Download Print this page

Advertisement

Quick Links

INSTALLATION INSTRUCTIONS
PILLARS OF HERCULES
EC221S & EC221B
NO PART OF THIS MANUAL OR DOCUMENT MAY BE COPIED OR RE-PRODUCED IN ANY FORM OR BY ANY MEANS WITH OUT THE EXPRESS
WRITTEN PERMISSION OF SMP (PLAYGROUNDS) LTD.
- W: smp.co.uk -
T: +44(0)845 260 1655
E: sales@smp.co.uk

Advertisement

loading
Need help?

Need help?

Do you have a question about the EC221S and is the answer not in the manual?

Questions and answers

Summary of Contents for SMP EC221S

  • Page 1 EC221S & EC221B NO PART OF THIS MANUAL OR DOCUMENT MAY BE COPIED OR RE-PRODUCED IN ANY FORM OR BY ANY MEANS WITH OUT THE EXPRESS WRITTEN PERMISSION OF SMP (PLAYGROUNDS) LTD. - W: smp.co.uk - T: +44(0)845 260 1655...
  • Page 2 PILLARS OF HERCULES EC221 Page 2 ISSUE C 12-03-2012...
  • Page 3 PILLARS OF HERCULES EC221 Section 1: x 2= T EC221S 197.00 0.44 2.23 X 0.40 X 2.81 3.00 X 1.00 1.80 m T = 3h EC221B 210.00 0.48 TYPE 1/2/3 101/144 1.80 m 5230 1700R 1500R 1500R 1500R 1500R 1500R...
  • Page 4 PILLARS OF HERCULES EC221 EC221B TYPE 1/2 101/144 1.80 m 1 LTB11 1980 450 x 450 450 x 450 Section 1 Page 4 ISSUE C 12-03-2012...
  • Page 5 PILLARS OF HERCULES EC221 EC221S TYPE 3 101/144 1.80 m 1 LTB11 1980 450 X 450 450 X 450 ISSUE C 12-03-2012 Section 1 Page 5...
  • Page 6 PILLARS OF HERCULES EC221 ITEM EC221S EC221B 70.40 781-006 3910 LTB11 X 2 780-505 2050 RYBL500 18.00 780-593 780-594 0.003 780-595 0.02 803705 7.00 305802 Section 1 Page 6 ISSUE C 12-03-2012...
  • Page 7 PILLARS OF HERCULES EC221 ITEM EC221S EC221B 10231040 0.05 10261000 0.01 10381600 0.007 10321600 0.031 786-904 0.023 782-000 0.05 10051025 0.03 RYADHBK Aro-Seal 1132 Polyurethane Sealant http://www.alansonsuk.com/downloads.asp 10120400 ISSUE C 12-03-2012 Section 1 Page 7...
  • Page 8 PILLARS OF HERCULES EC221 STEP 1 1 LTB11 Section 1 Page 8 ISSUE C 12-03-2012...
  • Page 9 PILLARS OF HERCULES EC221 STEP 2A - EC221B TYPE 1/2 1980 CRS STEP 2B - EC221S TYPE 3 1980 CRS ISSUE C 12-03-2012 Section 1 Page 9...
  • Page 10 PILLARS OF HERCULES EC221 STEP 3         4&5 STEP 4 1 LTB11 Section 1 Page 10 ISSUE C 12-03-2012...
  • Page 11 PILLARS OF HERCULES EC221 STEP 5 Aro-Seal 1132 Polyurethane Sealant Black http:/www.alansonsuk.com/downloads.asp STEP 6 ISSUE C 12-03-2012 Section 1 Page 11...
  • Page 12 PILLARS OF HERCULES EC221 STEP 7 1 LTB11 STEP 8 1 LTB** Section 1 Page 12 ISSUE C 12-03-2012...
  • Page 13 PILLARS OF HERCULES EC221 Appendix A: 5250 2000 2000 1635 2300 2300 TYPE 1/2 LOOSEFILL 5250 2000 2000 1635 2300 2300 TYPE 3 SYNTHETIC ISSUE C 12-03-2012 Appendix A Page 13...
  • Page 14 PILLARS OF HERCULES EC221 2010 1500 6000 TYPE 5 GRASSMATT FR 1260 1500 4500 TYPE 5 GRASSMATT FR - WEAR AREA Appendix A Page 14 ISSUE C 12-03-2012...
  • Page 15: Specifications

    Suitable working platform to provide secure access and provide support for parts required. SPECIFICATIONS SMP Playgrounds Ltd recommends an effective Impact Absorbing Surface tested to EN1177 & BS7188 beneath this play equipment. Refer to manufacturers instructions for details of installation. The surface should have a Critical Fall Height greater than the Maximum Free Fall Height of the equipment.
  • Page 16 PILLARS OF HERCULES EC221 MARK OUT HOLES Consult SMP layout drawing for structure position on site. See page 4 & 5 for concrete foundation sizes. NOTE: This is a minimum guide only. ESTABLISH DATUM LEVEL If a rubber tiled Impact Absorbing surface is to be laid, see separate instructions (base may incorporate up to 2% falls etc).
  • Page 17: Post Installation Inspection

    PILLARS OF HERCULES EC221 Upon the other Upright Post (item 1 - LTB11), remove the BTN Bolt and it’s fixings, connect the Rope (item 2) to the BTN Bolt using 1 off Pivot Bar (item 5) and M5 X 25 Grub Screw (item 6), utilise 2.5mm AF Allen Key ensuring grub screw goes fully into hole of pivot bar to full depth of BTN fitting.
  • Page 18 PILLARS OF HERCULES EC221 Appendix A Page 18 ISSUE C 12-03-2012...

This manual is also suitable for:

Ec221b