Installation and commissioning

6.1

Requirements for the installation site

The machine may only be set up indoors on a level and sufficiently load-bearing surface.
Parameter
Permissible ambient temperature
Permissible relative humidity
6.2

Setting up the machine and putting it into operation

The microscope must be designed and built for the machine and the associated static and
dynamic loads.
The machine must be spatially arranged in such a way that, when used as intended, there
is safe assembly, operation, disassembly and a possibility for evasion.
Approach
CAUTION
Risk of injury from carrying loads that are too heavy.
Observe the limit values for lifting and carrying loads.
Use suitable lifting gear for transport.
WARNING
Work on live components of the machine may only be carried out by
a qualified electrician.
Observe applicable national standards and regulations for the electri-
cal connection of the machine.
Installation, assembly and commissioning may only be carried out by qualified personnel of
the manufacturer or by trained personnel authorised by the manufacturer in compliance with
the safety instructions.
FastWheel_V1.1_211123_EN
Installation and commissioning
Unit
Value
[°C]
+15 °C to +40 °C
Max. 60
[%]
(non-condensing)
13

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FastWheel and is the answer not in the manual?

This manual is also suitable for:

0001

Table of Contents