Moso ST10KTL User Manual

Solar on-grid inverter
Table of Contents

Advertisement

Quick Links

光伏并网逆变器
ST10KTL/ST12KTL/ST15KTL/ST17KTL/ST20KTL
用户手册
版本号 V2.0

Advertisement

Chapters

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ST10KTL and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Moso ST10KTL

  • Page 1 光伏并网逆变器 ST10KTL/ST12KTL/ST15KTL/ST17KTL/ST20KTL 用户手册 版本号 V2.0...
  • Page 2 版权声明 本手册的版权属于茂硕电源科技股份有限公司 (之后简称为“茂 硕电源”)。 任何单位或者个人不允许复制或部分复制(包括电子版本等 等)本手册的内容,且不允许以任何形式或手段转制和分发。 茂硕电源保 留所有权利,且拥有最终的解释权。所有相关信息有可能会被修改,但 不会另行通知,敬请谅解。...
  • Page 3: Table Of Contents

    光伏并网逆变器 目录 目录 1 关于本手册 ............................1 1.1 适用性 .............................. 1 1.2 使用对象 ............................1 1.3 安全 ..............................1 1.3.1 运用 ............................1 1.3.2 安全说明 ........................... 2 1.3.3 符号标识示意解析 ........................3 2 简介 ..............................
  • Page 4 光伏并网逆变器 8.3 连接 PV 组件 ..........................23 8.3.1 直流接线注意事项 ......................... 23 8.3.2 直流连接器组装 ........................24 8.3.3 连接 PV 组件 .......................... 27 8.4 连接交流电网 ..........................29 8.4.1 连接电网条件 ......................... 29 8.4.2 电网连接步骤 ......................... 30 9 操作...
  • Page 5: 关于本手册

    光伏并网逆变器 1 关于本手册 不正确的操作可能造成电击或燃烧等危险。 本手册主要介绍了逆变 不正确的操作可能造成电击或燃烧等危险。 本手册主要介绍了逆变 器的产品信息、安装、操作及维护指引。请在安装前仔细阅读本手册, 器的产品信息、安装、操作及维护指引。请在安装前仔细阅读本手册, 并将手册妥善保存方便日后查阅。 并将手册妥善保存方便日后查阅。 1.1 适用性 本手册适用以下逆变器型号: ST10 10KTL / ST12KTL / ST15KTL / ST17KTL / ST20KTL。 1.2 使用对象 本手册适用于安装、操作和维护逆变器的专业技术人员,以及需要 本手册适用于安装、操作和维护逆变器的专业技术人员,以及需要 查看逆变器信息的终端用户。 1.3 安全 1.3.1 运用 ST10-20KTL 是三相组串型光伏并网逆变器, 是三相组串型光伏并网逆变器,主要功能是将光伏组 件产生的直流电转换成交流电并馈入电网。 件产生的直流电转换成交流电并馈入电网。 A:光伏组串;B:ST10~20KTL; ;C:交流配电单元;D:低压电网 图...
  • Page 6: 安全说明

    光伏并网逆变器 1.3.2 安全说明 电击危险!  所有涉及到本逆变器的安装、 调试、 维修等工作都需要经过 所有涉及到本逆变器的安装、 调试、 维修等工作都需要经过 培训且合格的专业人员(后简称“专业人员” )来完成。 合格的专业人员(后简称“专业人员” )来完成。  本逆变器禁止儿童、 行为能力有限或者有精神障碍的人操作 本逆变器禁止儿童、 行为能力有限或者有精神障碍的人操作 使用, 缺乏相关操作经验和常识的人应当在专业人员指导的 使用, 缺乏相关操作经验和常识的人应当在专业人员指导的 情况下使用和操作本逆变器。 情况下使用和操作本逆变器。 有可能接触到本逆变器的儿童应当被叮嘱并监督其不要靠 有可能接触到本逆变器的儿童应当被叮嘱并监督其不要靠  近本逆变器,更不能把本逆变器当做玩具 近本逆变器,更不能把本逆变器当做玩具,以免发生危险。 高温危险!  逆变器机壳底座温度较高,在逆变器工作时请避免与其底 逆变器机壳底座温度较高,在逆变器工作时请避免与其底 座接触,否则可能造成烫伤。 座接触,否则可能造成烫伤。 注意!  请勿将光伏组串的正负极接地,否则将导致逆变器受到严 请勿将光伏组串的正负极接地,否则将导致逆变器受到严...
  • Page 7: 符号标识示意解析

    光伏并网逆变器 警告! • 请用户确保 DC 输入端的 输入端的光伏组件开路电压不能超过机器的最 大直流输入电压; • DC 端过压有可能对本逆变器造成永久性的伤害以及其他不能 端过压有可能对本逆变器造成永久性的伤害以及其他不能 预见的损失,DC 端过压造成的逆变器问题不属于本 端过压造成的逆变器问题不属于本逆变器的质 保范围! 警告! • 经培训的维修人员对本逆变器进行任 经培训的维修人员对本逆变器进行任何的维护或清洁工作前, 务必要将直流开关断开 开关断开和断开输出侧的交流断路器。 警告! • 暴露在太阳光下的光伏组件会产生直流电压,在安装时 暴露在太阳光下的光伏组件会产生直流电压,在安装时 要特别注意、以免触电。 要特别注意、以免触电。 1.3.3 符号标识示意解析 • 逆变器机体上的符号标识 符号标识 电击危险!  断开逆变器输入输出后, 残留在逆变器 断开逆变器输入输出后, 残留在逆变器的储能电容中的能量 仍可能造成人员触电。断开输入输出开关 5 分钟后,方可 仍可能造成人员触电。断开输入输出开关...
  • Page 8 光伏并网逆变器 高温危险!  逆变器表面温度较高 逆变器表面温度较高,为了避免灼伤的风险,当逆变器运行 时,请不要接触逆变器表面。另外 时,请不要接触逆变器表面。另外,请将逆变器安装在儿童 不能触碰的地方。 不能触碰的地方。 电击危险!  存在电击危险! 禁止拆卸外壳! 请具备服务资质的电工进行 存在电击危险! 禁止拆卸外壳! 请具备服务资质的电工进行 检修。 电击危险!  光伏组件暴露在阳光下时,其输出端会产生直流电压。 光伏组件暴露在阳光下时,其输出端会产生直流电压。 要求用户安装前阅读用户手册、 并按照手册 要求用户安装前阅读用户手册、 并按照手册中的要求来操作逆变 器。 警示提示符号。 接地标志。 交流电压符号。 可回收及循环利用。...
  • Page 9 光伏并网逆变器 • 打印标签上的符号标志 符号标志 解释 CE 认证标识。 本逆变器符合 CE CE 认证相关的各项要求和标准。  TUV 认证标识。  本逆变器符合 TUV TUV 认证相关的各项要求和标准。 CQC 认证标识。  本逆变器符合 CQC CQC 认证相关的各项要求和标准。...
  • Page 10: 示意图

