ABB HT581466 Operation Manual page 103

Table of Contents

Advertisement

Operation Manual / TPL67-C.. - TPL71-C..
8 Disassembly and assembly / 8.8 Dismantling and fitting nozzle ring
at turbine end
Segment connection
Flange connection
1) If present
© Copyright 2018 . All rights reserved.
Remove screws (61044) and one segment (51012) in the lower section.
u
Fit two guide studs (90320) as a safety measure.
u
Loosen and remove remaining screws (61044) and segments (51012).
u
Remove two screws (61044) in lower section.
u
Fit two guide studs (90320) as a safety measure.
u
Remove remaining screws (61044).
u
Pull gas inlet casing complete with nozzle ring away from gas outlet
u
casing until nozzle ring can be lifted away.
Remove gas inlet casing and put it down.
u
CAUTION
Use suitable underlays when putting down gas inlet casing.
Remove spiral-wound gasket (61050).
u
Assembly
Carefully clean grooves and contact surfaces in / on casing and keep
u
free from metal chips.
Keep grooves and spiral-wound gasket free from oil and grease.
u
HZTL2488_EN
Revision E
August 2018

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tpl67-c34

Table of Contents