Step 2 - Switch Installation; Desktop Or Shelf Installation; Grounding The Switch - D-Link DGS-1210-52MP Quick Installation Manual

Hide thumbs Also See for DGS-1210-52MP:
Table of Contents

Advertisement

Available languages

Available languages

Step 1 – Unpacking
Open the shipping carton and carefully unpack its
contents. Please consult the packing list located in the
User Guide to make sure all items are present and
undamaged. If any item is missing or damaged, please
contact your local D-Link reseller for replacement.
Please note that the model you have purchased may
appear slightly different from those shown in the
illustrations.
- One D-Link Switch
- Rack mounting bracket
- Power cord
- One console cable
- Power cord retainer
- User' s Gui de CD
- Quick Installation Guide
- An accessory kit
Step 2 – Switch Installation
For safe switch installation and operation, it is
recommended that you:
• Visually inspect the power cord to see that it is secured
fully to the AC power connector.
• Make sure that there is proper heat dissipation and
adequate ventilation around the switch.
• Do not place heavy objects on the switch

Desktop or Shelf Installation

When installing the switch on a desktop or shelf, the
rubber feet included with the device must be attached
on the bottom at each corner of the device's base. Allow
enough ventilation space between the device and the
objects around it.
Figure 1. Attaching the rubber feet

Grounding the Switch

This section describes how to connect the Switch to
ground. You must complete this procedure before
powering on your Switch.
Required Tools and Equipment
• Grounding screws (included in the accessory kit):
One M4 x 6 mm (metric) pan-head screw
• Grounding cable (not included in the accessory kit):
The grounding cable should be sized according
to local and national installation requirements.
Depending on the power supply and system, a
12 to 6 AWG copper conductor is required for
installation. Commercially available 6 AWG wire is
recommended. The length of the cable depends
on the proximity of the Switch to proper grounding
facilities.
• A screwdriver (not included in the accessory kit)
You can connect the Switch to a protective ground by
following the steps below:
1. Verify if the system power is off.
2. Use the grounding cable to place the #8 terminal
lug ring on top of the ground-screw opening.
3. Insert the grounding screw into the ground-screw
opening.
4. Using a screwdriver, tighten the grounding screw to
secure the grounding cable to the Switch.
5. Attach the terminal lug ring at the other end of the
grounding cable to an appropriate grounding stud or
bolt on rack where the Switch is installed.
6. Verify if the connections at the ground connector on
the Switch and the rack are securely attached.
Figure 2. Connect a Grounding Cable
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dgs-1210-52me

Table of Contents