Ac Parallel Operation - Honda EU3200i Owner's Manual

Table of Contents

Advertisement

AC PARALLEL OPERATION

Before connecting an appliance to either generator, make sure that the
appliance is in good working order and that its electrical rating does not exceed
that of the receptacle.
Most motorized appliances require more than their electrical rating for startup.
When an electric motor is started, the overload alarm indicator (red) may come
ON. This is normal if the overload alarm indicator (red) goes OFF within 4
seconds. If the Oil Alert/Check indicator (red) blink continuously, consult an
authorized Honda Power Equipment dealer.
During parallel operation, the Eco Throttle switch should be in the same
position on both generators.
1. Connect the parallel cable between the two EU3200i generators following
the instructions supplied with the cable.
2. Start the engines (see page 38) and make sure the output indicator (green) on
each generator comes ON (see page 42).
OPERATION
PARALLEL CABLE
(optional equipment)
45

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents