Advertisement

Quick Links

AD-30V Installation Manual
Phase 7 / Dual Timer / S.A.F.E. System
WARNING: For your safety the information
in this manual must be followed to
minimize the risk of fire or explosion and
to prevent property damage, personal
injury or death.
— Do not store or use gasoline or other
flammable vapors and liquids in the
vicinity of this or any other appliance.
— WHAT TO DO IF YOU SMELL GAS:
Do not try to light any appliance.
Do not touch any electrical switch;
do not use any phone in your
building.
Clear the room, building or area of
all occupants.
Immediately call your gas supplier
from a neighbor's phone. Follow
the gas supplier's instructions.
If you cannot reach your gas
supplier, call the fire department.
— Installation and service must be
performed by a qualified installer, service
agency or the gas supplier.
AVERTISSEMENT: Assurez-vous de bien
suivre les instructions données dans cette
notice pour réduire au minimum le risque
d'incendie ou d'explosion ou pour éviter
tout dommage matériel, toute blessure ou
la mort.
—Ne pas entreposer ni utiliser d'essence
ni d'autres vapeurs ou liquides
inflammables à proximité de cet
appareil ou de tout autre appareil.
—QUE FAIRE SI VOUS SENTEZ UNE
ODEUR DE GAZ:
Ne pas tenter d'allumer d'appareils.
Ne touchez à aucun interrupteur. Ne
pas vous servir des téléphones se
trouvant dans le bâtiment.
Évacuez la pièce, le bâtiment ou la
zone.
Appelez immédiatement votre
fournisseur de gaz depuis un voisin.
Suivez les instructions du fournisseur.
Si vous ne pouvez rejoindre le
fournisseur de gaz, appelez le service
des incendies.
—L'installation et l'entretien doivent être
assurés par un installateur ou un
service d'entretien qualifié ou par le
fournisseur de gaz.
American Dryer Corporation
88 Currant Road
Fall River MA 02720-4781 USA
Telephone: +1 (508) 678-9000 / Fax: +1 (508) 678-9447
e-mail: techsupport@amdry.com
www.adclaundry.com
ADC Part No. 113229 - 19

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AD-30V and is the answer not in the manual?

Questions and answers

Summary of Contents for MAXIDRY AD-30V

  • Page 1 AD-30V Installation Manual Phase 7 / Dual Timer / S.A.F.E. System AVERTISSEMENT: Assurez-vous de bien WARNING: For your safety the information suivre les instructions données dans cette in this manual must be followed to notice pour réduire au minimum le risque minimize the risk of fire or explosion and d’incendie ou d’explosion ou pour éviter...
  • Page 2 The illustrations included in this manual may not depict your particular dryer exactly. IMPORTANT For your convenience, log the following information: AD-30V DATE OF PURCHASE ______________________________________________________ MODEL NO. _________________ RESELLER’S NAME __________________________________________________________________________________ SERIAL NUMBER(S) __________________________________________________________________________________...
  • Page 3: Table Of Contents

    WARNING In the State of Massachusetts, the following installation instructions apply: Installations and repairs must be Proposition 65 performed by a qualified or licensed Use of this product could expose you to substances contractor, plumber, or gasfitter qualified or from fuel combustion that contain chemicals licensed by the State of Massachusetts.
  • Page 4: Safety Precautions

    Safety Precautions ___________________ WARNING WARNING The collection of lint in the burner area and exhaust ductwork can create a potential fire hazard. For your safety, the information in this manual must be followed to minimize the risk of fire or explosion or to prevent property damage, personal injury, or loss For personal safety, the dryer must be electrically grounded of life.
  • Page 5: Specifications

    Specifications _____________________________________________________________________ ” 4 ” 8 — — ” 2 ” 8 ” 4 ’ 0 ’ 0 ’ 8 ’ 3 ø ” 8 ” 2 ” 2 ø ” 8 / u t ø ” 8 ” 8 ”...
  • Page 6 Specifications _____________________________________________________________________ NOTE: The manufacturer reserves the right to make changes in specifications at any time without notice or obligation. American Dryer Corp. 113229 - 19...
  • Page 7: Installation Procedures

