Running The Intensive Appli- Ance Care Programme - Bosch WQG24509GR User Manual And Installation Instructions

Table of Contents

Advertisement

en Appliance care
Requirements
¡ The appliance is ready to run the
appliance care programme.
→ "Preparing the appliance for the
appliance care programme ",
Page 34
¡ The appliance care programme
has started.
→ "Starting the appliance care pro-
gramme", Page 36
Press
⁠ .
a "CP2" and the programme duration
alternate on the display.
15.6 Running the intensive
appliance care pro-
gramme
Pull out the condensation con-
1.
tainer horizontally and empty it.
38
Pour a bottle of the original appli-
2.
ance care product
→ "Accessories", Page 29 and ap-
prox. 1 ½ litres of warm tap water
into the condensation container.
Hold the full condensation con-
tainer level so that no liquid spills
out.
Insert the condensation container
3.
so that it locks into place.
Press Έναρξη/Προσθήκη ρούχων.
4.
The appliance care programme
starts and an audible signal
sounds.
After around 3 hours, the appli-
ance pauses the appliance care
programme and the remaining pro-
gramme duration flashes on the
display.

Advertisement

Table of Contents
loading

Table of Contents