Download Print this page

Waltons 01OVLPA0705SDFW-V1 General Instructions Manual

Advertisement

Quick Links

General Instructions
Overlap
Shiplap
Cladding
Cladding
01OVLPA0705SDFW-V1
7x5 Overlap apex shed with single door, fixed windows, solid sheet floor and roof.
01OVLPA0705SDFW-V1-NW
7x5 Overlap apex shed with single door, no windows, solid sheet floor and roof.
01OSBA0705SDFW-V1
6x4 Shiplap apex shed with single door, fixed windows, solid sheet floor and roof.
01OSBA0705SDFW-V1-NW
7x5 Shiplap apex shed with single door, no windows, solid sheet floor and roof.
01SHPA0705SDOW-V1
7x5 Shiplap apex shed with single door, opening windows, T&G floor and roof.
01SHPA0705SDOW-V1-NW
7x5 Shiplap apex shed with single door, no windows, T&G floor and roof.
Refer to the instructions pages for you speci c product code
14/01/2014
Fixed
Opening
Windows
Windows
Please retain product label and instructions for future reference
N/A
No
Solid Sheet
Floor
Windows
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand
(not supplied) including a Phillips screwdriver, Stanley knife, wood saw,
step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather
conditions. For the duration of heavy or extended periods of rain, swelling of the
wood panels may occur. Warping of the wood may also occur during excessive
dry spells due to an interior moisture loss. Unfortunately, these processes cannot
be avoided but can be helped. It is suggested that the outdoor building is
sprayed with water during extended periods of warm sunshine and sheltered as
much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to
protect the product during transit and for upto 3 months against mould. To
validate your guarantee and ensure longevity of the product, it is ESSENTIAL the
building is treated with a wood preserver within the rst three months of
assembly and thereafter in accordance with the manufactures recommenda-
tions. Care must be taken to ensure the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer
to diagrams for the base dimensions, The base should be slightly smaller than
the external measurement of the building, i.e. The cladding should overlap the
base, creating a run o for water. It is also recommended that the oor be at
least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the
highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot
accept responsibility for your safety whilst erecting or
using this product.
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
T&G Floor
Solid Sheet
Roof
x2
All building's should be erected by two
adults
For ease of assembly, you must pilot
drill all screw holes and ensure all
screw heads are countersunk.
2mm Drill bit
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces
of the timber. You are strongly advised
to wear gloves when working with or
handling rough sawn timer.
For Assistance Please
Contact Customer Care on
01636 880514
**Protim Fentex E5**
Biocidal Product Regulation (EU 528/2012) Article 58 Information
Protim Fentex E2 preserved wood is a "treated article" which incorporates biocidal products.
Wood correctly preserved with Protim Fentex E2 is protected against mould in storage.
Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.
Wear gloves when handling freshly treated wood.
Avoid breathing dust when cutting treated or untreated wood.
Dispose of o -cuts responsibly – do not burn.
www.merciagardenproducts.co.uk
T&G Roof
P 1

Advertisement

loading

Summary of Contents for Waltons 01OVLPA0705SDFW-V1

  • Page 1 Roof Windows BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 01OVLPA0705SDFW-V1 All building’s should be erected by two - Check the pack and make sure you have all the parts listed. 7x5 Overlap apex shed with single door, fixed windows, solid sheet floor and roof.
  • Page 2: Pre-Assembly

    01OSBA0705SDFW-V1 & 01OSBA0705SDFW-V1-NW Please retain product label and instructions for future reference Pre Assembly Overall Dimensions: Length = 2090mm Remove transportation Width = 1606mm blocks from the bottom 01OSBA0705SDFW-V1 Height = 1925mm of each panel before Base Dimensions: beginning assembly. Each Length = 2066mm Panel should have two Width = 1456mm...
  • Page 3 Step 1 Step 3 Fix the corners with 50mm Place the floor on a firm and level base, screws as shown in diagram. ensure the base has suitable drainage free 9x50mm Screws from areas where standing water can collect. See the front page for base requirments. Pre drill hole 50mm...
  • Page 4 Step 5 Step 7 Fix two eaves frames to each roof sheet using 3x30mm screws per eave. Cut the felt into 3 sheets at 2230mm and fix onto the Fix the roof sheets to the roof ensuring roof using felt tacks as they come together at the top using shown in diagram ensur- 40mm screws directly through the roof...
  • Page 5 Step 8 Step 10 Fit the Cover Trims to the front For the no window version go to step 11 Pre drill and back of the building as hole 30mm shown in the illustration using screw 30mm screws. Trim the length 30mm of the cover trims to the Fix the window strips to the two...
  • Page 6: After Treatment

    Step 11 Step 12 Fix the Turn Button onto the door gable using 1x30mm black screw for each one. 2x 30mm Black Screw 30mm screw It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and...

This manual is also suitable for:

01ovlpa0705sdfw-v1-nw01osba0705sdfw-v101osba0705sdfw-v1-nw01shpa0705sdow-v101shpa0705sdow-v1-nw