CV110 User’s manual ENGLISH CONTENTS 1. GENERAL DESCRIPTION ....................2 2. CONTROLES Y ELEMENTOS ..................3 3. RECEPTION OF THE VIBRATION CALIBRATOR ............5 4. SCREEN ........................... 5 5. OPERATION ........................6 5.1 Verification process ..................... 6 5.1.1 Verification of VC431 vibrometer ............... 7 5.1.2 Verification of SC310 with module VM310............
=1000 rad/s (f=159.15 Hz). The vibration calibrator allows accelerometers weighting up to 500 g. The CV110 vibration calibrator has rubber pads in order to insulate it from vibrations transmitted through the contact surface. The internal battery of the CV110 vibration calibrator makes it suitable for verifying accelerometers on the measurement site.
1. Shaker head. Head for fixing accelerometers. 2. Screen of calibrator. 3. On/Off switch. 4. Rubber legs. Rubber legs for insulating the CV110 from vibration. 5. Reset button. Button to reset the computer. 6. DC power input. Input for connecting the 15 VDC mains plug adapter.
CV110 User’s manual 3. RECEPTION OF THE VIBRATION CALIBRATOR When receiving the vibration calibrator check that has the following material: The CV110 vibration calibrator Transport briefcase Fastening adapter set Power adapter This user’s manual 4. SCREEN...
5. OPERATION Before beginning the verification process be sure that the accelerometer is correctly fixed to the shaker’s head. To ensure this you can use some stud bolt adapters with different metrics supplied together with the calibrator. Magnetic and adhesive fixing is allowable only for estimate calibrations.
User’s manual 5.1.1 Verification of VC431 vibrometer a) Place the accelerometer in the head of the CV110. It will suffice to press the accelerometer against the calibrator head with the hand. Although it is advisable to connect the accelerometer with a screw or by using a mounting magnet.
5.1.2 Verification of SC310 with module VM310 a) Couple the accelerometer to the CV110. See next figure: b) Screw the cable to the accelerometer. See next figure: c) Turn on the calibrator. d) Next, press to access to the SC310 menu.
To charge the battery, connect the supplied mains plug adapter to the charge socket at the side of the case of the CV110 calibrator. The battery indicator is located in the upper left hand corner of the display. If the level indicator is full, the battery level of calibrator is optimal.
CV110 User’s manual Running hours with one battery charge 5 hours with m=100g Automatic shut-off timer 10 minutes Dimensions length x width x height 100 x 100 x 120 mm Weight 2.2 kg as an electric or electronic equipment manufacturer informs you that the...