Lochinvar FTXL 1000 Installation & Operation Manual

Lochinvar FTXL 1000 Installation & Operation Manual

Hide thumbs Also See for FTXL 1000:
Table of Contents

Advertisement

Quick Links

FTXL-I-O_100361229_2000617079_Rev A
Installation & Operation Manual
Model: 1000
2000603369 00
This manual must only be used by a
WARNING
qualified heating installer / service
technician. Read all instructions,
including this manual and the FTXL
Service Manual, before installing.
Perform steps in the order given.
Failure to comply could result in
severe personal injury, death, or
substantial property damage.
Save this manual for future reference.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FTXL 1000 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Lochinvar FTXL 1000

  • Page 1 FTXL-I-O_100361229_2000617079_Rev A Installation & Operation Manual Model: 1000 2000603369 00 This manual must only be used by a WARNING ⚠ qualified heating installer / service technician. Read all instructions, including this manual and the FTXL Service Manual, before installing. Perform steps in the order given. Failure to comply could result in severe personal injury, death, or substantial property damage.
  • Page 2: Table Of Contents

    Contents HAZARD DEFINITIONS ..........2 Relief Valve Installation ........... 32 PLEASE READ BEFORE PROCEEDING ..... 3 Near Boiler Piping Components ........33 THE FTXL -- HOW IT WORKS ........4-5 Circulator Sizing ............... 33 RATINGS ................6 Near Boiler Piping Connections ........34 1.
  • Page 3: Please Read Before Proceeding

    Installation & Operation Manual Please read before proceeding Installer – Read all instructions, including DO NOT install units in rooms or WARNING WARNING ⚠ ⚠ this manual and the FTXL Service Manual, environments that contain corrosive before installing. Perform steps in the contaminants (see Table 1A on page 10).
  • Page 4: The Ftxl - How It Works

    Installation & Operation Manual The FTXL - How it works... Stainless steel heat exchanger 21. Low voltage connection board Allows system water to flow around specially designed tubes for The connection board provides easy access for connecting external low voltage devices. maximum heat transfer, while providing protection against flue gas 22.
  • Page 5 Installation & Operation Manual The FTXL - How it works... (continued) Front View Rear View DIR #2000544916 00 Left Side (inside unit) Right Side (inside unit)
  • Page 6: Ratings

    Installation & Operation Manual Ratings FTXL Boiler Other Specifications AHRI Rating Input Model Number Boiler Gross AHRI Water Water Vent Output Ratings Size Content Connections Connections Size Water, (Note 4) Note: Change “N” to Gallons “L” for L.P. gas models. (Note 1) (Note 2) (Note 3)
  • Page 7: Determine Boiler Location

    Installation & Operation Manual Determine boiler location Installation must comply with: DO NOT install the boiler in a room likely to freeze. • Local, state, provincial, and national codes, laws, This appliance is certified as an indoor WARNING regulations, and ordinances. ⚠...
  • Page 8 Installation & Operation Manual Determine boiler location (continued) Figure 1-1 Closet Installation - Minimum Required Clearances For closet installations, CPVC, WARNING ⚠ CLOSET INSTALLATION polypropylene or stainless steel vent material MUST BE used in 1/4" (6 MM) MINIMUM CLEARANCE AROUND HOT WATER PIPES a closet structure due to elevated 1"...
  • Page 9: Provide Air Openings To Room

    Installation & Operation Manual Determine boiler location Provide air openings to room: Residential garage installation FTXL alone in boiler room Precautions Take the following precautions when installing the appliance 1. No air ventilation openings into the boiler room are in a residential garage. If the appliance is located in a needed when clearances around the FTXL are at least residential garage, it should be installed in compliance with equal to the SERVICE clearances shown in FIG.’s 1-1...
  • Page 10: Corrosive Contaminants And Sources

    Installation & Operation Manual Determine boiler location (continued) Table 1A Corrosive Contaminants and Sources When using an existing vent system to install a new boiler: Products to avoid: Failure to follow all instructions can result WARNING ⚠ Spray cans containing chloro/fluorocarbons in flue gas spillage and carbon monoxide emissions, causing severe personal injury Permanent wave solutions...
  • Page 11: Removing A Boiler From Existing Common Vent

