Download Print this page

Huawei SUN2000-75KTL Series Quick Manual page 9

Solar inverter
Hide thumbs Also See for SUN2000-75KTL Series:

Advertisement

4.2
Installing a PE Cable
It is recommended that the
PE cable of the solar inverter
be connected to a nearby
ground point. Connect the PE
points of all solar inverters in
the same array to ensure
equipotential connections to
PE cables.
To enhance the corrosion
resistance of a ground
terminal, you are advised to
apply silica gel or paint on it
after connecting the PE cable.
Opening the Maintenance Compartment Door
4.3
Do not open the panel of the solar inverter.
Before opening the maintenance compartment door, turn off the downstream AC output
switch and three DC switches at the bottom.
Do not open the maintenance compartment door in rainy or snowy days. If you have to, take
protective measures to prevent rain or snow from entering the maintenance compartment.
Do not leave unused screws in the maintenance compartment.
1. Loosen the screws on the
maintenance compartment door.
2. Open the maintenance compartment door and
adjust the support bar.
8
Reserved PE point

Advertisement

loading