S
4
®
ERIES
GAS
DIRECT VENT
DIRECT VENT
DIRECT VENT
SIDEWALL termination
Part number 550-100-400/0717
-
FIRED WATER BOILER
DIRECT VENT
VERTICAL termination
Install the boiler.
Determine the termination method — sidewall or vertical, concentric or separate pipes, etc.
Determine proper location for wall or roof penetration for each termination.
Install termination assembly as described in this manual.
Install air and vent piping from boiler to termination.
Install pipe supports and brackets as required.
— Boiler Manual
VERTICAL vent and
DIRECT VENT
SIDEWALL air
25