Download Print this page

Name And Functions Of Each Part - Haier AU55NFUAHA Operation Manual

Outdoor unit mrv intelligent network air-conditioner
Hide thumbs Also See for AU55NFUAHA:

Advertisement

Name and functions of each part

AU96NFTAHA AU96NFTBHA
AU55NFUAHA
Cautions:
Please turn on the electrical power switch 12 hours ahead of the first operation. Please do not
cut off the power for a day and night's short time break. This is for the protection of the air-
compressor.
Be careful not to build up the inlet and outlet. Otherwise the performance of air-conditioner
shall be reduced and protection set shall be into operation.
Outlet
Heated wind blew out during cool operation
Cooled wind blew out during Heat operation
Fixing up bolts
Joining for refrigerant piping
Wring threading holes for power supply cord
Inlet---situated on both the left and right side, and the back
Joining for refrigerant piping
Fixing up bolts
Wring threading holes for power supply cord
Inlet---situated on both the left and right side, and the back
5

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Au96nftahaAu96nftbha