▶18,24,30kBtu/h class
1. Wait until inverter PCB DC voltage is discharged after main power off.
2. Pull out V, V, W COMP connector.
3. Set multi tester to resistance mode.
4. If the value between P and N terminal of IPM is short(0Ω) or open(hundreds MΩ), PCB needs to be replaced.(IPM damaged)
5. Set the multi tester to diode mode.
6. In case measured value is different from the table, PCB needs to be replaced.(PCB damaged).
P
U
V
W
Nu Nv Nw
27
26
25
24
23 22 21
Copyright ©2017 LG Electronics. Inc. All right reserved.
Only for training and service purposes
P
U
27
26
0.4 ~ 0.6 V
IPM Check Point
33
30
32
29
U1
33
32
30
29
27
Nu
Nv
Nw
U
V
V
W
Nu Nv Nw
25
24
23 22 21
0.4 ~ 0.6 V
- 60 -
Part 5. Trouble Shooting
27
25
26
26
25
P
W
PFC_IPM check
U, V, W ' R S T
LGE Internal Use Only