Gigabyte R152-Z31 User Manual page 29

Amd epyc™ 7003 up server system - 1u 4-bay
Hide thumbs Also See for R152-Z31:
Table of Contents

Advertisement

6
4
5
4
1
2
7
2
9
3
3
1
8
4
1
2
3
• When installing the heat sink over the CPU, use T30-Lobe driver to tighten the 4 captive nuts in
sequential order (1g2g3g4).
• The screw tightening torque: 8 ± 0.5kgf-cm (17.0± 1.0 lbf-in)
- 29 -
System Hardware Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

R152-z30R152-z32

Table of Contents