Installation; Overview; Mechanical Drawing - uAvionix AV-20 Installation Manual

Table of Contents

Advertisement

7 Installation

7.1 Overview

Installation consists of the following steps:
Remove / relocate any old instrumentation
Add or locate an appropriate power source / breaker
Wire power and interfaces as needed
Mount the unit to the instrument panel with supplied screws
Apply power and perform setup
Proper mounting orientation is important to ensure performance of the AV-20.
Confirm the unit is oriented level in the roll-axis when installed in the panel.

7.2 Mechanical Drawing

UAV-1003613-001
Rev D
Figure 1 - Mechanical Drawing
10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Av-20-s

Table of Contents