    Installation & Operation Manual Determine boiler location (continued) When removing a boiler from existing common vent system: Do not install the FTXL into a common g. Any improper operation of the common venting DANGER ⚠ vent with any other appliance. This system should be corrected so the installation conforms with the National Fuel Gas Code, ANSI Z223.1/...
  • Page 12 Installation & Operation Manual Determine boiler location Combustion ventilation requirements for appliances drawing air from the equipment room Provisions for combustion and ventilation air must be in accordance with Air for Combustion and Ventilation, of the latest edition of the National Fuel Gas Code, NFPA 54 / ANSI Z223.1, in Canada, the latest edition of CGA Standard B149 Installation Code for Gas Burning Appliances and Equipment, or applicable provisions of the local building codes.
  • Page 13 Installation & Operation Manual Determine boiler location (continued) Under no circumstances should the If a single combustion air opening is provided to bring CAUTION ⚠ equipment room ever be under negative combustion air in directly from the outdoors, the pressure. Particular care should be taken opening must be sized based on a minimum free area where exhaust fans, attic fans, clothes dryers, of one square inch per 3000 Btu/hr (7 cm...
  • Page 14: Prepare Boiler

    Failure to comply could result in severe personal injury, death, or substantial property damage. The FTXL 1000 does not require a venturi change for propane operation, but they will require a valve adjustment. After converting to LP, check combustion WARNING ⚠...
  • Page 15: General Venting

    Installation & Operation Manual General venting Direct venting options - Sidewall Vent 2000603432 00 Two Pipe Sidewall See page 25 for more details Direct venting options - Vertical Vent 2000603465 00 2000603467 00 Two Pipe Vertical Vertical Vent, Sidewall Air See page 37 for more details...
  • Page 16: Install Vent And Combustion Air Piping

    Installation & Operation Manual General venting (continued) Install vent and combustion air piping The FTXL boiler must be vented and The FTXL boiler vent and air piping can be installed through DANGER ⚠ supplied with combustion and ventilation the roof or through a sidewall. Follow the procedures in this air as described in this section.
  • Page 17: Requirements For Installation In Canada

    AL29-4C, stainless steel material to be sealed to material to comply with this requirement. specification of its manufacturer. The 4" Concentric Vent Kit available from Lochinvar (see *Plastic pipe may require an adapter (not provided) Section 4 – Sidewall Termination – Optional Concentric to transition between the air inlet connection on the Vent) is approved for use on the FTXL boiler.
  • Page 18: Optional Room Air

    Installation & Operation Manual General venting When utilizing the single pipe method, WARNING (continued) ⚠ provisions for combustion and ventilation air must be in accordance with Air for The PVC, CPVC, or ABS air inlet pipe should be cleaned and Combustion and Ventilation, of the latest sealed with the pipe manufacturer’s recommended solvents edition of the National Fuel Gas Code,...
  • Page 19: Pvc/Cpvc

    FTXL boilers connected to the common vent must all be of the same size. PVC/CPVC Each FTXL boiler must have a Lochinvar supplied flue This product has been approved for use with the PVC/CPVC damper installed (see Table 3C). vent materials listed in Table 3D on page 21.
  • Page 20 Installation & Operation Manual General venting (continued) Table 3D PVC/CPVC Vent Pipe and Fittings Dry fit vent or air piping to ensure proper fit up before assembling any joint. The pipe should go Approved PVC/CPVC Vent Pipe and Fittings a third to two-thirds into the fitting to ensure Item Material Standard...
  • Page 21: Polypropylene

    Installation & Operation Manual General venting The installer must use a specific vent starter NOTICE adapter at the flue collar connection. The adapter is supplied by the vent manufacturer Polypropylene to adapt to its vent system. See Table 3E This product has been approved for use with polypropylene for approved vent adapters.
  • Page 22: Stainless Steel Vent

    Installation & Operation Manual General venting (continued) Stainless steel vent Figure 3-6 Near Boiler Stainless Steel Venting This product has been approved for use with stainless steel using the manufacturers listed in Table 3G. Use only the materials, vent systems, and WARNING ⚠...
  • Page 23: Determine Location

    Installation & Operation Manual Sidewall direct venting Do not terminate above any door or window. Vent/air termination – sidewall Condensate can freeze, causing ice formations. Locate or guard vent to prevent condensate damage Follow instructions below when WARNING ⚠ to exterior finishes. determining vent location to avoid possibility of severe personal injury, death, Figure...
  • Page 24: Sidewall Direct Venting Vent/Air Termination - Sidewall

