3.8 Pre Commissioning MRXBOX MVHR Units
MRXBOX units are designed to ventilate the whole dwelling and must
not be used during site construction or the clean-up period. Cement
and plaster dust can be abrasive and can affect fan performance
and reliability. Please ensure that the filters are checked prior to
commissioning to ensure there is no build-up of dust or debris.
While the property is drying out, very high moisture levels are likely
to occur. Therefore it is advisable that if the installation and building
works are complete the unit is left running. If the building works are
not complete please close the air valves or cover up the air valves to
prevent condensation forming in the ductwork and the MRXBOX95
unit due to natural migration of warm air.
3.9 Dimensions
11
Dimensions
UNI T WEI GHT = 45Kg
if ancillary distribution box (DB-ECO2) is to be used refer to documentation
supplied with DB-ECO2 as requirements will differ.
144
172 CR S
448
Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk
Ø125.0
Condensate drain
connection (standard
configuration)
Condensate drain connection
on centre line of unit
MRXBOXAB-ECO2B-AE(H)SW
417 CR S
=
=
142
142
70 6
17. 11. 21. Document Number 672002
Condensate drain
connection
(opposite hand
configuration)
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mrxboxab-eco2b-aehsw

Table of Contents