Page 1
USER GUIDE Three-Tap Nitro Coffee Kit • ULABACKBARCOFFEE3...
Page 2
1. U-Line Customer Care must be contacted immediately at +1.414.354.0300. 2. Service or repairs performed on the unit without prior written approval from U-Line is not permitted. If the unit has been altered or repaired in the field without prior written approval from U-Line, claims will not be eligible.
Page 3
TOWER INSTALLATION - CDE224B Table of Contents Parts Lists ....................4 Safety and Warning ..................4 Tower Installation ..................5 Connections ....................6 Warranty ....................7...
Page 4
4. Liquid jumper lines (with in-line filters) and gas jumper lines 5. Drip tray 6. Cleaning solution (2-ounce packet) (Additional cleaner, ULACOFFEECLEAN, is available at u-line.com) 7. Two 2.5 Gallon ball lock kegs 8. Adapter plate and gasket Required (not included):...
Page 5
TOWER INSTALLATION - CDE224B Connect Hoses to Tower Make all the hose connections to the tower prior to installing tower onto refrigerator. Attach gas jumper hoses - line up and press in firmly. Note: The connectors at the ends of the gas jumper hoses are narrower to correspond with the connections in the Insert all 4 hoses into the opening.
Page 6
TOWER INSTALLATION - CDE224B Connect to Nitrogen Tank Attach other end of nitrogen hose to T- connector on gas line that goes to each infuser regulator. Assemble and connect tank regulator to tank T-Connector Attach ball valve to tank regulator (not included). Tighten with an adjustable wrench.
Page 7
Attach infuser hoses to T-connectors on infuser regulators. U-Line will replace missing or defective components for 60 days from date of purchase. Contact U-Line at +1.414.354.0300. Proof of purchase is required. Additional tap accessories and cleaning solution are available at your local brewing supply store or online.
Need help?
Do you have a question about the ULABACKBARCOFFEE3 and is the answer not in the manual?
Questions and answers