    Installation & Operation Manual Sidewall direct venting (continued) Vent/air termination – sidewall Do not terminate closer than 4 feet (1.2 m) horizontally from any electric meter, gas meter, Figure 4-2A PVC/CPVC/ Polypropylene Sidewall regulator, relief valve, or other equipment. Never Termination w/Field Supplied Fittings terminate above or below any of these within 4 feet (1.2 m) horizontally.
  • Page 25: Prepare Wall Penetrations

    Installation & Operation Manual Sidewall direct venting Vent/air termination – sidewall 3. Use a sidewall termination plate as a template for correct Figure 4-4A Clearance to Forced Air Inlets w/Field location of hole centers. Supplied Fittings 4. Follow all local codes for isolation of vent pipe when passing IF LESS through floors or walls.
  • Page 26: Multiple Vent/Air Terminations

    Installation & Operation Manual Sidewall direct venting (continued) Multiple vent/air terminations Mount and secure the vent plate to the wall using stainless steel screws. 1. When terminating multiple FTXL’s terminate Seal all gaps between the pipes and wall. Seal around the each vent/air connection as described in this manual plate to the wall assuring no air gaps.
  • Page 27: Vertical Direct Venting Vent/Air Termination - Vertical

    Installation & Operation Manual Vertical direct venting Vent/air termination – vertical Follow instructions below when WARNING Figure 5-1A PVC/CPVC/Polypropylene Vertical ⚠ determining vent location to avoid Termination of Air and Vent possibility of severe personal injury, death or substantial property damage. ALTERNATE INTAKE LOCATIONS: INTAKE PIPES MAY BE LOCATED ANYWHERE WITHIN 24"...
  • Page 28: Prepare Roof Penetrations

    Installation & Operation Manual Vertical direct venting Vent/air termination – vertical Prepare roof penetrations Air pipe penetration: Cut a hole for the air pipe. Size the air pipe hole as Figure 5-2 Vertical Terminations with Multiple Boilers close as desired to the air pipe outside diameter. 12"...
  • Page 29: Alternate Vertical Concentric Venting

    Installation & Operation Manual Vertical direct venting (continued) Alternate vertical concentric venting This appliance may be installed with a concentric vent Figure 5-4 Concentric Vent Example 1 arrangement where the vent pipe is routed through an existing unused venting system; or by using the existing FLUE EXHAUST unused venting system as a chase for vent and combustion SEAL...
  • Page 30 Installation & Operation Manual Vertical direct venting Existing vent as a chase Follow all existing termination and clearance requirements and allowable pipe lengths. Use only approved venting materials listed in the General Venting Section of this manual. Figure 5-6 Existing Vent as a Chase FLUE EXHAUST SEAL AIR INLET...
  • Page 31: Hydronic Piping

    Installation & Operation Manual Hydronic piping System water piping methods Basic steps are listed below along with illustrations on the following pages (FIG.’s 6-5 through 6-10), which will guide you The FTXL is designed to function in a closed loop system through the installation of the FTXL (reference FIG.’s 6-3A and pressurized to not less than 12 psi (83 kPa) (Non-metallic 6-3B).
  • Page 32: Relief Valve Installation

    Installation & Operation Manual Hydronic piping Relief valve temperature Figure 6-1 Flow Switch, Relief Valve and Temperature and pressure gauge installation Pressure Gauge Installation Basic steps are listed below to guide you through the installation of the relief valve, and temperature and pressure gauge provided with the unit.
  • Page 33: Near Boiler Piping Components

    13. System temperature sensor: inadvertent high limit shutdowns and poor system Lochinvar supplies a system temperature sensor. The performance. Flow rates are based on a full flow sensor is to be installed in the heating loop downstream application.
  • Page 34: Near Boiler Piping Connections

    PIPING SENSOR PUMP CAUTION ⚠ DIR #2000546697 01 through a single FTXL 1000 boiler is 150 GPM. Exceeding this flow rate will result in damage to the heat exchanger and/or piping. Reference Table 6A1 for the minimum NOTICE Figure 6-3B Near Boiler Piping w/Low Loss Header recommended flow rate through a single FTXL boiler at full fire to maintain a 80°F...
  • Page 35 Installation & Operation Manual Hydronic piping (continued) Figure 6-4 Pressure Drop vs. Flow HEX Pressure Drop (Full Flow Application) FTX725-850 FTX400-600 FTX1000 15 ft 15 ft 14 ft 14 ft FTX725-850 13 ft 13 ft 12 ft 12 ft FTX400-600 11 ft 11 ft 10 ft...
  • Page 36: Piping Diagrams

