ILMEG X-125 Installation And Operating Instructions Manual

Dust collector system

Advertisement

Quick Links

X-125
Dust Collector System
Installation and operating instructions
ILMEG Products AB, Sweden. Phone +46 155 220270 Fax +46 155 220277 mail: info@ilmeg.se web: www.ilmeg.se
We reserve the right to change the specification without prior notice.

Advertisement

Table of Contents
loading

Summary of Contents for ILMEG X-125

  • Page 1 X-125 Dust Collector System Installation and operating instructions ILMEG Products AB, Sweden. Phone +46 155 220270 Fax +46 155 220277 mail: info@ilmeg.se web: www.ilmeg.se We reserve the right to change the specification without prior notice.
  • Page 2: Safety Regulations

    Always replace worn or damaged signs. Warning If the air coming out of the suction fan contains dust. Stop immediately the X-125 and check for leakages. Never operate with dust coming out of the suction fan since the suction fan will be worn out.
  • Page 3: Mechanical Installation

    Installation Mechanical installation Make sure the mechanical bracket used for the X-125 is sufficient to carry the full weight of the dust collector in rock drilling applications. Correct mounting is as close to the feed beam/ rock drill as possible to reduce the suction hose length. The suction hose should be as straight as possible.
  • Page 4: Hydraulic Installation

    Hydraulic installation Contact a hydraulic specialist to design the hydraulic circuit for your application. The hydraulic hoses for the pressure and return line must have the capacity of 22 l/min and 200 Bar pressure without excessive counter pressure. Recommended size is Ø ½” or Ø 13 The drain line size is recommended to be Ø...
  • Page 5 Air pressure installation for the filter cleaning system Connect air supply for the filter cleansing function of the dust collector. Recommended pressure is 7 BAR or 100 PSI. To safeguard full filter cleansing effect a Ø 1” or Ø 25 mm hose is recommended. Warning Always use proper quality of pneumatic hoses and fittings to reduce risk of leakage.
  • Page 6: Electrical Installation

    Electrical installation The electric control system controls the cleansing sequence and opens and closes the air valves in the dust collector Connect the control box to 24 V DC and connect the drilling signal to the system giving 24 V DC as “drilling signal “...
  • Page 7: To Change Parameters

    By pressing once on “A” the menue for setting the parameters / times during drilling appears. Paus means the time between the cleaning pulse during drilling. (see i-clean above) Factory setting is: Pause: 1000 x 10ms = 10 seconds Delay means tie to close one of the air valves.
  • Page 8 Suction hose installation: The suction hose recommended for the X-125 is Ø 5“ or Ø 125 mm. Mount the suction hose on the machine avoiding bends on the hose to secure the best suction capacity. LMEG Products AB, Sweden. Phone +46 155 220270 Fax +46 155 220277 mail: info@ilmeg.se web: www.ilmeg.se...