    光伏并网逆变器 2 简介 2.1 示意图 本图只做参考,以实际收到的产品实物为准。 本图只做参考,以实际收到的产品实物为准。 图 2 2 外形图 2.2 电气框图 • 电气框图...
  • Page 11: 产品描述

    光伏并网逆变器 图 3 3 电气框图 2.3 产品描述 图 4 序号 名称 描述 逆变器安装的有一个直流开关, 用户可以通 逆变器安装的有一个直流开关, 用户可以通 直流开关 过直流开关安全的断开光伏 过直流开关安全的断开光伏组件与逆变器 之间的连接。 之间的连接。 逆变器具有两路独立的 逆变器具有两路独立的 MPPT, PV1 和 PV2, 直流端子 每路 每路 MPPT 含有两组直流输入端子。 WiFi/GPRS 连接 连接 WiFi 模块或者 GPRS 模块的通讯接口。 RS485 连接...
  • Page 12: 尺寸和重量

    光伏并网逆变器 交流端子 交流接线端子 交流接线端子。 显示屏会显示逆变器运行的数据 显示屏会显示逆变器运行的数据和故障信 息。 息。 2.4 尺寸和重量 · 尺寸 图9: ST10KTL/ST12KTL/ L/ST15KTL/ST17KTL/ST20KTL · 重量 表格 1 表格 ST10KTL ST12KTL ST15KTL ST17KTL ST20KTL 型号 38.5kg 38.5kg 40.8kg 40.8kg 40.8kg 重量...
  • Page 13: 包装清单

    光伏并网逆变器 3 包装清单 表格 2 表格 项目 名称 名称 数量 光伏逆变器 光伏逆变器 挂板 挂板 膨胀螺钉螺母 膨胀螺钉螺母 直流连接器 直流连接器 膨胀螺钉 膨胀螺钉 RS485 连接器 连接器 用户手册 用户手册 以下物品出运:...
  • Page 14 光伏并网逆变器 逆变器 用户手册 图 6...
  • Page 15: 技术参数

    光伏并网逆变器 4 技术参数 4.1 输入(直流) 表格 3 表格 Model ST10KTL ST12 ST12KTL ST15KTL ST17KTL ST20KTL 最大直流输入功 15000 18000 22500 25500 30000 率 [W] 最大直流输入电 1100 1100 1100 1100 1100 压 [Vdc] 额定电压 [Vdc] 满载 MPPT 电压 200-950 200-950 200-950 200-950 200-950 范围...
  • Page 16: 逆变效率、安全及防护等级

    光伏并网逆变器 Model ST10KTL ST12 ST12KTL ST15KTL ST17KTL ST20KTL 电网频率 50/60 50/60 50/60 50/60 50/60 50/60 [Hz] 最大输出电流 功率因数 0.8 超前-0.8 滞后 [cosφ] 电流畸变率(额 <3% <3% <3% <3% <3% <3% 定功率) 4.3 逆变效率、安全及防护等级 逆变效率、安全及防护等级 表格 5 表格 Model ST10KTL ST12 ST12KTL...
  • Page 17: 一般数据

    光伏并网逆变器 4.4 一般数据 表格 6 表格 Model ST10KTL ST12 ST12KTL ST15KTL ST17KTL ST20KTL 尺寸(W/H/D) 540/660/180 [mm] 重量 [kg] 40.5kg 40.5kg 40.5kg 40.5kg 40.5kg 工作温度范围 -25℃~+60℃ [°C] 防护等级(IEC- IP65 60529) 气候类别(IEC 4K4H 60721-3-4) 夜间功率消耗 <1W 散热方式 风冷 LED+LCD 显示 0-100%, 无冷凝...
  • Page 18 光伏并网逆变器 5 功能 逆变器的功能可归纳如下: 【逆变功能】 逆变器将直流转换为与所安装地区电网要求一致的交流电, 并将其馈入电网。 逆变器将直流转换为与所安装地区电网要求一致的交流电, 并将其馈入电网。 【数据存储】 逆变器存储了运行信息、故障记录等系统信息。 逆变器存储了运行信息、故障记录等系统信息。 【参数配置】 逆变器提供了多种参数配置,以符合各种需求或将其运行性能调整至最佳。 逆变器提供了多种参数配置,以符合各种需求或将其运行性能调整至最佳。 【通讯接口】 可连接 RS485 或者 WiFi / GPRS 数据采集模块, 实现通讯功能, 将监控设备 数据采集模块, 实现通讯功能, 将监控设备 与整个光伏系统相连接。 【保护功能】 逆变器具备短路保护、绝缘电阻接地检测、剩余电流保护、防孤 逆变器具备短路保护、绝缘电阻接地检测、剩余电流保护、防孤岛保护、直 流过压/过流保护等保护功能。...
  • Page 19: 工作模式

    光伏并网逆变器 6. 工作模式 图 7 注意! 温度保护下,逆变器功率下降属正常现象; 温度保护下,逆变器功率下降属正常现象; 但如果此现象 经常产生,请检查逆变器的散热器‘是否积累灰尘’和风 经常产生,请检查逆变器的散热器‘是否积累灰尘’和风 扇‘是否堵转动’ ,或考虑将逆变器置于通风较好处;若此输出功率下 扇‘是否堵转动’ ,或考虑将逆变器置于通风较好处;若此输出功率下 降是由电气问题造成,请联系专业人员协助。 降是由电气问题造成,请联系专业人员协助。...
  • Page 20: 安全指引

    光伏并网逆变器 7 安装 7.1 安全指引 危险! 错误的安装,易引起火灾或爆炸而危及生命。 错误的安装,易引起火灾或爆炸而危及生命。 ·请勿将逆变器安装在易燃易爆的物品上; ·请勿将逆变器安装在易燃易爆的物品上; ·安装逆变器之前,务必确保逆变器无任何电气连接。 ·安装逆变器之前,务必确保逆变器无任何电气连接。 小心! 不当的搬运操作可能导致人员受 不当的搬运操作可能导致人员受伤。 ·在移动和运输逆变器时注意逆变器的重量; 在移动和运输逆变器时注意逆变器的重量; ·选择一个牢固的安装面,最好是牢固的石墙或木墙; 选择一个牢固的安装面,最好是牢固的石墙或木墙; ·安装逆变器时请使用合适的工具; 安装逆变器时请使用合适的工具; ·至少需要两人来共同完成逆变器的安装。 至少需要两人来共同完成逆变器的安装。 警告! 小心烫伤。 ·逆变器在运行时部分部件可能会发热,请小心操作,以 逆变器在运行时部分部件可能会发热,请小心操作,以 免烫伤。 · 拆包 请小心将逆变器从包装箱中移出并对着包装清单仔细检查机身和 请小心将逆变器从包装箱中移出并对着包装清单仔细检查机身和 附件盒,如有发现损坏或者缺失部分部件,请及时联系当地的分销商 附件盒,如有发现损坏或者缺失部分部件,请及时联系当地的分销商。...
  • Page 21: 选择安装地点

