Samsung AJ035NB1DEH/SA User & Installation Manual page 27

Table of Contents

Advertisement

3 Install the suspension bolts, depending on the ceiling
type.
CAUTION
Make sure that the ceiling is strong enough to support
the weight of the indoor unit. Before hanging the unit,
test the strength of each attached suspension bolt.
If the length of the suspension bolt is more than 1.5 m,
you are required to prevent vibration.
If this is not possible, create an opening on the false
ceiling in order to be able to use it to perform the
required operations on the indoor unit.
4 Screw eight nuts and washers to the suspension bolts,
making space for hanging the indoor unit.
CAUTION
You must install all of the suspension rods.
It is important to leave sufficient space in the false
ceiling to allow access for maintenance or repairs to
the drainage pipe connection, the refrigerant pipe
connection, or to remove the unit if necessary.
5 Hang the indoor unit to the suspension bolts between
two nuts. Screw the nuts to suspend the unit. Cut a
pad stopper and place it on the bracket at this time.
1
6 Check the level of the indoor unit by using a leveler.
Ceiling support
7 Adjust the unit to the appropriate position, taking into
account the installation area for the front panel.
Air outlet side
2
2
A tilt of the indoor unit may cause malfunction of a
built-in float switch and water leaks.
Level
Place the pattern sheet on the indoor unit.
Adjust the space between the ceiling and the
indoor unit by using a dimension gauge.
Fix the indoor unit securely after adjusting the level
of the unit by using a leveller.
Remove the pattern sheet and install the front
panel.
Indoor unit
Jig
Air inlet side
Ceiling
27
English

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aj nb1deh series

Table of Contents