    Installation & Operation Manual Hydronic piping Figure 6-5 Multiple Boilers - Alternate - Fixed or Variable Flow Primary System Piping Number of Units Model Manifold Pipe Sizes in Inches (mm) 4 (102) 5 (127) 6 (152) 8 (203) 8 (203) 8 (203) 10 (254) 1000 FROM SYSTEM...
  • Page 37 Installation & Operation Manual Hydronic piping (continued) Figure 6-6 Single Boiler - Multiple Temperatures WIRES TO TEMP TEMP TEMP LOOP SENSORS LOOP 1 LOOP 2 LOOP 3 SENSOR 1 SENSOR 2 SENSOR 3 SENSOR 1 SENSOR 2 SENSOR 3 120VAC TO PUMPS PUMP 1 PUMP 2...
  • Page 38 Installation & Operation Manual Hydronic piping Figure 6-7 Single Boiler - Primary/Secondary Piping MAY SUBTITUTE LOW LOSS HEADER FROM SYSTEM SYSTEM MAKE UP WATER NOT TO EXCEED 4 PIPE DIA OR MAX OF 12” APART INDIRECT DHW HOT WATER OUT BOILER TANK COLD...
  • Page 39 Installation & Operation Manual Hydronic piping (continued) Figure 6-8 Multiple Boilers - Multiple Temperatures Number of Units Model Manifold Pipe Sizes in Inches (mm) 4 (102) 5 (127) 6 (152) 8 (203) 8 (203) 8 (203) 10 (254) 1000 WIRES TO TEMP TEMP TEMP...
  • Page 40 Installation & Operation Manual Hydronic piping Figure 6-9 Multiple Boilers - Primary/Secondary Piping Number of Units Model Manifold Pipe Sizes in Inches (mm) 4 (102) 5 (127) 6 (152) 8 (203) 8 (203) 8 (203) 10 (254) 1000 MAY SUBTITUTE LOW LOSS HEADER FROM SYSTEM...
  • Page 41 Installation & Operation Manual Hydronic piping (continued) Figure 6-10 Single Boiler - Multiple Temperatures with DHW Piped as a Zone WIRES TO TEMP TEMP TEMP LOOP SENSORS LOOP 1 LOOP 2 LOOP 3 SENSOR 1 SENSOR 2 SENSOR 3 SENSOR 1 SENSOR 2 SENSOR 3 120VAC...
  • Page 42: Gas Connections Connecting Gas Supply Piping

    Installation & Operation Manual Gas connections Connecting gas supply piping 1. Remove the top access panel and refer to FIG. 7-1 to pipe 3. Support piping with hangers, not by the boiler or its gas to the boiler. accessories. Install ground joint union for servicing, when The gas valve and blower will not support required.
  • Page 43: Natural Gas

    Installation & Operation Manual Gas connections (continued) Natural gas supply pressure requirements Failure to apply pipe sealing compound WARNING ⚠ as detailed in this manual can result 1. Pressure required at the gas valve inlet pressure port: in severe personal injury, death, or substantial property damage.
  • Page 44: Check Inlet Gas Supply

    Installation & Operation Manual Gas connections Table 7A Natural Gas Pipe Size Chart Capacity of Schedule 40 Metallic Pipe in Cubic Feet of Natural Gas Per Hour (based on .60 specific gravity, 0.30" w.c. pressure drop) Pipe Length of Pipe in Straight Feet Size (Inches) 1 1/4 1,060 1 1/2 1,580 1,090...
  • Page 45: Gas Pressure

    Installation & Operation Manual Gas connections (continued) When re-tightening the set screw, be sure Gas pressure WARNING ⚠ to tighten securely to prevent gas leaks. The gas pressure must remain between 4 inches w.c. Do not check for gas leaks with an open (.99 kPa), and maximum 14 inches w.c.
  • Page 46: Field Wiring