    光伏并网逆变器 7.2 选择安装地点 · 安装方法及安装位置必须与本逆变器重量和尺寸相适应。请选择可 安装方法及安装位置必须与本逆变器重量和尺寸相适应。请选择可 承受本逆变器的墙面或固体垂直面。 承受本逆变器的墙面或固体垂直面。 · 使用的环境温度不能超出本机器工作温度范围( 本机器工作温度范围(-25°C 至+60°C; 45°C 至+60°C 降额使用) ; · 安装位置海拔不要超过 2000 米,否则逆变器会降额输出; 米,否则逆变器会降额输出; · 请勿安装在有腐蚀性气体、液体(海水)浸蚀的地方; 请勿安装在有腐蚀性气体、液体(海水)浸蚀的地方; · 请勿安装在有可能被洪水或冰冻损坏的地带; 被洪水或冰冻损坏的地带; · 请勿安装在密闭空间或高湿度 或高湿度的地方; · 请勿是机器暴露于强冷空气、 强冷空气、蒸汽、烟雾或水中; · 请勿安装在靠近电视天线或天线电缆 靠近电视天线或天线电缆的地方。 垂直安装或后倾最大角度 15°(参照图 11) 。 ·...
  • Page 22: 安装前准备

    光伏并网逆变器 7.3 安装前准备 请准备以下安装工具: 图 9 9 安装工具 7.4 安装板 本逆变器需适当的散热空间。 请 本逆变器需适当的散热空间。 请安装在较为开阔且通风良好的地方: 图 10 0 散热空间...
  • Page 23 光伏并网逆变器 用安装板预定好 4 个钻孔位置,在预定位置 个钻孔位置,在预定位置处钻孔(用直径 8mm 的钻头、钻 40-45mm 的深度) ,接着塞进膨胀螺栓,请保留膨胀螺栓的 的深度) ,接着塞进膨胀螺栓,请保留膨胀螺栓的 螺牙端 8-10mm 在外。如下图: 图 11 墙面钻孔 然后按以下图示安装安装板、并旋紧膨胀螺栓螺母。 安装板、并旋紧膨胀螺栓螺母。 图 12 安装板安装...
  • Page 24: 安装逆变器机身

    光伏并网逆变器 7.5 安装逆变器机身 将逆变器机身扣挂在已安装好的安装板上: 挂在已安装好的安装板上: 图 13 安装逆变器机身 安装逆变器机身 逆变器两侧必须正确地卡在卡槽上 逆变器两侧必须正确地卡在卡槽上,如下图: 图 14 逆变器两侧卡在卡槽上 逆变器两侧卡在卡槽上...
  • Page 25: 检查安装状态

    光伏并网逆变器 7.6 检查安装状态 · 检查后上方卡扣是否扣紧在安装板上; 检查后上方卡扣是否扣紧在安装板上; · 试着将逆变器机身向左右晃动 左右晃动,以确认逆变器是否固定牢靠; · 请确保 LCD 显示屏可清楚被看到; 显示屏可清楚被看到; · 防止逆变器在工作的时候震动,请选择牢固的墙面或其他固体面。 防止逆变器在工作的时候震动,请选择牢固的墙面或其他固体面。...
  • Page 26: 电气连接

    光伏并网逆变器 8 电气连接 8.1 安全 注意! ·机器内部有静电敏感性器件,请避免无保护的方式接触 机器内部有静电敏感性器件,请避免无保护的方式接触 机器内部; ·请在接触内部任何器件前确保自身 请在接触内部任何器件前确保自身的可靠接地。 8.2 接线区域 图 15 5 接线区域 表 7 接线区域信息列表 接线区域信息列表 项目 描述 直流开关 光伏组件连接器 RS485 通讯端口 WIFI 或者 GPRS 通讯端口 通讯端口 透气阀 交流接线端子...
  • Page 27: 连接 Pv 组件

    光伏并网逆变器 透气阀 8.3 连接 PV 组件 8.3.1 直流接线注意事项 逆变器有两路独立的 MPPT:‘ ‘PV1’和‘PV2’ ,每路 MPPT 有两 路输入,共四路光伏输入端子。 · 每路 MPPT 对其接入组件有如下要求: 对其接入组件有如下要求: --同样的型号 --每串同样的数量 --同样的排列 --同样的倾角 图 16 光伏组件的连接 光伏组件的连接 · 光伏组件连接到逆变器时,其 到逆变器时,其线缆必须使用逆变器包装附件盒中的...
  • Page 28: 直流连接器组装

    光伏并网逆变器 直流连接端子。 · 逆变器出厂自带一个直流断路开关,安装时推荐外接一个直流断路 逆变器出厂自带一个直流断路开关,安装时推荐外接一个直流断路 器。 在逆变器安装时,如下条件不能被超越: 在逆变器安装时,如下条件不能被超越: 最大直流输入电压 每路MPP最大直流输入电流 1,100 V (DC) 22 A (DC) 直流输入不能混接 ·例如,一串组件的正极连接到‘ 例如,一串组件的正极连接到‘PV1’,而负极连接到‘PV2’,这 种情况就叫做混接。 ·只能讲一组组件连接到一个 MPPT MPPT 上面,而不能同时连接到两路 MPPT 区域。 8.3.2 直流连接器组装 逆变器提供专业的具有 IP68 IP68 防护等级的直流连接器,安装时需要 参考图 20 到图 26 来组装连接器。 来组装连接器。 注意事项: · 直流连接器的组装和操作需在专业人员或专业人员的指导下进行 直流连接器的组装和操作需在专业人员或专业人员的指导下进行;...
  • Page 29 光伏并网逆变器 负两极连接至逆变器的正负两极,注意光伏电池板的正极连接 MC4 的 负两极连接至逆变器的正负两极,注意光伏电池板的正极连接 母连接器,负极连接 MC4 的公连接器 的公连接器。 图 17 连接顺序: 1. 断开直流开关,确保它不会在不经意的情况下被重新打开 断开直流开关,确保它不会在不经意的情况下被重新打开 2. 剥开7毫米电缆: 图 图 18 3. 将剥开的电缆插入金属芯, 并确保所有的导体铜线被插入连接孔内 并确保所有的导体铜线被插入连接孔内。 4. 使用压线钳,压接接触孔;将接触孔和线缆放进相应的压接口,压 使用压线钳,压接接触孔;将接触孔和线缆放进相应的压接口,压 紧连接处。 图 图 19 5. 将组装的连接电线插入公连接器和母连接器背部,如组装的电线安 将组装的连接电线插入公连接器和母连接器背部,如组装的电线安 装正确,应该能听到或感到“卡塔”的一声 装正确,应该能听到或感到“卡塔”的一声。...
  • Page 30 光伏并网逆变器 图 图 20 6. 用2.6~2.9NM的转矩拧紧胶套。 的转矩拧紧胶套。 图 图 21 7. 当拧紧后,将光伏组件的正负极连接头连接至逆变器的对应接口并 当拧紧后,将光伏组件的正负极连接头连接至逆变器的对应接口并 插紧,直到听到或感到“卡塔”的一声 插紧,直到听到或感到“卡塔”的一声。 图 22 8. 如果要分开连接器,请使用专门的扳手工具分开他们。 如果要分开连接器,请使用专门的扳手工具分开他们。 图 23...
  • Page 31: 连接 Pv 组件

