Midea ATOM MDV-V28WDHN1 Manual page 88

Commercial air conditioners
Table of Contents

Advertisement

-I
4.8 Gastightness Test
4.8.1 Purpose
To prevent faults caused by refrigerant leakage, a gastightness test should be performed before system commissioning.
4.8.2 Procedure
Notes for installers
Warning
Only dry nitrogen should be used for gastightness testing. Oxygen, air, flammable gases and toxic gases must not be
used for gastightness testing. Use of such gases may result in fire or explosion.
Procedure
The gastightness test procedure is as follows:
Step 1
 Once the piping system is complete and the indoor and outdoor units have been connected, vacuum the piping
to -0.1MPa.
Step 2
 Charge the indoor piping with nitrogen at 0.3MPa through the needle valves on the liquid and gas stop valves
and leave for at least 3 minutes (do not open the liquid or gas stop valves). Observe the pressure gauge to check
for large leakages. If there is a large leakage, the pressure gauge will drop quickly.
 If there are no large leakages, charge the piping with nitrogen at 1.5MPa and leave for at least 3 minutes.
Observe the pressure gauge to check for small leakages. If there is a small leakage, the pressure gauge will drop
distinctly.
 If there are no small leakages, charge the piping with nitrogen at 4.0MPa and leave for at least 24 hours to check
for micro leakages. Micro leakages are difficult to detect. To check for micro leakages, allow for any change in
ambient temperature over the test period by adjusting the reference pressure by 0.01MPa per 1°C of
temperature difference. Adjusted reference pressure = Pressure at pressurization + (temperature at observation
– temperature at pressurization) x 0.01MPa. Compare the observed pressure with the adjusted reference
pressure. If they are the same, the piping has passed the gastightness test. If the observed pressure is lower
than the adjusted reference pressure, the piping has a micro leakage.
 If the leakage is detected, refer to Part 3, 4.8.3 "Leak detection". Once the leak has been found and fixed, the
gastightness test should be repeated.
Step 3
 If not continuing straight to vacuum drying (see Part 3, 4.9 "Vacuum Drying") once the gastightness test is
complete, reduce the system pressure to 0.5-0.8MPa and leave the system pressurized until ready to carry out
the vacuum drying procedure.
Figure 3-4.11: Gastightness test
Atom B Series VRF 50/60Hz
87

Hide quick links:

Advertisement

Table of Contents
loading