE and Ozone Generator Systems OPERATION MANUAL T . O NATURAL TECHNOLOGY Reduces Chemical Usage, Improves Sanitation Produces Crystal Clear Water Copyright 2010 Prozone Water Products: 3004 11th Ave. - Huntsville, AL - 35805 Phone: 256-539-4570 Website: www.prozoneint.com...
  • Page 2: Important Safety Instructions

    Wear safety glasses when drilling and/or tapping holes for installation of system. PZ2-8 Skid Mount System should be securely bolted or fastened down to a flat level surface. WARNING: Short term inhalation of high concentrations of ozone and long term inhalation of low concentrations of ozone can cause serious harmful physiological effects.
  • Page 3: Introduction To Ozone

    The two halfs may be unbolted and placed side-by-side if desired, requiring less floor space depth but doubling floor space width. A flat level surface is required for placement of the PZ2-8 Skid Mount System. Minimum of 48” by 40” for back-to-back placement or 90” by 20” for side-by-side placement.
  • Page 4: Installation

    The PZ2-8 System is to be installed as a bypass system with the entrance of the bypass being after the main pool circulation pump but before the filter, and the exit of the bypass being after the filter/heater.
  • Page 5: Operation

    OPERATION Turn on PZ2-8 Boost Pump, (top breaker), and allow water to fill the PZ2-8 plumbing and begin to flow completely through the system. Close the Ball Valve, in between the Venturi Injector(s), by rotating it clockwise fully and allow the system fo run for a minute or two to stabilize.

Table of Contents