    Installation Procedures ______________ Clearance provisions must be made from noncombustible construction as noted in this manual (refer to Dryer Installation should be performed by competent technicians Enclosure Requirements). in accordance with local and state codes. In the absence of Provisions must be made for adequate clearances for these codes, the installation must conform to applicable servicing and for operation as noted in this manual (refer to American National Standards: ANSI Z223.1-LATEST...
  • Page 8: Fresh Air Supply Requirements

    Exhaust Requirements _______________ NOTE: Air considerations are important for proper and efficient operation. Exhaust ductwork should be designed and installed by a qualified professional. Improperly sized ductwork will create Dryers may be positioned sidewall to sidewall. However, a excessive back pressure, which results in slow drying, 1/16”...
  • Page 9 Vertical Venting To protect the outside end of the horizontal ductwork from the weather, a 90° elbow bent downward should be installed When vertical single 8-inch (20.32 cm) venting is used (refer where the exhaust exits the building. If the ductwork travels to Illus.
  • Page 10: Electrical Information

    WARNING The illustrations below show the minimum cross section area for multiple dryer venting. These figures must be increased in proportion if the main duct run from the last dryer to where it Dryer must never be operated without the lint exhausts has numerous elbows or is unusually long.
  • Page 11 Electrical Service Specifications Electric Models Only Gas and Steam Models Only All electrically heated dryers must be connected to the electric service shown on the dryer’s data label. The connecting wires must be properly sized to handle the rated current. ELECTRICAL SERVICE SPECIFICATIONS IMPORTANT: 208 VAC AND 230/240 VAC ARE NOT THE SAME.
  • Page 12 IMPORTANT: For personal safety and proper operation, ELECTRICAL SERVICE SPECIFICATIONS the dryer must be grounded. IMPORTANT: 208 VAC AND 230/240 VAC ARE NOT THE SAME. When ordering, specify exact voltage. Provisions are made for ground connection in each dryer at NOTES: When fuses are used they must be dual element, time delay, current the electrical service connection area.
  • Page 13 For 110V Applications 3-Phase (3ø) Wiring Connections / Hookup The electrical connections on all 3-phase (3ø) gas and steam dryers are made into the rear service box located at the upper left area of the dryer. The electrical connections are made at the power distribution block located in the service box.
  • Page 14: Gas Information

    Gas Supply The electrical input connections are made at the electric oven contactor located inside the assembly at the rear center The gas dryer installation must meet the American National upper section of the dryer. The ground connection is made Standard...National Fuel Gas Code ANSI Z223.1-LATEST to a copper lug also provided in this area.
  • Page 15: Steam Information

    L.P. Gas Dryers made for use with L.P. gas have the gas valve’s internal pressure regulator blocked open so that the gas pressure must be regulated upstream of the dryer. The pressure measured at each gas valve pressure tap must be a consistent 10.5 in WC (26.1 mb).
  • Page 16 Steam Coil pH Level Water pockets in the supply line, caused by low points, will provide wet steam to the coil possibly causing steam coil The normal pH level for copper type steam coils must be damage. All horizontal runs of steam supply piping should maintained between a value of 8.5 to 9.5.
  • Page 17 Steam Damper System Operation NOTE: With the dryer off or with no air supply, the steam damper is in cool down mode as shown in Diagram 2. The steam damper, as shown in the illustration below, allows the coil to stay constantly charged eliminating Steam Damper Air Piston (Flow Control) repeated expansion and contraction.
  • Page 18: Preparation For Operation / Start-Up

    Preparation For Operation / Start-Up_ Gas model dryers are equipped with an ignition system, which has internal diagnostics. If ignition is not established The following items should be checked before attempting after one time, the heat circuit in the ignition module will to operate the dryer: attempt two more ignitions (total of three ignition attempts).
  • Page 19: Preoperational Instructions

    Preoperational Instructions _________ NOTE: “0-40” will require the “START/ENTER” key to be pressed after the number is selected in order to accept Coin Models the selection and start drying. Microprocessor Controller (Computer) Press and hold the “UP ARROW” to view the tumbler •...
  • Page 20: Shutdown Instructions

    Service / Parts Information __________ Reversing Timer Spin / Dwell Adjustments Service Timer models have an electronic reversing timer in the electrical service box, which is located in the upper left rear Service must be performed by a qualified trained technician. area of the dryer.
  • Page 21: Returning Warranty Parts

