Connecting The Piping - LG MS05SQ Installation Manual

Hide thumbs Also See for MS05SQ:
Table of Contents

Advertisement

INSTALLATION
12
Bar
Bar
Copper pipe
Clamp handle
Check
1
Compare the flared work with the figure
by.
2
If a flared section is defective, cut it off
and do flaring work again.
Smooth all round
Inside is shiny without scratches
Inclined
Even length
all round

Connecting the Piping

1
Pull the screw cap at the bottom of the in-
door unit
2
Remove the chassis cover from the unit by
loosing 2 screws
Chassis cover
Handle
Yoke
Cone
Red arrow mark
= Improper flaring =
Surface
Cracked Uneven
damaged
thickness
3
Pull back the tubing holder.
4
Remove pipe port cover and positioning
the tubing
Indoor unit back side view
Right
Backwards
* The feature can be changed according to
type of model.
Good case
- Press on the tubing cover and unfold the
tubing to downward slowly. And then bend
to the left side slowly.
Pipe Port
Left
Tubing holder

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ms07sq

Table of Contents