    光伏并网逆变器 8.3.3 连接 PV 组件 危险! 逆变器内部高压会危及生命。 危及生命。 ·在连接 PV 组件之前, 组件之前,请确保交流侧三相断路器已经断 开,并且不会被闭合 闭合。 注意! 过电压会损坏万用表等测试工具 过电压会损坏万用表等测试工具 • 请用最大耐压高于 请用最大耐压高于1100Vdc的测量工具(如万用表)去 测试逆变器的输入电压。 测试逆变器的输入电压。 • 直流连接器不能在带电 直流连接器不能在带电的情况下操作,为了避免电击, 请在组装和拆分连接器时,先断开直流开关 请在组装和拆分连接器时,先断开直流开关; • 将逆变器的直流开关切换到‘ 直流开关切换到‘OFF’档后再进行直流操 作(参见图 25)。 图24 直流断路开关处于‘ 直流断路开关处于‘OFF’...
  • Page 32 光伏并网逆变器 连接步骤: · . 检查光伏组件连接器极性是否正确并用万用表确认组件开路电压 器极性是否正确并用万用表确认组件开路电压 低于逆变器最大允许输入电压; 图25 测量PV PV组件开路电压 · .检查PV组件是否存在直流接地, 具体描述请参见章节 ‘ 组件是否存在直流接地, 具体描述请参见章节 ‘1.3.2 注意’ ; · .确认PV组件极性与逆变器连接器匹配,并将它们可靠连接。 组件极性与逆变器连接器匹配,并将它们可靠连接。 图26 PV组件与逆变器连接 组件与逆变器连接 · .为了保证逆变器IP65的防护等级,所有的直流输入连接器必须连接 的防护等级,所有的直流输入连接器必须连接 光伏组件连接器或者使用密封盖盖住 光伏组件连接器或者使用密封盖盖住; · .确认所有连接器连接到位。 PV 连接器达到 IP68 IP68 防护等级,但不能长期使其与水接触...
  • Page 33: 连接交流电网

    光伏并网逆变器 (如置于水下或水面) 8.4 连接交流电网 8.4.1 连接电网条件 在将逆变器接入电网前,请先与当地电网运营商接洽好。 在将逆变器接入电网前,请先与当地电网运营商接洽好。 线材要求: 表 8 线材和微断路器规格 线材和微断路器规格 ST10KTL ST12KTL ST15KTL ST17KTL ST20KTL 型号 线缆 ≥4mm ≥4mm ≥6mm ≥6mm ≥6mm (铜) 微断路 器 · .请使用多芯电缆。电缆总外径 请使用多芯电缆。电缆总外径 14-25mm; · .电缆每根导线截面积参见表 8 8 要求; · .剥线长度:10-12mm; · .选择输出电缆时请参照表 8 来选择,请在允许范围内尽可能使用截...
  • Page 34: 电网连接步骤

    光伏并网逆变器 危险! 可危及生命的火灾 可危及生命的火灾. • 当多个逆变器同时接在同一个断路器上, 断路器的保 当多个逆变器同时接在同一个断路器上, 断路器的保 护功能将不能得到保障,且易引起线缆起火或者逆变器损坏; 护功能将不能得到保障,且易引起线缆起火或者逆变器损坏; • 请勿将多个逆变器连接到同一断路器上; 请勿将多个逆变器连接到同一断路器上; 请根据逆变器输出最大电流来选择断路器,一般选用额定电流为 1.5 • 请根据逆变器输出最大电流来选择断路器,一般选用额 倍逆变器输出最大电路断路器为宜。 倍逆变器输出最大电路断路器为宜。 危险! 可危及生命的火灾 可危及生命的火灾 • 当逆变器与负载通过同一断路器和电网连接, 断路器 当逆变器与负载通过同一断路器和电网连接, 断路器 不能有效保护逆变器和负载,如果发生负载短路,逆变器流入负载的电 不能有效保护逆变器和负载,如果发生负载短路,逆变器流入负载的电 流将不能被断路器所检测,断路器就不能起到保护的作用; 流将不能被断路器所检测,断路器就不能起到保护的作用; • 请勿将负载连接到逆变器和断路器之间而不加熔断器; 请勿将负载连接到逆变器和断路器之间而不加熔断器; • 每个负载需要单独加熔断器保护,不能共用。 每个负载需要单独加熔断器保护,不能共用。. 注意! 使用螺旋式熔断器作为负载断开装置可能损坏逆变器 使用螺旋式熔断器作为负载断开装置可能损坏逆变器...
  • Page 35 光伏并网逆变器 • 断开电网侧三相微型断路器并确认其不会被合上; 断开电网侧三相微型断路器并确认其不会被合上; 卸掉交流输出端防护罩四个螺钉(参见图 28) ; • 卸掉交流输出端防护罩四个螺钉(参见图 图 27 拆除交流防护盖 拆除交流防护盖 松开交流接线端子上的螺钉(参见图 29) ; • 松开交流接线端子上的螺钉(参见图 图 28 松开锁线螺钉 图 20 锁线过程 • 将五芯电缆从外迫式固定头外侧插入并将对应的线缆锁紧到接线端 外迫式固定头外侧插入并将对应的线缆锁紧到接线端 子上(参见图 29) ,确认线缆未被接错; ) ,确认线缆未被接错; • 将交流输出防护罩锁回交流输出端, 并将外迫式固定头锁紧五芯电缆 将交流输出防护罩锁回交流输出端, 并将外迫式固定头锁紧五芯电缆 以达到防水效果(参见图 30) 。...
  • Page 36 光伏并网逆变器 图 30 锁紧五芯电缆 锁紧五芯电缆...
  • Page 37: Led 显示灯