    Installation & Operation Manual Field wiring Line voltage connections ELECTRICAL SHOCK HAZARD – For WARNING ⚠ your safety, turn off electrical power 1. Connect 120 VAC power wiring to the line voltage terminal supply before making any electrical strip in the junction box, as shown in FIG. 8-1. connections to avoid possible electric 2.
  • Page 47 0 - 10V input on the boiler pump speed control. The tank sensor included with the Lochinvar Squire® indirect Rate output DHW tanks (100170544) is the only sensor suitable for use with the SMART SYSTEM control.
  • Page 48: Wiring Of The Cascade

    Installation & Operation Manual Field wiring Connect the system supply sensor and outdoor air sensor (if See the FTXL Service Manual for instructions on how to used) to the Leader boiler. For the Cascade system to work use the inlet sensor as the controlling sensor. When the properly the system supply sensor must be installed.
  • Page 49 Installation & Operation Manual Field wiring (continued) Figure 8-3 Low Voltage Field Wiring Connections...
  • Page 50: Condensate Disposal Condensate Drain

    Installation & Operation Manual Condensate disposal Condensate drain Use materials approved by the authority NOTICE having jurisdiction. In the absence of other 1. The FTXL is a high efficiency appliance that produces authority, PVC and CPVC pipe must comply condensate. with ASTM D1785 or D2845.
  • Page 51: Startup

    Installation & Operation Manual Start-up Pre-Commissioning Cleaning Additional Boiler Water and Make-Up Water Specifications Do not use petroleum-based cleaning or CAUTION sealing compounds in the boiler system. Table 10B Additional Boiler Water and Make-Up Gaskets and seals in the system may be Water Specifications damaged.
  • Page 52 Installation & Operation Manual Start-up Freeze protection fluids Ethylene glycol is toxic, DO NOT use as Precautions include installing a water meter to evaluate the WARNING ⚠ your freeze protection fluid. Ethylene fresh water volume entering the system (should be no more glycol has a sweet aroma which children than 5% system volume).
  • Page 53 Installation & Operation Manual Start-up (continued) Check for gas leaks Propane boilers only – Your propane WARNING ⚠ supplier mixes an odorant with the propane Before starting the boiler, and during to make its presence detectable. In some WARNING ⚠ initial operation, smell near the floor and instances, the odorant can fade, and the around the boiler for gas odorant or any...
  • Page 54 Installation & Operation Manual Start-up Final checks before starting the boiler q Check vent piping and air piping 1. Check for gastight seal at every connection, seam of air q Read the FTXL Service Manual to familiarize yourself with piping, and vent piping. SMART SYSTEM control module operation.
  • Page 55 Installation & Operation Manual Start-up (continued) Figure 10-2 Operating Instructions FOR YOUR SAFETY READ BEFORE OPERATING WARNING: If you do not follow these instructions exactly, a fire or explosion may result causing property damage, personal injury, or loss of life. A.
  • Page 56 Installation & Operation Manual Start-up Check flame and combustion Set space heating operation (continued) 4. Place the boiler into the active position by pressing the Determine controlling sensor RIGHT SELECT [ON] key (FIG. 11-1, page 75). 5. Locate the pinhole button above the RESET button on For space heating systems, the temperature control can be the display board (FIG.
  • Page 57 Installation & Operation Manual Start-up Adjust set point temperature(s) During normal operation, set point temperatures can be adjusted from the Home Screen by pressing the DETAILS button on the bottom of the screen (see FIG. 10-4). To change a set point, use the set point slider feature PLUS MINUS buttons...
  • Page 58 DHW pump output, and raise the system temperature set point to the DHW boiler set Press the SETTINGS button under the Lochinvar logo (see point (if higher). The boiler pump will be turned on. The FIG.
  • Page 59: Operating Information General

    (3) heat/loop demands boiler firing rate. The gas valve senses the amount of air (reference Lochinvar kit 100167843). flowing into the boiler and allows only the right amount of gas to flow.
  • Page 60 Installation & Operation Manual Operating information (continued) Temperature control Programmable controlling sensor Modulation The control module is programmed to use the outlet sensor as the control sensor by default. If a system supply The FTXL is capable of modulating its firing rate from a sensor is connected, the control automatically uses it as minimum of 10% to a maximum of 100%.
  • Page 61 Installation & Operation Manual Operating information Night setback The following integral feature of the boiler control module provides some protection for the boiler only -- not for the system. The controller may be programmed to reduce the space heating and DHW set points during certain times each week. Seven The boiler control module provides a freeze protection feature different start and stop times may be programmed for the space with the following attributes:...
  • Page 62 Installation & Operation Manual Operating information (continued) Monitor external limits High limit operations Connections are provided on the connection board for The FTXL is equipped with adjustable automatic reset and a flow switch and a louver proving switch. The SMART manual reset high limits.
  • Page 63: Cascade