    Routine Maintenance _________________ Returning Warranty Parts Cleaning All dryer or parts warranty claims or inquiries should be addressed to the Warranty Parts Department. To expedite A program and/or schedule should be established for processing, the following procedures must be followed: periodic inspection, cleaning, and removal of lint from various No parts are to be returned without prior written authorization areas of the dryer, as well as throughout the ductwork...
  • Page 22: Adjustments

    90 Days Inspect and remove lint accumulation in customer furnished NOTES _____________________________________________________ exhaust ductwork system and from dryer’s internal exhaust ducting. ____________________________________________________________ WARNING ____________________________________________________________ The accumulation of lint in the exhaust ductwork can create a potential fire hazard. ____________________________________________________________ Do not obstruct the flow of combustion and ventilation air.
  • Page 23: Data Label Information

    Data Label Information ____________________________________________________________ Standard Label CE Label AGA Label When contacting American Dryer Corporation certain information is required to ensure proper service/parts information from ADC. This information is on the data label affixed to the left side panel area behind the top control (access) door.
  • Page 24: Procedure For Functional Check Of Replacement Components

    Procedure for Functional Check Phase 7 Non-Coin Models of Replacement Components ________ Upon completing installation of the replacement microprocessor controller (computer) board, reestablish Microprocessor power to the dryer. Controller (Computer) Board Start the drying cycle by pressing any of the preset cycles in Phase 7 Coin Models letters A-F.
  • Page 25: Manual Reset Burner Hi-Limit Instructions

    Manual Reset For Models with DSI Module (Type I) Burner Hi-Limit Instructions __________ Phase 7 This dryer was manufactured with a manual reset burner hi-limit thermostat, which is monitored by the Phase 7 computer. If the burner hi-limit is open prior to the start of the drying cycle, the dryer will start momentarily and then shut down, the Phase 7 computer will display “burner HIGH LIMIT fault”...
  • Page 26: S.a.f.e. System

    S.A.F.E. System _______________________ Flexible 1/2 feeds must be provided to avoid damage to electric water solenoid valve by vibration. The exclusive S.A.F.E. system will extinguish fires that may start in the drying tumbler. A series of sensors positioned IMPORTANT: Flexible supply line/coupling must be used. throughout the tumbler and interfaced with the Solenoid valve failure due to hard plumbing connections microprocessor will trigger the S.A.F.E.
  • Page 27 Optional Manual Bypass Electrical Requirements Provisions are made in the dryer S.A.F.E. system for the WARNING installation of an optional manual bypass. Depending on the model dryer, the connections for the manual bypass are Electrical power must be provided to the dryer at all made at the “T”...
  • Page 28 S.A.F.E. System Theory of Operation The Phase 7 non-coin microprocessor controller (computer) will prompt the user to perform a S.A.F.E. system valve check While the dryer is in an idle state, or 20-seconds after the at every 4000 hours to ensure proper functionality. At the heat turns off, the Phase 7 control monitors the thermistor 4000 hour mark, the control will wait for end of the cycle and probe, located in the top of the tumbler chamber, and records...
  • Page 29 Shorted Water Valve This message indicates that the water valve is shorted or NOTES _____________________________________________________ that the wiring to the valve is shorted. If this condition is detected, the Phase 7 non-coin control will continue to monitor the condition for a period of 5 minutes before ____________________________________________________________ entering S.A.F.E.
  • Page 30: Non-Coin Programming

    Non-Coin Programming _______________ SAIL SWITCH OPEN FAULT – Sail switch remained open after the cycle started. Should have closed. BURNER HIGH LIMIT FAULT – Burner temp. disk has opened. BURNER IGNITION CONTROL – No signal to gas valve from (DSI) module during trial for ignition time. DSI module is bad.
  • Page 31: Coin Programming

    Coin Programming ____________________ Accessing and Clearing Coin Vault Total Enter program mode by switching program switch (up) while Enter Programming Mode By Placing no cycle is in progress. The Programming Switch On The Phase 7 Board Up While No Cycle Is In Progress. Press HI –...
  • Page 32 ADC Part No. 113229 19 - 10/29/15...

Table of Contents