    光伏并网逆变器 9 操作 9.1 LED 显示灯 如下图所示,面板上有三个 LED LED 指示灯: 图 31 31 面板显示 9.1.1 LED1-绿 表 9 无直流输入 闪烁 待机状态...
  • Page 38: Dc/Ac 状态 Led2 (绿)

    光伏并网逆变器 MPPT 工作中 9.1.2 LED2-绿 表 表 10 逆变器不工作 闪烁 逆变器自检中 逆变器并网工作中 9.1.3 LED3-红 表 表 11 没有故障发生 发生故障 机器开始运行后, DC/DC LED 和 DC/AC LED 会被 一般情况下, 机器开始运行后 点亮,指示逆变器处于馈电状态。 。 9.2 显示器 LCD 显示器监视逆变器的状态和收集统计数据, 以评估系统的性能 的状态和收集统计数据, 以评估系统的性能。 本机器设计了六个按键, 可以通过按键控制 LCD 进而控制逆变器。 本机器设计了六个按键,...
  • Page 39: 系统页面

    光伏并网逆变器 显示功能概要图如下图所示, 通过左右键或敲击 LCD 会显示下一 显示功能概要图如下图所示, 个页面: 图 33 LCD LCD 界面简要描述 9.2.1 系统页面 系统 2013-02-20 18:18:18 Today 功率 88.44 今天 6688.8 总量 20 h 状态: 等待 事件: 警告 按左右键或敲击面板进行换页 按左右键或敲击面板进行换页。 图 34 图 功率:当前并网功率; 今天: 截止到当前时刻的当日 当日总发电量,每十分钟更新一次; 总量: 逆变器安装后输出至电网的总能量,并 输出至电网的总能量,并十分钟更新一次。...
  • Page 40: 信息页面

    光伏并网逆变器 9.2.2 信息页面 -1/1 信息 2013-02-20 18:18:18 状态: 等待 当前事件: 1.[F13] 通信失败 按上下键查看更多。 图 35 图 系统状态是通过消息页面来显示 来显示的; 第一行显示逆变器的操作模式: 等待模式,自检模式,并网模式,故障模式。 模式,故障模式。 下面显示详细的当前发生的事件。 显示详细的当前发生的事件。 从第二行开始是 LCD 显示警告与故障信息。故障信息如下: 显示警告与故障信息。故障信息如下: 表 12 表 故障代号 代号描述 电网异常 PV1 过压 PV2 过压 输入欠压 内部通讯异常 ARM 故障 故障代号...
  • Page 41 光伏并网逆变器 过温 PV1 绝缘故障 PV2 绝缘故障 绝缘电源故障 母线欠压 母线不平衡 母线过压 输出过流 Boost 过流 输出直流分量过高 剩余电流异常 接线错误 相序反 内部 AD 故障 继电器短路 继电器开路 监控 ARM 通讯异常 风扇失效...
  • Page 42: 通讯设置

    光伏并网逆变器 10 通讯设置 10.1 通讯端口类型 本产品提供标准的 RS485 通讯端口,同时也可 通讯端口,同时也可选 Wifi 通讯方式。 各类系统运行数据,如输出电压、电流、频率、故障信息等等,都可以 各类系统运行数据,如输出电压、电流、频率、故障信息等等,都可以 通过通讯端口传输至相应的监控设备。 端口传输至相应的监控设备。 10.2 通讯方式 10.2.1 RS485 光伏并网逆变器提供了标准的 RS485 接口,当用户需要了解整个 光伏并网逆变器提供了标准的 光伏系统的运行状况以及实时操作整个系统的时候, 光伏系统的运行状况以及实时操作整个系统的时候, 可以通过下面的 RS485 通讯方式来解决: · RS485 通讯(适用于 1 台或多台逆变器) 台或多台逆变器) RS485 通常用于一组多台逆变器的通讯,最多可以同时容纳 通常用于一组多台逆变器的通讯,最多可以同时容纳 32 台 设备。通讯线缆的长度不应超过 1200m 1200m。...
  • Page 43 光伏并网逆变器 图 36 RS485 RS485 通讯端口 图 37 8 线 RJ45 表 13 8 线 RJ45 8 线 RJ45 线编号. 功能 功能 颜色 橙白 橙 绿白 蓝 蓝白 绿 棕白 棕 · RS485 与 Webbox 的连接方法 法 逆变器之间直接使用通讯线缆连接, 但逆变器与 Webbox 之间需要 逆变器之间直接使用通讯线缆连接,...
  • Page 44: 内置 Wifi (可选)

    光伏并网逆变器 图 38 Webbox Webbox 监控示意图 · 将上述系统通过 RS485/USB RS485/USB 转换接头接到 PC 上 图39 RS485 39 RS485装换连接PC 10.2.2 内置 Wifi (可选) · Wifi 通讯 逆变器提供可选的 WiFi 的通讯方式,如果你向 的通讯方式,如果你向茂硕电源公司订购 的是带 WiFi 通讯的逆变器,那么, 通讯的逆变器,那么,WiFi 模块在出厂时就已经安装在机 器上,请参见下图:...
  • Page 45 光伏并网逆变器 图40 内置Wifi Wifi的使用方法请参看 的使用方法请参看Wifi模块的使用手册! · Wifi 与逆变器连接 图41 Wifi 41 Wifi监控模式...
  • Page 46: 故障检测

