International comfort products G9MVE A3 Series Installation Instructions Manual page 40

Variable speed motor, two-stage 35” tall, high efficiency condensing gas furnace
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
Figure 46
Tee at Termination Outlet
ABOVE ANTICIPATED
Sample Inlet Air Pipe Connection
Figure 47
for Polypropylene Venting Systems
EXAMPLE FOR
UPFLOW INSTALLATIONS.
MAY BE APPLIED TO
OTHER CONFIGURATIONS.
40
OPTIONAL TERMINATION
BRACKET FOR 2-PIPE
TERMINATIONS
12 IN. (305 MM) MIN.
SEPARATION BETWEEN
BOTTOM OF COMBUSTION
AIR AND BOTTOM OF VENT.
12-IN. (305 MM)
SNOW LEVEL
A13078A
A12220
Specifications subject to change without notice.
Figure 48
Vent Terminations
OPTIONAL
BRACKET
COUPLING
COMBUSTION-AIR
(ELBOW PARALLEL TO WALL)
EXHAUST
Gas Furnace: (F/G)9MVE
12 IN. (305 MM) MIN. SEPARATION
BETWEEN BOTTOM OF
COMBUSTION AIR AND
BOTTOM OF VENT.
MAINTAIN 12 IN. (305 MM)
CLEARANCE ABOVE
HIGHEST ANTICIPATED
SNOW LEVEL OR GRADE,
WHICHEVER IS GREATER.
A13078B
OVERHANG
CLEARANCE TO OVERHANG PER CODE
12 IN. (305 MM) MIN. GROUND
LEVEL OR ANTICIPATED SNOW LEVEL
A13078C
440 01 4401 02

Advertisement

Table of Contents
loading

This manual is also suitable for:

F9mve a3 series

Table of Contents