    Installation & Operation Manual Operating information Low water cutoff protection Sequence of the cascade The SMART SYSTEM control module uses temperature To equalize the run time of all boilers on the Cascade, the firing sensing of both supply and return areas of the heat sequence will automatically be changed at set intervals.
  • Page 64: Sequence Of Operation

    Installation & Operation Manual Operating information (continued) Sequence of operation OPERATION 1. Upon a call for heat, the gas pressure switch(es) must be closed. 2. Once the gas pressure switch(es) are closed, the control turns on the appropriate pumps (system and boiler pumps for space heating, DHW pump for DHW).
  • Page 65: Ftxl Control Module

    (i.e. Off, screen. There are five (5) sections located below the Stand-by, Blocking, and Lockout) including: current Lochinvar icon: Home, View, Setup, Information driving demand, the next Hot Water Setback scheduled, (About), and Settings. The Home Section is the screen the reason for any blocking or lockout, and a power button.
  • Page 66: Maintenance Maintenance And Annual Startup

    Installation & Operation Manual Maintenance Maintenance and annual startup Table 12A Service and Maintenance Schedules Owner maintenance Service technician (see the FTXL User’s Information Manual for (see the following pages for instructions) instructions) General: • Check boiler area • Address reported problems Daily •...
  • Page 67 Installation & Operation Manual Maintenance If this boiler may be frozen, immediately shut off power and gas to the appliance and contact the factory ⚠ DANGER for further instructions. Operation when the heat exchanger, internal pipes, or pressure relief valves are frozen, will result in internal pressure build-up and a deadly steam explosion.
  • Page 68 Installation & Operation Manual Maintenance (continued) Flue vent system and air piping Check boiler relief valve Visually inspect the entire flue gas venting system and air 1. Inspect the relief valve and lift the lever to verify flow. piping for blockage, deterioration or leakage. Repair any Before operating any relief valve, ensure that it is piped with joints that show signs of leakage.
  • Page 69 Installation & Operation Manual Maintenance Inspect ignition and flame sense Figure 12-2 Burner Assembly electrodes 1. Remove the ignition and flame sense electrodes from the FAN TOP PLATE boiler heat exchanger access cover. 2. Remove any deposits accumulated on the ignition/flame GASKET sense electrode using sandpaper.
  • Page 70 Installation & Operation Manual Maintenance (continued) Check flame signal 7. Disconnect the condensate hose from the condensate trap and route to drain. 1. At high fire the flame signal shown on the display should be at least 10 microamps. 8. Use a vacuum cleaner to remove any accumulation on the boiler heating surfaces.
  • Page 71: Diagrams

    Installation & Operation Manual Diagrams Figure 13-1 Wiring Diagram LOW VOLTAGE 120 VAC BOX DEPICTS OPTIONAL ITEMS HIGH VOLTAGE CONXUS BOX DEPICTS DUAL SENSOR SINGLE HOUSING RIBBON CABLE INTEGRATED CONNECTION BOARD CONTROL JUNCTION RELAY BOARD PUMP DAMPER FLUE DAMPER X1-3 CN2-4 CN1-5 RELAY...
  • Page 72: Ladder Diagram

    Installation & Operation Manual Diagrams (continued) Figure 13-2 Ladder Diagram JUNCTION BOX 120VAC NEUTRAL TERMINAL STRIP TERMINAL STRIP 120V SUPPLY "L" 120V SUPPLY "N" BLOWER BLOWER GROUND RELAY SYSTEM PUMP ON / OFF SWITCH INTEGRATED CONTROL CONTACTS X1-1 X1-6 3.15A BLOWER SYSTEM RELAY...
  • Page 73 Installation & Operation Manual Notes...
  • Page 74 Installation & Operation Manual Notes...
  • Page 75: Revision Notes

    Revision Notes: Revision A (PCP #3000052596 / CN #500039338) initial release. 100361229_2000617079_Rev A 08/22...

Table of Contents

Save PDF