    光伏并网逆变器 11 故障检测 在大多数情况下,本逆变器是不需要单独进行维护的。但是,如果 在大多数情况下,本逆变器是不需要单独进行维护的。但是,如果 机器不能够完美地正常工作, 请遵照以下指引做出充分的判断后再联系 机器不能够完美地正常工作, 请遵照以下指引做出充分的判断后再联系 您所在的地区经销商或者授权的维修中心。如果有任何故障出现,本机 您所在的地区经销商或者授权的维修中心。如果有任何故障出现,本机 器操作面板上的 LED 指示灯会变红, 指示灯会变红, LCD 界面也会有显示相应的信息, 请参考下表中可能出现的问题和解决方法。 请参考下表中可能出现的问题和解决方法。 表 14 故障及检测列表 故障及检测列表 故障内容 可能原因和解决方案 · 停止操作再等一分钟, 电网可能 会恢复到正常状态。 · 请用户确认电网电压和频率是符 合本逆变器所指定的并网条件。 · 如无法恢复, 请向我们寻求帮助。 电网侧故障 · 将机器与电网断开。 · 检查并网连接处, 比如线缆接口 等等。...
  • Page 47 光伏并网逆变器 的最大的直流输入电压,请向我们 寻求帮助。 · 断开逆变器直流开关, 然后再重 新合上。 输出直流分量过大 · 检查输出线是否有误接。 · 如无法解决, 请向我们寻求帮助。 · 断开逆变器直流开关, 然后再重 新合上。 继电器故障 · 如无法回复到正常状态, 请向我 们寻求帮助。 · 查看操作界面上的警示和故障信息并记录下来以供后续参考。 查看操作界面上的警示和故障信息并记录下来以供后续参考。 · 请尝试表格 14 中所示的解决方案。 中所示的解决方案。 · 如果本逆变器的操作面板上的故障灯并没有亮起,请按照以下 如果本逆变器的操作面板上的故障灯并没有亮起,请按照以下 列出的项目检查机器,并确保机器目前的状况能够允许这样的操作。 列出的项目检查机器,并确保机器目前的状况能够允许这样的操作。 —本逆变器是否是安装在干净、干燥、通风的环境中; 本逆变器是否是安装在干净、干燥、通风的环境中; —检查 DC 短路器是否已经断开; 短路器是否已经断开;...
  • Page 48: 逆变器报废

    光伏并网逆变器 12 逆变器报废 12.1 拆卸 · 将逆变器的直流输入端和交流输出端均断开; 将逆变器的直流输入端和交流输出端均断开; · 将逆变器所有的连接缆线拆除; 将逆变器所有的连接缆线拆除; · 将逆变器从安装板上拆除。 将逆变器从安装板上拆除。 12.2 包装 尽可能用原始包装存储逆变器,如果没有原始包装,请使用相似的包装 尽可能用原始包装存储逆变器,如果没有原始包装,请使用相似的包装 并满足以下条件: · 承重能力超过 41 公斤; · 可以完全合上的。 12.3 存储 将逆变器存放在干燥的地方,环境温度在 将逆变器存放在干燥的地方,环境温度在-25 ℃--+70 ℃ 之间(或-13°F to +158°F) 。 12.4 处理 对于今后不再投入运行的逆变器,用户负责进行妥善的废弃处理。逆变 对于今后不再投入运行的逆变器,用户负责进行妥善的废弃处理。逆变 器中包含的电池、模块及其他元器件,可能会对环境造成污染,请根据 器中包含的电池、模块及其他元器件,可能会对环境造成污染,请根据...
  • Page 49: 质保期

    光伏并网逆变器 13 质保期 产品自购买之日起提供五年质保服务。 产品自购买之日起提供五年质保服务。 · 保修产品 保修产品仅限于以下产品: ST10KTL /ST12KTL /ST15K KTL /ST17KTL /ST20KTL · 产品质保(有限责任) (适用于正常应用、安装、使 适用于正常应用、安装、使用及维护的机器)。 茂硕电源承诺上述型号的产品在质保期内没有任何影响使用的缺 承诺上述型号的产品在质保期内没有任何影响使用的缺 陷,且承诺在质保期内为上述型号的产品提供相应的质保服务,质保期 陷,且承诺在质保期内为上述型号的产品提供相应的质保服务,质保期 自产品出厂日期开始计算,标准为 5 年免费质保。 自产品出厂日期开始计算,标准为 关于茂硕电源系列逆变器,如果您有任何疑问 系列逆变器,如果您有任何疑问,请致电服务热线:+ 400-756-5188。 请保留以下信息来更好地为您服务。 请保留以下信息来更好地为您服务。(请注意,为更好地为您服务, 在致电前请提供以下信息): a. 逆变器型号。 b.逆变器的序列号。 c.通讯方式。 d.光伏组件的信息。 e. 经销商。...
  • Page 50 光伏并网逆变器 茂硕电源科技股份有限公司 省深圳市南山区西丽镇松白路 1061 号茂硕科技园 地址: 中国广东省深圳市南山区西丽镇松白路 营销服务中心 电话: 400-756-5188 传真: (86-755) 2765-7908 网站: www.mosopower.com 邮箱: sales.solar@mosopower.com sales.solar@mosopower.com 售后服务中心 电话: 400-756-5188 传真: (86-755) 2765-7908 邮箱: service.solar@mosopower.com service.solar@mosopower.com...
  • Page 51 光伏并网逆变器 Solar On- -Grid Inverter ST10KTL/ ST12KTL/ ST15 TL/ ST15KTL/ ST17KTL / ST20KTL User Manual User Manual Version Version 2.0 (EN)
  • Page 52 光伏并网逆变器 All rights to the content of this manual are owned by MOSO Power Supply All rights to the content of this manual are owned by MOSO Power Supply Technology Co., Ltd (hereinafter “MOSO MOSO”). No part of this document can be...
  • Page 53 Table of Contents USER MANUAL II VERSION 2.0 (EN) 1 ABOUT THIS MANUAL 3 1.1 A ......................3 PPLICABILITY 1.2 T ...................... 3 ARGET ROUP 1.3 S ......................... 3 AFETY 1.3.1 A ................... 3 PPROPRIATE SAGE 1.3.2 Safety Instructions..................4 1.3.3 Safety Symbols ...................
  • Page 54 8.1 S ....................... 26 AFETY 8.2 O ..............26 VERVIEW OF THE ONNECTION 8.3 C PV A (DC) ..............27 ONNECTION OF THE RRAY 8.3.1 Conditions for DC Connection ..............27 8.3.2 Assembling the DC Connectors ..............29 8.3.3 Connecting the PV Array (DC) ..............29 8.4 C (AC).............
  • Page 55: About This Manual

    Please read these instructions carefully before use and keep them for future reference. 1.1 Applicability This manual is applicable to the following inverter types. ST10KTL/ST12KTL/ST15KTL/ST17KTL/ST20KTL 1.2 Target Group This manual is intended for:  Qualified personnel who are responsible for the installation and commissioning of the inverter;...
  • Page 56: Safety Instructions

    A. PV Strings B. ST5-8KTL C. AC Distribution Unit D. Low Voltage Grid Figure 1 Principle of a PV Plant with ST series inverter 1.3.2 Safety Instructions Safety symbols used in this manual, which highlight potential safety risks and important safety information, are listed as follows: CAUTION: Risk of electric shock.
  • Page 57 Warning!  Please do not connect PV array positive or negative to ground, it could cause serious damage to the inverter. PV module used with inverter must have an IEC  61730 Class A rating. Warning! • Ensure that input DC voltage is less than max. DC voltage.
  • Page 58: Safety Symbols

