LG LGXXXQ1CK-A5 Installation Manual

LG LGXXXQ1CK-A5 Installation Manual

Pv solar module

Advertisement

Quick Links

Installation manual
PV Solar
MODULE
Please read this manual carefully before operating
your set and retain it for future reference.
N-TYPE MODELS
LGXXXQ1C(K)-A5
www.lgsolarusa.com
MFL69534401 (Rev 01)

Advertisement

Table of Contents
loading

Summary of Contents for LG LGXXXQ1CK-A5

  • Page 1 Installation manual PV Solar MODULE Please read this manual carefully before operating your set and retain it for future reference. N-TYPE MODELS LGXXXQ1C(K)-A5 www.lgsolarusa.com MFL69534401 (Rev 01)
  • Page 2: Table Of Contents

    TABLE OF CONTENTS SAFETY ..............03 BEFORE & AFTER INSTALLATION ......05 Before Installation ................05 After Installation ...................05 ELECTRICAL INSTALLATION .......06 Danger ....................06 Electrical Connections .................06 Diodes ....................06 Series Connection ................06 Parallel Connection ................07 General Wiring..................07 Earth Grounding ..................07 MECHANICAL INSTALLATION ......08 Module Mounting .................08 Site Consideration ................08 Mounting Methods ................08...
  • Page 3: Safety

    SafETY The instructions related to safety and use indicated No electrical parts like cables are in the this installation manual are intended for the located after installation between prevention of unexpected danger, damage, or failure. laminate and mounting structure. DaNgEr WarNINg CaUTION Non-compliance with the instructions may cause product...
  • Page 4 Do not touch the glass surface or Module frame of the solar module after Module Installing structure installation of the module. It may (Stralght type) Installing structure (bent type) result in injury or death. Heavy objects must be kept off of the solar module.
  • Page 5: Before & After Installation

    bEfOrE & afTEr INSTaLLaTION before Installation after Installation • Plug in the connector tightly and ensure that the wiring Please carefully read this manual before installation. properly works. • Solar module installation and maintenance must be performed by qualified and authorized installer. •...
  • Page 6: Electrical Installation

    ELECTrICaL INSTaLLaTION Danger Diodes • Avoid all electrical hazards when installing, wiring, • All LG modules are equipped with factory installed operating and maintaining all panels. bypass diodes. The factory-installed diodes provide proper circuit protection for the systems within the •...
  • Page 7: Parallel Connection

    Installations, Canadian Electrical Code, Part 1. Module General Wiring frame Bolt • LG Electronics recommends that all wiring be double Flat washer insulated with a minimum rating of 90°C (194°F). Star washer • • The minimum size should be determined by the...
  • Page 8: Mechanical Installation

    • The solar module may be mounted by using the Excluded Operating Environments following methods: (*Torque:8~12N∙m) • The solar modules from LG Electronics can not be • LG modules (Fire performance : Type 1) shall be operated in a location where they could come in direct contact with salt water or ammonia.
  • Page 9 • When installing modules in heavy snow areas, it is recommended to be taken an appropriate countermeasure to prevent possible damages to the lower side frame by slipping snow. • We recommend to use corrosion resistant material according to standard UL 1703 or UL2703 for these supporting part.
  • Page 10: Disclaimer Of Liability / Disposal

    Disposal • Please contact us, if you have any queries related to the disposal or recycling of solar modules from LG Electronics. TRANSPORTING AND STORAGE • Do not loosen the banding, when the module is transported by truck, ship and etc.
  • Page 11: Product Specifications

    PRODUCT SPECIFICATIONS N-TYPE Electrical and Mechanical Properties(Rated electrical characteristics are -5 to +5 percent) , Cell temp. 25 ℃ , 1.5AM Standard Test Condition(STC) : Irradiation 1000W/m Electrical Properties Mechanical Properties Max. Max. Module Pmax Power Voc at Isc at Vmpp Impp at Series...
  • Page 12: Dimensions Of Modules

    Dimensions of Modules Unit: mm / in. 60Cell Module Note) Holder is for the convenient connection of junction box cable, but that does not warranty if it is broken after installed.
  • Page 13: Appendix

    C : 120mm(4.7in) 1 ± 6point(①+②) Rear : 1800Pa(37.5psf) Rear : 5400Pa(113psf) (32.5±3.9 in) Note) All mechanical installation method(Fig.1 to Fig.6) in this appendix were not tested by UL. (UL 1703, ULC 1703) It is evaluated by LG internal test.
  • Page 14 These alternative grounding devices indicated on this page has been evaluated and approved by LG, not by UL. If such devices want to be used to meet the requirement in UL 1703, some adequate tests shall be conducted in accordance with UL1703 additionally.
  • Page 15 1000 Sylvan Ave, Englewood Cliffs, NJ 07632 Contact : lg.solar@lge.com http://www.lgsolarusa.com This document is subject to change without notice. LG, LG logo and Life's Good are trademarks of LG Electronics, Inc. worldwide. Trademarks and intellectual properties of LG Electronics, Inc. are protected by international copyright laws.

Table of Contents