Cisco Nexus 9348GC-FXP-B1 Hardware Installation Manual page 38

Aci-mode switches
Table of Contents

Advertisement

Starting the Switch
c) Insert the connector block into the receptacle on the power supply. Make sure that the connector block clicks when
fully inserted in the receptacle and does not pull out.
d) If there is a safety cover for the terminals, place and secure it over the terminals to avoid an electrical shock hazard.
e) Turn on the power at the circuit breaker for the DC power source.
Step 4
Verify that the power supply
Step 5
Listen for the fans; they should begin operating when the power supply is powered.
Step 6
After the switch boots, verify that the following LEDs are lit:
• On the fan modules, the Status (STA or STS) LED is green.
If a fan module Status LED is not green, try reinstalling the fan module.
• After initialization, the switch chassis Status (labeled as STA or STS) LED is green.
Step 7
Verify that the system software has booted and the switch has initialized without error messages.
A setup utility automatically launches the first time that you access the switch and guides you through the basic
configuration. For instructions on how to configure the switch and check module connectivity, see the appropriate Cisco
Nexus 9000 Series configuration guide.
Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide
28
LED is on and green.
Installing the Switch Chassis

Advertisement

Table of Contents
loading

This manual is also suitable for:

N9k-c9348gc-fxp-b1

Table of Contents