    1.3.3 Safety Symbols This section gives a glossary of all the symbols shown on the inverter and the type label. · Symbols on the inverter Symbol Description Danger of high voltage!  R esidual voltage will vanish in 5 minutes after the inverter disconnected.
  • Page 59 Equipment grounding conductor. AC voltage. You can operate the interface by tapping on it. • Tapping once: The background illumination switches • Tapping again: Updating information. You can operate the interface by pressing buttons. For more information on operating the buttons, refer to Section 7.2 ‘LCD display’.
  • Page 60: Introduction

    2 Introduction 2.1 Overview The image shown here is for reference only. The actual product you receive may differ. Figure 2 Stereogram 2.2 Electrical Block Diagram · Electrical block diagram...
  • Page 61: Product Instruction

    Figure 3 Electrical block diagram 2.3 Product Instruction Figure 4 Name Description The DC switch can disconnect DC Switch strings inverter safely ST Series Inverters PV Terminals have two independent MPP trackers PV1 and...
  • Page 62: Dimension And Weight

    PV2. Per tracker has input terminals. Terminals connect the WiFi Terminal WiFi module or GPRS module. Terminals that connect RS485 Terminals RS485. Release press from Degassing internal. AC Terminals AC output The display shows the status information (e.g. working status, LCD Display power, input voltage) as well as errors and...
  • Page 63 Figure 5 ST10KTL / ST12KTL / ST15KTL / ST17KTL/ST20KTL · Weight Table1 Model ST10KTL ST12KTL ST15KTL ST17KTL ST20KTL Weight 38.5kg 38.5kg 40.8kg 40.8kg 40.8kg...
  • Page 64: Packaging List

    3 Packaging List · List Table2 Item Name Quantity Solar Inverter Mounting Frame expansion bolt PV connector plug bolt plug bolt RS485 connector User Manual The ST series inverter is shipped with the following items:...
  • Page 65 用户 手册 逆变器 用户手册 Figure 6 · Identifying the Inverter You can identify the inverter by the nameplate. The nameplate is located on the right-hand side of the housing. The inverter type (type/model), serial number (serial no.) and other device-specific characteristics are specified on the nameplate.
  • Page 66: Technical Data

    4 Technical Data 4 Technical Data 4.1 Input(DC) Table3 Table3 Inverter Model ST10KTL ST12KTL ST12KTL ST15KTL ST17KTL ST20KTL Input(DC) Max DC power...
  • Page 67: Output(Ac

    Max short-circuit current per MPPT 4.2 Output(AC) Table4 Inverter Model ST10KTL ST12KTL ST15KTL ST17KTL ST20KTL Rated output power 10 kW 12 kW 15 kW 17 kW 20 kW Rated output voltage 3/N/PE~230V/400V AC voltage range 310~480V(Conform to local standards) Rated AC grid...
  • Page 68 Table5 Inverter Model ST10KTL ST12KTL ST15KTL ST17KTL ST20KTL Efficiency Max efficiency 98.2% 98.2% 98.2% 98.2% 98.2% Euro efficiency 97.20% 97.30% 97.50% 97.50% 97.50% MPPT efficiency >99.9% >99.9% >99.9% >99.9% >99.9% Protection DC Switch DC reverse polarity protection DC surge protection...
  • Page 69: General Data

    4.4 General Data Table6 Inverter Model ST10KTL ST12KTL ST15KTL ST17KTL ST20KTL Operating temperature -25℃ ~ +60℃ range Relative operating 0% RH ~ 100% RH humidity Operating altitude 0~4,000 m (Derating above 2000 m) Cooling Fans Display LED + LCD Communication RS485/WiFi(opt.)/GPRS(opt.)
  • Page 70: Function Description

    5 Function Description The basic functions of the inverter are as follows. 【Conversion function】 The inverter converts DC power from the PV array into grid-compliant AC power and feeds it into the utility grid. 【Data storage】 Inverter logs essential data including running information and error records.
  • Page 71: Operation Mode

    6. Operation Mode Figure 7 NOTICE! The inverter output power decrease is usual in the condition of thermal protection, but if it occurs frequently, you need to check the heat sink or consider putting the inverter in the place where have better air flow, and if output power decreases caused by electrical problem, please ask for professional supports.
  • Page 72: Installation

    7 Installation 7.1 Safety Instructions DANGER! Improper installation may cause fire or explosion. • Do not install the inverter on flammable and explosive construction materials. • Make sure there is no electrical connection before installation. CAUTION! Improper carry may cause injury. •...
  • Page 73  The mounting and installation method must be appropriate for the inverter’s weight and dimensions. Mount on a solid surface.  The environment temperature should not exceed the working temperature of the inverter(-25℃ to +60℃; derating between 45℃ to 60℃ ) ...
  • Page 74 • Do not expose the inverter to direct sunlight as this can cause excessive heating and thus power reduction. • In living areas, do not mount the unit on plasterboard walls or similar in order to avoid audible vibrations. When in use, the inverter emits noises which may be perceived as a nuisance in a living area.
  • Page 75: Preparation

    7.3 Preparation Tools for installation. Figure 10 Installation Tools 7.4 Fixed the Mounting on the Wall Space for heat dissipation should be reserved while installing the inverter. Install the inverter with good ventilation condition. Figure 11...
  • Page 76: Fix The Inverter On The Wall

    Align the wall mounting bracket horizontally on the wall with the arrow upwards. Mark the position of the drill holes. Drill the marked holes. Use a drill with a diameter of 8mm and length of 40-45mm. Then install the wall-mounting bracket. Figure 12 7.5 Fix the Inverter on the Wall Mount the inverter to the bracket.
  • Page 77 Figure 13 Fasten the inverter into the T slot. Figure 14...
  • Page 78: Check Inverter Installation Status

    7.6 Check Inverter Installation Status • Check the upper straps of Inverter to ensure it fixed on to the bracket. • Check the secure mounting of the PV-Inverter by trying to raise it from the bottom. • The PV-Inverter should remain firmly attached. •...
  • Page 79: Connection Of The Pv Array (Dc)

    Figure 15 Table 7 Object Description DC switch PV terminals RS485 WIFI Degassing AC terminals 8.3 Connection of the PV Array (DC) 8.3.1 Conditions for DC Connection The inverter has two PV input terminals, "PV1" and "PV2", each of them connects two strings. Up to four strings can be connected in total.
  • Page 80 Figure 1 Figure 16 • The inverter is equipped with a DC switc he inverter is equipped with a DC switch. An external DC breaker is recommended while installing. is recommended while installing. The open circuit voltage of the PV strings cannot exceed the The open circuit voltage of the PV strings cannot exceed the maximum input voltage of the inverter.
  • Page 81: Assembling The Dc Connectors

