Sentry Saf-T-Vise STV-LP1 Installation, Operation & Maintenance Manual page 8

Insertable tool holders
Table of Contents

Advertisement

4. Secure holder to process isolation valve connection .
a. Retract the marked rod/shaft completely into the holder and tighten the locking collet bolt to secure the rod/
shaft in the holder .
b. Apply Teflon tape or paste to the process isolation valve/holder connection
c. Secure the holder to the isolation valve .
d. Tighten the locking collet bolt to 35 ft-lb (47 .45 Nm) . This torque will hold a rod/shaft securely up to the design
pressure of the unit .
e. Make sure that the bleeder valve is closed completely .
5. Insert rod/shaft into process .
a. Slowly open the process isolation valve . Check for leaks .
 NOTE
If graphoil seal leaks:
a . Close isolation valve .
b . Slowly open bleeder valve .
c . Loosen set screw that secures upper body to lower body .
d . Tighten upper body onto lower body; re-tighten set screw .
e . Close bleeder valve .
f . Resume installation .
 NOTE (continued)
If Teflon seal leaks:
Close isolation valve, relieve pressure with bleeder valve, and contact your representative or factory customer service .
b. While holding the hand knob firmly, loosen the locking collet bolt .
c. Insert the rod/shaft to the desired depth (use the permanent mark made in step 3 as a reference) .
d. Tighten the locking collet bolt to 35 ft-lb (47 .45 Nm) . This torque will hold a rod/shaft securely up to the design
pressure of the unit .
6. Install safety chain through the chain holder; do not leave any slack in the chain .
8
Sentry Equipment Corp

Advertisement

Table of Contents
loading

This manual is also suitable for:

Saf-t-vise stv-lp2

Table of Contents