Installation Accessories Shipped With The Router; Checklist Before Installation - HP MSR 2000 Preparing For Installation

Table of Contents

Advertisement

ESD-preventive gloves, ESD-preventive wrist wrap, and antistatic bag or mat

Installation accessories shipped with the router

Power cord
Console cable
Grounding cable
Mounting brackets

Checklist before installation

Table 4 Checklist before installation
Item
Installation site
Requirements
Ventilation
Temperature
0°C to 45°C (32°F to 113°F).
Relative humidity
5% to 90% (noncondensing).
Cleanness
ESD prevention
EMI prevention
There is a minimum clearance of 10 cm (3.94 in)
around the inlet and outlet vents for heat
dissipation of the router chassis.
A good ventilation system is available at the
installation site.
Dust concentration ≤ 3 × 10
No visible dust on desk within three days.
The equipment and floor are well grounded.
The equipment room is dust-proof.
The humidity and temperature are at a proper
level, respectively.
Wear an ESD-preventive wrist strap and uniform
when touching a circuit board.
Place the removed memory module, CF card, or
interface module on an antistatic workbench, with
the face upward, or put it into an antistatic bag.
Touch only the edges, instead of electronic
components when observing or moving a removed
memory module, CF card, or interface module.
Take effective measures to protect the power
system from the power grid system.
Separate the protection ground of the router from
the grounding device or lightning protection
grounding device as far as possible.
Keep the router far away from radio stations, radar
and high-frequency devices working in high
current.
Use electromagnetic shielding when necessary.
5
Result
4
particles/m
3
.

Advertisement

Table of Contents
loading

Table of Contents