    PV2 terminal, it is called a mixed connection. • One string can be only connected with one pair of PV terminals and can’t be connected with two pair of PV terminals at the same time. • Otherwise, the inverter will not comply with the requirements of the EMC directive (directive on the electromagnetic compatibility of devices), and will forfeit its operating license.
  • Page 82 accidentally. 2. Strip the insulation layer and protective sleeve of the cable, and leave the bare cooper conductor in 7mm. Figure 18 3. Insert the bare cooper conductor into the pin and make sure no bare cooper conductor is exposed outside. 4.
  • Page 83 Figure Figure 22 8. Using a wrench to take apart the connection when it is Using a wrench to take apart the connection when it is necessary. Figure Figure 23 DANGER! Danger to life due to high voltages. Danger to life due to high voltages. ...
  • Page 84 Steps for DC connection. Figure 24 Figure 24  Make sure the polarity of the output voltage of PV array matches Make sure the polarity of the output voltage of PV array matches the “DC+” and “DC-“symbols. symbols.  Test with a multimeter to make sure the o Test with a multimeter to make sure the open-circuit voltage of the PV module is less than the maximum input voltage of the the maximum input voltage of the...
  • Page 85: Connection To The Electricity Grid (Ac)

    Figure 26 igure 26  All DC inputs should be connected with PV connectors or All DC inputs should be connected with PV connectors or sealed with plugs to make sure the protection degree of sealed with plugs to make sure the protection degree of IP65.
  • Page 86 Table 7 Cable and MCB Specification Model ST10KT ST12KT ST15KT ST17KT ST20KT Cable (Cu) ≥4mm ≥4mm ≥6mm ≥6mm ≥6mm Micro-Brea • Please use multi-core cable. The diameter of the cable (unstripped) should be 14- 25 mm. • Area of cross-section refers to Table 7. •...
  • Page 87: Ac Connection Procedure

    DANGER! Danger to life due to fire. • When the inverter and a load are connected to the same MCB, the protection function of the MCB is not effective. If the load is in short circuit, the MCB can’t detect the current from inverter output and the protection will disable.
  • Page 88 Figure 27 Cable gland Figure 28 Cable through gland Unscrew the screws of AC terminals (see fig 28)   Put the five-cored cable through the connecting box. Connect and lock the cables to corresponding terminals. Make sure the cables be connected correctly. ...
  • Page 89 Figure 30 Figure 31 NOTICE! Risk of fire if two conductors are connected. • If two conductors are connected to one terminal, this may result in a poor electrical contact which could pose a risk of overheating or fire. • Never connect more than one conductor per terminal. ...
  • Page 90: Operation

    9. Operation 9.1 LED Display There are three LED indicators on the panel: Figure 32...
  • Page 91: Dc/Dc Status Led (Green)

    8.1.1 LED1-Green Table 8 No DC input Blinking In waiting mode MPPT is working 8.1.2 LED2-Green Table 9 The inverter is not working Blinking In self-testing mode. Feed into grid 8.1.3 LED3-Red Table10 No Error occurs The inverter is in fault status Normally, after starting up, DC/DC LED and DC/AC LED will light which indicates that the Inverter is feeding electricity to the grid.
  • Page 92 Figure 33 The display on the inverter can be controlled by the buttons or tapping the front of LCD. To save power, the backlight of LCD will turn off automatically in 30 seconds(by default setting). Click any button or one tap will active it again.
  • Page 93: System Page

    Figure 34 Summary diagram 9.2.1 System Page Figure 35 Power: the present power feeding into the grid; Today: Energy exports to the grid in the present day, and updates the data every 10 minutes; Total: Sum of the energy exports to the grid, and updates the data every 10 minutes;...
  • Page 94: Message Page

    Warning, and the report can be found in next page. Warning will be eliminated and the display in this page will be blank. 9.2.2 Message Page Figure 36 The system status is shown on the page of MESSAGE. The first line will show the operation mode like waiting mode, self-testing mode, on-grid mode, and fault mode.
  • Page 95: Setting Up Communication

    DCI Gird over limit GFCI Fault Pv Config Set Wrong Unrecover Phase Sequence Fault HWAD Fault UnrecoverBoost1_ocp UnrecoverBoost2_ocp Relay Short Relay Open Comm Err Fan Fault 10 Setting up Communication 10.1 Communication Terminal Types MOSO ST10/12/815/17/20KTL can RS485 and WiFi communication.
  • Page 96: Communication

    10.2 Communication 10.2.1 RS485 · RS485 Communication (Applied to one inverter or multiple inverters) In general, RS485 can be used for the communication with up to 32 units. The length of cables should be within 1200 meters. Select high-quality network cable; peel the isolation surface, Select 8-wires (orange white, orange, green white, blue, blue white, green, brown white, brown), then follow the same order with the press pliers push into the 8-wire RJ45 crystal head.
  • Page 97 Orange white Orange Green white Blue Blue white Green Brown white Brown · Connection method between RS485 and Webbox Communication cables are used for connection among the ST inverters. A crossover cable is used to connect the inverter with the Webbox.
  • Page 98: 2Build-In Wifi (Optional)

    Figure 40 9.2.2Build-in WiFi (optional) The WiFi communication function is only applicable if the inverter has a WiFi module. The WiFi module is built-in and installed in the inverter before shipment from the manufacturer.
  • Page 99: Troubleshooting

    Figure 41 WiFi interface Figure 41 WiFi interface Please refer to the Please refer to the WiFi configuration instruction. 11 Troubleshooting Troubleshooting If the inverter is unable to work properly, please refer to the following nable to work properly, please refer to the following instructions before contacting your local service.
  • Page 100: Decommissioning

    -Check if the PV string voltage exceeds the input voltage of the inverter. PV Overvoltage -Call the local service office. -Disconnect the PV (+), PV (-) with DC input, then reconnect them. DCI Gird over limit -Check L line and N line to see whether it has connection faults.
  • Page 101: Package

    Please put the wasted inverters & packing materials to a place which is convenient for relevant department to dispose and recycle. 13 Warranty MOSO offers 5-year warranty starting from the inverters delivering from the manufacturer’s warehouse. Warranty certificate represents a five year warranty service for mentioned products since the date of purchase.
  • Page 102 (Only applicable for inverters under normal application, installation, use and service conditions.) ST Series Inverters warrants the above listed products to be free from defects and/or failure specified for a period not exceeding five years from the date of sale as shown in the roof of Purchase to the original purchaser.

This manual is also suitable for:

St12ktlSt15ktlSt17ktlSt20ktl

Table of Contents