Download Print this page

DAS company Sp38 Installation Instructions Manual page 14

Advertisement

Gently raise the tent on its one side and mount pipes (nr.1). A single hole in the pipe (nr.1) hould be directed downwards.
Then lift the tent on the other side and repeat the step.
1
Add corner foot to the construction of the tent (nr.6) diagonally and the feet (nr.7) also diagonally. On the sides of the
tent put feet (nr.8) and connect them with pipes (nr.2) dfor tents with uneven length for example: 9m, 11m, 13m, etc. in
the third section, install the pipe extending by 1m (nr.3). Then, on the front and back of the tent install feet (nr.9) and
connect them with corner feet using a pipe (nr.2). Attach feet of the tent to the ground firmly.
2
8
7
9
2
2
1
2
8
8
2 or 3
9
2
STEP 3
STEP 4
6
2
2
2
8
8
8
2
6
1
1
9
9
2
2
2
8
8
2
2 or 3
1
2
7
8
2
8

Advertisement

loading

Related Products for DAS company Sp38